Project Scheduling for Load Testing Bridges for ENCE 667 Course Project Spring 2001 Justin Myers.

Slides:



Advertisements
Similar presentations
Chapter 7 Project Management
Advertisements

Project Management CHAPTER SIXTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
CPM, Crashing, Resource Leveling using MS Excel & MS Project
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
CEE 320 Spring 2007 Pavement Design CEE 320 Anne Goodchild.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Advanced Project Management - CPH
Systems Analysis and Design 8 th Edition Chapter 3 Managing Systems Projects.
OPSM 639, C. Akkan1 Defining Risk Risk is –the undesirable events, their chances of occurring and their consequences. Some risk can be identified before.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Project Management Operations.
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
9-1 Resource Allocation Some definitions Resource allocation, loading, leveling Expediting and crashing projects Goldratt’s “Critical Chain”
1. Henry Laurence Gantt, A.B., M.E. ( November 1919) was a mechanical engineer and management consultant who is most famous for developing the.
Systems Analysis and Design 8th Edition
Jeopardy Game! Scope Management Time Management Integration Management.
Project Management Outline of Chapters 1-6. Chapter 1 – Project Management Concepts Definition of a project and its attributes Key constraints within.
ELC 347 DAY 8. Agenda Questions Assignment 3 Corrected  4 A’s, One non-submit Assignment #4 Due Capstone Proposal Due Group Progress report due Exam.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Class 28: Chapter 16: Project Management Class 28 Agenda –Collect Player Diary 2 and Conduct Player Audit No ed diaries – 5 PM Deadline –Discuss Grade.
Manitoba Infrastructure and Transportation RADBUG - August 2014 Water Management and Structures.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Office of Highway Safety Bridge Load Rating Dan Walsh.
Office of Research and Engineering Finite Element Analysis Carl R. Schultheisz.
Planning Tools and Techniques BUS 206 Erlan Bakiev, Ph. D. Zirve University Spring 2012.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Software Project Management Task Estimating and Scheduling
Operations Management For Competitive Advantage 1 Project Management Operations Management For Competitive Advantage Chapter 3.
Chapter 8 Resource Considerations
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Management Control of Projects Management Control Systems Chapter 16 September 2014Iwan Pudjanegara SE., MM.1.
Silver Oak College Of Engineering & Technology.
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Structuring Projects.
ME 481 Mechanical Engineering Design Projects Project Management.
ABC POLICY DEVELOPMENT IOWA DOT Norman McDonald, PE Iowa Department of Transportation Office of Bridges and Structures MID-CONTINENT TRANSPORTATION RESEARCH.
Highway Risk Mitigation through Systems Engineering.
Project Management Managing the Transformation Process.
Network Life Cycle Analysis for Bridge Management Rebecca Curtis, P.E. Michigan Department of Transportation Bridge Management Engineer 2015 Transportation.
Advanced Project Management Project Time Management Ghazala Amin.
9-1 Chapter 9 Project Scheduling Chapter 9 Project Scheduling McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Sidewalk and Bus Stop Design Presented by: Dan Feinblum 5/9/01 ENCE 667.
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
Danbro Selected Data For Maps Prioritizing / Ranking Arne Henriksen NVF Annual Bridge Conference 2015.
Highway Reactive Maintenance Darren Coffin-Smith May 2014.
Kansas DOT Research Project Implementation Presented By Rick Kreider (Chief of Research) Created By Susan Barker (T 2 Engineer)
Chapter 6 Scheduling. 222 Learning Objectives  Estimate the duration for each activity  Establish the estimated start time and required completion time.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Operations Management Project Management
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
LOADS 1.
Highway Risk Mitigation through Systems Engineering.
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Work Breakdown Structure.
6 Resource Utilization 4/28/2017 Teaching Strategies
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 002 G4 Design.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
PROJECT MANAGEMENT.
Project Management Operations -- Prof. Juran.
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek
deterministic Fixed and known in advance, representing a
CHAPTER 6 PROJECT TIME MANAGEMENT
TransCAD Vehicle Routing 2018/11/29.
Replacement of Vehicle Bridge over Spring Creek
2. 2 Assessing the Environment Environmental scanning - the screening of large amounts of information to anticipate and interpret changes in the environment.
Project Management CPM/PERT Professor Ahmadi.
AOA A style of project network diagram in which arrows
CHAPTER 6 PROJECT TIME MANAGEMENT
Replacement of Vehicle Bridge over Spring Creek
Presentation transcript:

Project Scheduling for Load Testing Bridges for ENCE 667 Course Project Spring 2001 Justin Myers

Overview of the Bridge Early 1900’s concrete slab construction Inspected every two years Up to 21 1 / 2 ” of asphalt wearing surface Significant “Dead Load” 2000 ADT is 2250, mostly heavy vehicles Local town needs large emergency vehicles to cross over.

