Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.

Slides:



Advertisements
Similar presentations
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Advertisements

Expected counting rates. FRS experimental setup Total load is limited by SC1 and MUSIC1.
EAR2 simulation update Collaboration board meeting Christina Weiss & Vasilis Vlachoudis.
Joanne Beebe-Wang 7/27/11 1 SR in eRHIC IR Synchrotron Radiation in eRHIC IR and Detector Background Joanne Beebe-Wang Brookhaven National Laboratory 10/
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
FLUKA radioprotection calculations Maria – Ana Popovici Politehnica University of Bucharest.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Using FLUKA to study Radiation Fields in ERL Components Jason E. Andrews, University of Washington Vaclav Kostroun, Mentor.
Pion yield studies for proton drive beams of 2-8 GeV kinetic energy for stopped muon and low-energy muon decay experiments Sergei Striganov Fermilab Workshop.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
Wayne R. Meier Lawrence Livermore National Lab Heavy Ion Fusion Modeling Update* ARIES e-Meeting October 17, 2001 * This work was performed under the auspices.
Downstream e-  identification 1. Questions raised by the Committee 2. Particle tracking in stray magnetic field 3. Cerenkov and calorimeter sizes 4. Preliminary.
Study of the fragmentation of Carbon ions for medical applications Protons (hadrons in general) especially suitable for deep-sited tumors (brain, neck.
Induced Activity Calculations in Support of D&D Activities at SLAC Joachim Vollaire, Radiation Protection Department.
Radiation therapy is based on the exposure of malign tumor cells to significant but well localized doses of radiation to destroy the tumor cells. The.
1 A.I.Ryazanov, E.V.Semenov and A.Ferrari DPA calculations in irradiated graphite collimator materials under 7 TeV and 450 GeV proton beams ,
LAGUNA/LBNO WP4: secondary beam line status report M. Calviani, P. Velten, A. Ferrari, I. Efthymiopoulos, C. Lazaridis (CERN) + M. Zito, V. Galymov (CEA),
Omega meson in nucleus, experimental study K. Ozawa (Univ. of Tokyo)
First AWAKE dump calculations Helmut Vincke. Beam on dump Muon axis inside and outside CERN Distances: Beam impact point to end of West hall: ~300 m Beam.
Estimation of temperature increase in the dump through Monte – Carlo simulations and rough calculations N. Charitonidis (EN/MEF)
1 dE/dx  Let’s next turn our attention to how charged particles lose energy in matter  To start with we’ll consider only heavy charged particles like.
Ion operation and beam losses H. Braun, R. Bruce, S. Gilardoni, J.Jowett CERN - AB/ABP.
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
Aerosol Limits for Target Tracking Ronald Petzoldt ARIES IFE Meeting, Madison, WI April 22-23, 2002.
Monte Carlo methods in ADS experiments Study for state exam 2008 Mitja Majerle “Phasotron” and “Energy Plus Transmutation” setups (schematic drawings)
Generalized Dalitz Plot analysis of the near threshold pp → ppK + K - reaction in view of the K + K - interaction Excited QCD, Stara Lesna, 4th February.
Light nuclei production in heavy-ion collisions at RHIC Md. Rihan Haque, for the STAR Collaboration Abstract Light nuclei (anti-nuclei) can be produced.
October 2005 Qweak Collaboration Meeting Detailed Design of Shield House and Collimators wrt Backgrounds Yongguang Liang Just getting started – will probably.
Updates on FLUKA simulations of TCDQ halo loads at IR6 FLUKA team & B. Goddard LHC Collimation Working Group March 5 th, 2007.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
DIS Conference, Madison WI, 28 th April 2005Jeff Standage, York University Theoretical Motivations DIS Cross Sections and pQCD The Breit Frame Physics.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Simulation comparisons to BLM data E.Skordis On behalf of the FLUKA team Tracking for Collimation Workshop 30/10/2015 E. Skordis1.
D 0 reconstruction: 15 AGeV – 25 AGeV – 35 AGeV M.Deveaux, C.Dritsa, F.Rami IPHC Strasbourg / GSI Darmstadt Outline Motivation Simulation Tools Results.
Neutron production in Pb/U assembly irradiated by deuterons at 1.6 and 2.52 GeV Ondřej Svoboda Nuclear Physics Institute, Academy of Sciences of Czech.
Case study: Energy deposition in superconducting magnets in IR7 AMT Workshop A.Ferrari, M.Magistris, M.Santana, V.Vlachoudis CERN Fri 4/3/2005.
Heavy stable-particle production in NC DIS with the ZEUS detector Takahiro Matsumoto, KEK For the ZEUS collaboration.
Marina Golubeva, Alexander Ivashkin Institute for Nuclear Research RAS, Moscow AGeV simulations with Geant4 and Shield Geant4 with Dpmjet-2.5 interface.
AWAKE: D2E for Alexey beam properties Silvia Cipiccia, Eduard Feldbaumer, Helmut Vincke DGS/RP.
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
H. Matis, S. Hedges, M. Placidi, A. Ratti, W. Turner [+several students] (LBNL) R. Miyamoto (now at ESSS) H. Matis - LARP CM18 - May 8, Fluka Modeling.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
1 Activation by Medium Energy Beams V. Chetvertkova, E. Mustafin, I. Strasik (GSI, B eschleunigerphysik), L. Latysheva, N. Sobolevskiy (INR RAS), U. Ratzinger.
Internal Target: Progress Report F. F. R. S. L. (* DISAT) Contents: Second target: production.
N_TOF EAR-1 Simulations The “γ-flash” A. Tsinganis (CERN/NTUA), C. Guerrero (CERN), V. Vlachoudis (CERN) n_TOF Annual Collaboration Meeting Lisbon, December.
Multi-Strange Hyperons Triggering at SIS 100
Heating and radiological
Validation of Geant4 against the TARC benchmark: Testing neutron production, transportation and interaction TARC – experimental set-up and aims Geant4.
BEAM LOSS MONITORING SYSTEM
Induced-activity experiment:
S. Roesler (on behalf of DGS-RP)
Collimation Concept for Beam Halo Losses in SIS 100
Short Range NN Correlations (from Inclusive Cross Sections)
Summary of hadronic tests and benchmarks in ALICE
of secondary light ion beams
of secondary light ion beams
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Energy deposition studies in IR7 for HL-LHC
BEAM LOSS MONITORING SYSTEM
JOINT INSTITUTE FOR NUCLEAR RESEARCH
I.Larin, PrimEx Analysis meeting
Russian Research Center “ Kurchatov Institute”
Status of Compton Analysis
Beam-time, June 2009 Beam-time, Oct days of beam time
Scaling Properties of Identified Hadron Transverse Momentum Spectra
Beam Loss Simulations LHC
Beam-time, June 2009 Beam-time, Oct days of beam time
Presentation transcript:

Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of EN/STI

Outline 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 2 Overview of T2 targets FLUKA simulation setup & geometry Energy deposition preliminary studies Production yields of 11 B and 32 P absolute & relative to all isotopes Conclusions & perspectives

Summary 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 3 Preliminary calculation for the optimization of a new target for a fragmented ion beam for the NA61 experiment Primary target is installed (and to be…) in the T2 target box shielded iron box with forced air cooling Iron shielding Primary beam Secondary beam TARGETs T2 target box Cooling fins Target plates Forced air flow

Pictures of one spare target head 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 4 Primary Pb beam Cooling fins 50 cm length 16 cm Spare target head to be eventually reused to install a new target plate in case needed

November 2010 test (Ilias-EN/MEF) 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 5 During the November 2010 production test two targets already in the T2 target box will be used for testing 40 cm beryllium plate 4 cm carbon plate A complete energy deposition study for the Pb beam case is at present being performed, in order to ensure proper/safe mechanical and controlled thermodynamical conditions on the box no need to dismount  targets very radioactive, ~Sv/h at contact)

FLUKA simulations 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 6 Scoring of particles at the end of the chamber “collimator” (30 x 15 cm) – maximum production from target Air Target plate Iron shielding “collimator” 16 cm width, 2 mm height, variable length 30 cm 15 cm ~ 1 m 40 cm DPMJET-3 linked to the executable (HI nuclear reactions) PHYSICS settings in order to include 1) correct evaporation model with heavy fragments, 2) electromagnetic dissociation of projectile and 3) coalescence

