LCG France Network Infrastructures Centre de Calcul IN2P3 June 2007

Slides:



Advertisements
Similar presentations
HEPiX Edinburgh 28 May 2004 LCG les robertson - cern-it-1 Data Management Service Challenge Scope Networking, file transfer, data management Storage management.
Advertisements

LCG Grid Deployment Board, March 2003 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Status of GridKa for LCG-1 Forschungszentrum Karlsruhe.
IN2P3 Computing Center, Lyon, France Tier1 for Atlas, ALICE, CMS, LHCb
Mihnea Dulea, IFIN-HH Efficient Handling and Processing of PetaByte-Scale Data for the Grid Centers within the FR Cloud 1ST JOINT SYMPOSIUM.
LCG-France Project Status Fabio Hernandez Frédérique Chollet Fairouz Malek Réunion LCG-France Tier-2s & Tier-3s Paris, March 20th 2008.
Resources for the ATLAS Offline Computing Basis for the Estimates ATLAS Distributed Computing Model Cost Estimates Present Status Sharing of Resources.
CCIN2P3 Network FJPPL 2015
Overview of LCG-France Tier-2s and Tier-3s Frédérique Chollet (IN2P3-LAPP) on behalf of the LCG-France project and Tiers representatives CMS visit to Tier-1.
11 September 2007Milos Lokajicek Institute of Physics AS CR Prague Status of the GRID in the Czech Republic NEC’2007.
Regional Computing Centre for Particle Physics Institute of Physics AS CR (FZU) TIER2 of LCG (LHC Computing Grid) 1M. Lokajicek Dell Presentation.
March 27, IndiaCMS Meeting, Delhi1 T2_IN_TIFR of all-of-us, for all-of-us, by some-of-us Tier-2 Status Report.
Questionaire answers D. Petravick P. Demar FNAL. 7/14/05 DLP -- GDB2 FNAL/T1 issues In interpreting the T0/T1 document how do the T1s foresee to connect.
Centre de Calcul IN2P3 Centre de Calcul de l'IN2P Boulevard Niels Bohr F VILLEURBANNE
G.Rahal LHC Computing Grid: CCIN2P3 role and Contribution KISTI-CCIN2P3 Workshop Ghita Rahal KISTI, December 1st, 2008.
Task 6.1 Installing and testing components of the LCG infrastructure to achieve full-scale functionality CERN-INTAS , 25 June, 2006, Dubna V.A.
LHC Tier 2 Networking BOF Joe Metzger Joint Techs Vancouver 2005.
Grid Applications for High Energy Physics and Interoperability Dominique Boutigny CC-IN2P3 June 24, 2006 Centre de Calcul de l’IN2P3 et du DAPNIA.
W.A.Wojcik/CCIN2P3, May Running the multi-platform, multi-experiment cluster at CCIN2P3 Wojciech A. Wojcik IN2P3 Computing Center
Introduction to U.S. ATLAS Facilities Rich Baker Brookhaven National Lab.
Connect communicate collaborate LHCONE L3VPN Status Update Mian Usman LHCONE Meeting Rome 28 th – 29 th Aprils 2014.
GRID development in Russia 1) Networking for science and higher eductation 2) Grid for HEP 3) Digital Divide V. Ilyin SINP MSU.
LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.
Service Challenge Meeting - ISGC_2005, 26. Apr Bruno Hoeft 10Gbit between GridKa and openlab (and their obstacles) Forschungszentrum Karlsruhe GmbH.
ICHEP06, 29 July 2006, Moscow RDIG The Russian Grid for LHC physics analysis V.A. Ilyin, SINP MSU V.V. Korenkov, JINR A.A. Soldatov, RRC KI LCG.
The LHC Computing Grid – February 2008 The Worldwide LHC Computing Grid Dr Ian Bird LCG Project Leader 25 th April 2012.
Data transfer over the wide area network with a large round trip time H. Matsunaga, T. Isobe, T. Mashimo, H. Sakamoto, I. Ueda International Center for.
LCG-France Vincent Breton, Eric Lançon and Fairouz Malek, CNRS-IN2P3 and LCG-France ISGC Symposium Taipei, March 27th 2007.
Network Topologies & Routers By Scott Miller. Network Topology: is the study of the physical and logical connections between input & output devices Physical.