“Dead Load” Definition: Continuous Loads applied to the bridge. Loads are caused from the weight of the bridge elements themselves that are permanently fixed into the bridge.

Actions and Findings Action –Analysis of bridge’s structural capacity –Used Am.Assoc. of Highway and Transportation Officials (AASHTO) guidelines Finding –Bridge lacked enough structural capacity based on AASHTO guidelines.

Inadequate Capacity Due to Significant amount of asphalt Limited capacities and engineering calculation constraints set in AASHTO’s guidelines.

Objective: Allow all traffic to cross over the bridge. What are some of our office’s possible solutions????

Possible Solution Options: 1.Replace the entire bridge 2.Load Test the bridge 3.Do nothing and detour heavy vehicles

Option 1: Replace the Bridge Bridge with greater structural capacity could be built. Funding would be difficult.

Option 2: Load Test the Bridge Non-destructive test Determines actual capacity Load Testing found 85% of bridges adequate If Load Test finds inadequate, no chance of meeting AASHTO guidelines

Option 3: Do Nothing Option is always considered in decision making Consequence - heavy vehicles detoured

Management wanted to know probability Used Bayes Rule S1 = Adequate capacity by Load Test. S2 = Inadequate capacity by Load Test. T1 = Bridge meets AASHTO guidelines T2 = Bridge does not meet AASHTO guidelines.

Given P(S1) = 0.85 P(S2) = 0.15 P(T1/S1) = 0.99P(T2/S1) = 0.01 P(T1/S2) = 0P(T2/S2) = 1.0

P(S1/T2) Using Bayes Rule: P(S1/T2) = % Find

Outcomes of Load Testing: Although Low probability (i.e. < 10%) Data for possible replacement in the future. Less costly than replacement Minimal time to conduct relative to replacement time Quality of Load Test is accurate.

Load Test Project Duration was important Done efficiently and accurately. Cost insignificant to replacement. Develop a Critical Path Method (CPM)

Potential Problems Weather Using consultant as a sub-consultant. Communication between the prime and sub-consultants

Critical Path Method: ID all Load Test tasks - refer to handouts. Variation in activity durations due to communication between certain departments. Sketched AOA network of project.

Conclusion Critical Path = 57 days

Probability of project finishing in 50 days. Use Central Limit Theorem. Only 8.23% chance of project finishing within 50 days. Management dismissed the idea.

Management Goals 1.Project Duration after Load Test less than 30 days. 2.Cost of Load Test and data analysis not to exceed $20,000

Given Cost Parameters $55/hr for consultant services $500/hr for use of contractor Each hour exceeded for 30 day timeframe in consultant analysis = $100 Each hour that failed to meet the 2 day requirement for contractor = $100 Each hour exceeded for the 2 day requirement for contractor = $250

Determinations Model found consultants could use up to 218 hours (27 days) to complete Load Test data analysis. Consultants estimated 100 hours for Load Test analysis. Consultants would have 15 “slack” days for other projects.

Load Test:

Expose Bridge reinforcement:

Instrumentation for Load Test

Software connected with instruments.

Trucks are weighed

Weighed with Portable scales

Trucks cross over in specific patterns.

Trucks cross over at the same time.

Trucks cross over along centerline of bridge.

Load Test Project Results Load Test set-up activities and testing completed on time Delays caused by “higher precedent” projects in consultants’ company. Consultants’ report completed 38 days after the Load Test.

Load Test Project Results (continued) Bridge had adequate capacity Consultants were penalized Suggestions to delay dilemma : –increase disincentives constraints in design contract –higher precedence for Load Test data analysis

QUESTIONS????