Energy deposition (1/2) 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 7 First generic calculation of energy deposition for some plates in T2 16 cm width, 2 mm height, variable length Assuming a Pb beam FWHM=1.4 mm (  =0.6 mm)  is ~ target Part of the beam does not interact AT ALL on the target, proceed outside of the iron shielding to the downstream collimator Total deposited energy 158 AGeV80 AGeV40 AGeV 4 cmC Be 2.05 W/bunch 1.59 W/bunch 2.04 W/bunch 1.59 W/bunch 2.03 W/bunch 1.60 W/bunch 10 cmC Be 3.65 W/bunch 2.79 W/bunch 3.67 W/bunch 2.87 W/bunch 3.79 W/bunch 2.88 W/bunch 20 cmC Be 4.89 W/bunch 3.58 W/bunch 5.06 W/bunch 3.71 W/bunch 4.95 W/bunch 3.71 W/bunch

Energy deposition (2/2) 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 8 Maximum deposited energy density Beam direction More detailed calculation will follow once the final Pb beam spot size (emittance) is clarified

Evaluation of produced particles 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 9 20 cm AGeV All particles B 11 B 20 cm 40 AGeV 11 B 32 P All particles Particle are scored at the exit of the T2 collimator face (only FLUKA heavy ion) these simulations assume only contribution from elements heavier than 7 Be calculations including  (~same A/Z ratio as of 11 B and 32 P) are underway The secondary beam line is assumed to transport all fragments with a chosen rigidity P/Z or B*  within a range of about ±2% the mean value of the P/Z of the selected isotope is selected ±2% Maximize the ratio (of P/Z) between selected isotopes and all the rest

P/Z with all particles produced by target 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) Pb (uncollided + beam halo) Absolute production is dominated by light fragments Protons discarded since they live in the low P/Z area (A/Z~1) 11 B ( 11 C and 32 P) produced in the area dominated by 4 He and d (A/Z~2 area) A/Z~3 A/Z~2 A/Z~1 20 cm, 80 AGeV

20 cm target, 80 AGeV At the exit for the T2 face “collimator”, 105 cm from target Mass d 3 H, 3 He 4 He Correlation between momentum/charge and mass of produced isotopes 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 11

11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 12 Absolute production rates - for 4, 10, 20, 30 and 40 cm targets (158, 80, 40 AGeV Pb beam) Inelastic scattering length is around 3 cm for C and Be, 2-3 for optimal production  max production for ~10 cm

Results (absolute yield) - Carbon 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) AGeV80 AGeV40 AGeV Yield/primaryP/Z intervalYield/primaryP/Z intervalYield/primaryP/Z interval 4 cm8.43*10 -2 ( 11 B) 1.23*10 -2 ( 32 P) 345±7 GeV/c 333±7 GeV/c 9.99*10 -2 ( 11 B) 1.01*10 -2 ( 32 P) 175±4 GeV/c 169±3 GeV/c 1.07*10 -1 ( 11 B) 1.20*10 -2 ( 32 P) 88±2 GeV/c 84±2 GeV/c 10 cm1.49*10 -1 ( 11 B) 2.19*10 -2 ( 32 P) 342±7 GeV/c 330±7 GeV/c 1.34*10 -1 ( 11 B) 2.19*10 -2 ( 32 P) 174±3 GeV/c 163±3 GeV/c 1.89*10 -1 ( 11 B) 2.21*10 -2 ( 32 P) 87±2 GeV/c 83±2 GeV/c 20 cm1.45*10 -1 ( 11 B) 2.13*10 -2 ( 32 P) 340±7 GeV/c 329±7 GeV/c 1.39*10 -1 ( 11 B) 1.85*10 -2 ( 32 P) 172±3 GeV/c 165±3 GeV/c 1.92*10 -1 ( 11 B) 2.37*10 -2 ( 32 P) 85±2 GeV/c 82±2 GeV/c 30 cm1.10*10 -1 ( 11 B) 1.04*10 -2 ( 32 P) 338±7 GeV/c 327±6 GeV/c 1.07*10 -1 ( 11 B) 1.21*10 -2 ( 32 P) 170±3 GeV/c 164±3 GeV/c 1.42*10 -1 ( 11 B) 1.40*10 -2 ( 32 P) 85±2 GeV/c 81±2 GeV/c 40 cm7.46*10 -2 ( 11 B) 6.7*10 -3 ( 32 P) 337±7 GeV/c 327±7 GeV/c 6.62*10 -2 ( 11 B) 4.4*10 -3 ( 32 P) 170±3 GeV/c 163±3 GeV/c 9.40*10 -2 ( 11 B) 9.8*10 -3 ( 32 P) 84±2 GeV/c 80±2 GeV/c Absolute yields of 11 B and 32 P as a function of target length and Pb primary energy around the maximum of the P/Z distributions of the two isotopes (±2%) According to SPSC-P-330-ADD-1 (Addendum 4 to proposal P330), “Proposal for secondary ion beams and update of data taking schedule for )  30 cm target PRELIMINARY