KOLKATA Grid Site Name :- IN-DAE-VECC-02Monalisa Name:- Kolkata-Cream VO :- ALICECity:- KOLKATACountry :- INDIA Shown many data transfers.
National HEP Data Grid Project in Korea Kihyeon Cho Center for High Energy Physics (CHEP) Kyungpook National University CDF CAF & Grid Meeting July 12,
30 June Wide Area Networking Performance Challenges Olivier Martin, CERN UK DTI visit.
High performance Brocade routers
Network infrastructure at FR-CCIN2P3 Guillaume Cessieux – CCIN2P3 network team Guillaume. cc.in2p3.fr On behalf of CCIN2P3 network team LHCOPN.
Network Connections for the Worldwide LHC Computing Grid Tony Cass Leader, Communication Systems Group Information Technology Department 11 th December.
Plans for Service Challenge 3 Ian Bird LHCC Referees Meeting 27 th June 2005.
Materials for Report about Computing Jiří Chudoba x.y.2006 Institute of Physics, Prague.
Connect communicate collaborate LHCONE in Europe DANTE, DFN, GARR, RENATER, RedIRIS LHCONE Meeting Amsterdam 26 th – 27 th Sept 11.
Brookhaven Science Associates U.S. Department of Energy 1 Network Services LHC OPN Networking at BNL Summer 2006 Internet 2 Joint Techs John Bigrow July.
Eygene Ryabinkin, on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014, WLCG Overview Board meeting.
LCG Service Challenges SC2 Goals Jamie Shiers, CERN-IT-GD 24 February 2005.
Status of Tokyo LCG tier-2 center for atlas / H. Sakamoto / ISGC07 Status of Tokyo LCG Tier 2 Center for ATLAS Hiroshi Sakamoto International Center for.
Computing activities in France Dominique Boutigny CC-IN2P3 May 12, 2006 Centre de Calcul de l’IN2P3 et du DAPNIA Restricted ECFA Meeting in Paris.
Connect communicate collaborate LHCONE European design & implementation Roberto Sabatino, DANTE LHCONE Meeting, Washington, June
Homework 1 solutions. Question 1 Solution Q1 Question 2.
IT-INFN-CNAF Status Update LHC-OPN Meeting INFN CNAF, December 2009 Stefano Zani 10/11/2009Stefano Zani INFN CNAF (TIER1 Staff)1.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
LCG-France, the infrastructure, the activities Informal meeting France-Israel November 3rd, 2009.
The status of IHEP Beijing Site WLCG Asia-Pacific Workshop Yaodong CHENG IHEP, China 01 December 2006.
ATLAS Computing: Experience from first data processing and analysis Workshop TYL’10.
CC-IN2P3: A High Performance Data Center for Research Dominique Boutigny February 2011 Toward a future cooperation with Israel.
TEIN2 Report - CN TEIN2/ORIENT Orient is a project linking academic networks in China and Europe Aim is to provide a dedicated high-bandwidth.
LCG France Network Network 11/2010 Centre de Calcul de l'IN2P3/CNRS.
CCIN2P3 Network November 2007 CMS visit to Tier1 CCIN2P3.
KOLKATA Grid Kolkata Tier-2 Status and Plan Site Name :- IN-DAE-VECC-02 Gocdb Name:- IN-DAE-VECC-02 VO :- ALICE City:- KOLKATA Country :-
LHCONE Phase 1 Prototype architecture. Agenda LHCONE FR prototype target architecture LHCONE FR gateways Other tiers 2 connection to LHCONE FR.
T0-T1 Networking Meeting 16th June Meeting
France-Asia Initiative
The Beijing Tier 2: status and plans
2nd Asia Tier Centre Forum Summary report 4th April 2017 edoardo
Status report on LHC_2: ATLAS computing
Status Report on LHC_2 : ATLAS computing
LHCOPN update Brookhaven, 4th of April 2017
Installed Capacity Reports
LCG France Network Infrastructures
Data Challenge with the Grid in ATLAS
LCG-France activities
A high-performance computing facility for scientific research
IN2P3 Computing Center April 2007
Organization of ATLAS computing in France
Presentation transcript:

LCG France Network Infrastructures Centre de Calcul IN2P3 June 2007

2 International Tier2s Throughput obtained today / Megatable Belgium - CMS T2 T2->T1 100Mb/s / 100Mb/s T1->T2 400Mb/s / 200Mb/s Romania - ATLAS T2 T2->T1 ? / 200Mb/s T1->T2 ? / 50Mb/s China - IHEP - ATLAS+CMS T2 T2->T1 30Mb/s / 200Mb/s T1->T2 30Mb/s / 450Mb/s Japan - ATLAS T2 T2->T1 300Mb/s / 200Mb/s T1->T2 100 à 200Mb/s / 400Mb/s RENATER-GEANT-INTERNET2-CSTNET RENATER-GEANT-TEIN2-CERNET T2->T1 70Mb/s T1->T2 70Mb/s For 1MByte/s asked, we want to provision 20Mb/s

3 French Tier2s Throughput obtained today / Megatable GRIF T2->T1 700Mb/s / 650Mb/s T1->T2 700Mb/s / 1000Mb/s LPC Clermont T2->T1 800Mb/s / 150Mb/s T1->T2 800Mb/s / 50Mb/s SUBATECH T2->T1 600Mb/s / 50Mb/s T1->T2 600Mb/s / 50Mb/s

4 Tier1 traffic Throughput obtained today / Megatable T0->CC 3000Mb/s / 3000Mb/s CC->T0 400Mb/s / 100Mb/s T1s->CC ? / 5000Mb/s CC->T1s ? / 5000Mb/s FrenchT2s->T1 / 1000Mb/s T1->FrenchT2s / 1000Mb/s IntlT2s->T1 / 1000Mb/s T1->IntlT2s / 3500Mb/s Traffic through TenGiga CC-CERN done for BNL, FNAL, GirdKA TenGigabits/s CCIN2P3-CERN

5 RENATER4

6 RENATER4 Dark Fiber

7 Tier1’s links

8 Other Tier1s 10Gbps 2x 1Gbps 2007 CC Logical 1Gbps Tier2s Other Tier2s

9 Other Tier1s Backup through Tier1 FZK 10Gbps 2x 1Gbps 2007 CC Logical Tier2s Other Tier2s 1Gbps

10 Other Tier1s Backup through Tier1 FZK 10Gbps 2x 1Gbps 2007 CC Logical 10Gbps Tier2s Other Tier2s

11 Other Tier1s Backup through Tier1 FZK 10Gbps 2x 1Gbps 1Gbps ? 2007 CC Logical 10Gbps Tier2s Other Tier2s

12 CC Physical during 2007 Lyon French Tier2s 10Gbps 2,5Gbps 1Gbps

13 Backup through Tier1 FZKarlsruhe Backup through Tier1 FZKarlsruhe Paris Strasbourg CC Physical during 2007 Lyon French Tier2s 10Gbps 2,5Gbps 1Gbps

14 Backup through Tier1 FZKarlsruhe Backup through Tier1 FZKarlsruhe Paris Strasbourg CC Physical during 2007 Lyon French Tier2s 10Gbps 2,5Gbps

15 French Tier2s Internationals Tier2s Backup through Tier1 FZKarlsruhe Backup through Tier1 FZKarlsruhe Paris Strasbourg CC Physical during 2007 Lyon French Tier2s 10Gbps 2,5Gbps

16 French Tier2s Internationals Tier2s Backup through Tier1 FZKarlsruhe Backup through Tier1 FZKarlsruhe Paris Strasbourg CC Physical during 2007 Lyon French Tier2s 10Gbps 2,5Gbps 2x 1Gbps 1Gbps ?

17 RENATER Services Internes Services Externes 10Gbps 100Mbps 2x 10Gbps CISCO Gbps 10Gbps 1Gbps > 1000 computing servers > 1 Po disks > 5 Po tapes > 1000 computing servers > 1 Po disks > 5 Po tapes LAN CCIN2P3

18 RENATER Internal Services External Services 10Gbps N x 1Gbps LAN CCIN2P3 End 2007 FZK Tier1s Tier2s