Results (absolute yield) - Beryllium 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) AGeV80 AGeV40 AGeV Yield/primaryP/Z intervalYield/primaryP/Z intervalYield/primaryP/Z interval 4 cm9.83*10 -2 ( 11 B) 1.57*10 -2 ( 32 P) 345±7 GeV/c 333±7 GeV/c 1.16*10 -1 ( 11 B) 1.62*10 -2 ( 32 P) 175±4 GeV/c 169±3 GeV/c 1.19*10 -1 ( 11 B) 1.57*10 -2 ( 32 P) 88±2 GeV/c 84±2 GeV/c 10 cm1.60*10 -1 ( 11 B) 2.57*10 -2 ( 32 P) 342±7 GeV/c 330±7 GeV/c 1.55*10 -1 ( 11 B) 2.49*10 -2 ( 32 P) 174±3 GeV/c 163±3 GeV/c 2.03*10 -1 ( 11 B) 2.73*10 -2 ( 32 P) 87±2 GeV/c 83±2 GeV/c 20 cm1.52*10 -1 ( 11 B) 1.64*10 -2 ( 32 P) 340±7 GeV/c 329±7 GeV/c 1.46*10 -1 ( 11 B) 1.95*10 -2 ( 32 P) 172±3 GeV/c 165±3 GeV/c 1.99*10 -1 ( 11 B) 2.42*10 -2 ( 32 P) 85±2 GeV/c 82±2 GeV/c 30 cm9.67*10 -2 ( 11 B) 1.12*10 -2 ( 32 P) 338±7 GeV/c 327±6 GeV/c 9.03*10 -2 ( 11 B) 1.01*10 -2 ( 32 P) 170±3 GeV/c 164±3 GeV/c 1.42*10 -1 ( 11 B) 1.27*10 -2 ( 32 P) 85±2 GeV/c 81±2 GeV/c 40 cm6.00*10 -2 ( 11 B) 5.10*10 -3 ( 32 P) 337±7 GeV/c 327±7 GeV/c 6.18*10 -2 ( 11 B) 3.60*10 -3 ( 32 P) 170±3 GeV/c 163±3 GeV/c 8.71*10 -2 ( 11 B) 6.30*10 -3 ( 32 P) 84±2 GeV/c 80±2 GeV/c Absolute yields of 11 B and 32 P as a function of target length and Pb primary energy, around the maximum of the P/Z distributions of the two isotopes (±2%) According to SPSC-P-330-ADD-1 (Addendum 4 to proposal P330), “Proposal for secondary ion beams and update of data taking schedule for )  30 cm target PRELIMINARY

Absolute production for 11 B and 32 P around the to maximum of the P/Z distribution 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) % gain with a Be target wrt C target

11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 16 Fractional production rates - for 4, 10, 20, 30 and 40 cm targets (158, 80, 40 AGeV Pb beam)

Results (fractional yields) - Carbon 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) AGeV80 AGeV40 AGeV Fractional yieldP/Z intervalFractional yieldP/Z intervalFractional yieldP/Z interval 4 cm3.72*10 -2 ( 11 B) 8.25*10 -3 ( 32 P) 345±7 GeV/c 333±7 GeV/c 3.83*10 -2 ( 11 B) 7.81*10 -3 ( 32 P) 175±4 GeV/c 169±3 GeV/c 3.84*10 -2 ( 11 B) 8.59*10 -3 ( 32 P) 88±2 GeV/c 84±2 GeV/c 10 cm5.04*10 -2 ( 11 B) 9.76*10 -3 ( 32 P) 342±7 GeV/c 330±7 GeV/c 4.73*10 -2 ( 11 B) 1.07*10 -2 ( 32 P) 174±3 GeV/c 163±3 GeV/c 4.61*10 -2 ( 11 B) 8.39*10 -3 ( 32 P) 87±2 GeV/c 83±2 GeV/c 20 cm7.24*10 -2 ( 11 B) 1.08*10 -2 ( 32 P) 340±7 GeV/c 329±7 GeV/c 7.09*10 -2 ( 11 B) 1.00*10 -2 ( 32 P) 172±3 GeV/c 165±3 GeV/c 6.34*10 -2 ( 11 B) 8.33*10 -3 ( 32 P) 85±2 GeV/c 82±2 GeV/c 30 cm1.01*10 -1 ( 11 B) 8.72*10 -3 ( 32 P) 338±7 GeV/c 327±6 GeV/c 9.98*10 -2 ( 11 B) 1.02*10 -2 ( 32 P) 170±3 GeV/c 164±3 GeV/c 1.00*10 -1 ( 11 B) 7.54*10 -3 ( 32 P) 85±2 GeV/c 81±2 GeV/c 40 cm1.40*10 -1 ( 11 B) 1.08*10 -2 ( 32 P) 337±7 GeV/c 327±7 GeV/c 1.27*10 -1 ( 11 B) 6.73*10 -3 ( 32 P) 170±3 GeV/c 163±3 GeV/c 1.19*10 -1 ( 11 B) 9.23*10 -3 ( 32 P) 84±2 GeV/c 80±2 GeV/c Fractional yields of 11 B and 32 P as a function of target length and Pb beam energy: Ratio between yield of 11 B or 32 P and the total heavy ions exiting the collimator around the maximum of the P/Z distributions of the two isotopes Kinematics effects partially change the results of the absolute yields calculations According to SPSC-P-330-ADD-1 (Addendum 4 to proposal P330), “Proposal for secondary ion beams and update of data taking schedule for )  30 cm target PRELIMINARY

Results (fractional yields) - Beryllium 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) AGeV80 AGeV40 AGeV Fractional yieldP/Z intervalFractional yieldP/Z intervalFractional yieldP/Z interval 4 cm3.86*10 -2 ( 11 B) 1.13*10 -2 ( 32 P) 345±7 GeV/c 333±7 GeV/c 3.98*10 -2 ( 11 B) 1.09*10 -2 ( 32 P) 175±4 GeV/c 169±3 GeV/c 3.80*10 -2 ( 11 B) 8.06*10 -3 ( 32 P) 88±2 GeV/c 84±2 GeV/c 10 cm5.26*10 -2 ( 11 B) 1.04*10 -2 ( 32 P) 342±7 GeV/c 330±7 GeV/c 5.37*10 -2 ( 11 B) 1.06*10 -2 ( 32 P) 174±3 GeV/c 163±3 GeV/c 4.87*10 -2 ( 11 B) 8.45*10 -3 ( 32 P) 87±2 GeV/c 83±2 GeV/c 20 cm8.51*10 -2 ( 11 B) 8.95*10 -3 ( 32 P) 340±7 GeV/c 329±7 GeV/c 8.27*10 -2 ( 11 B) 1.10*10 -2 ( 32 P) 172±3 GeV/c 165±3 GeV/c 7.67*10 -2 ( 11 B) 8.86*10 -3 ( 32 P) 85±2 GeV/c 82±2 GeV/c 30 cm1.11*10 -1 ( 11 B) 1.13*10 -2 ( 32 P) 338±7 GeV/c 327±6 GeV/c 1.07*10 -1 ( 11 B) 1.03*10 -2 ( 32 P) 170±3 GeV/c 164±3 GeV/c 1.12*10 -1 ( 11 B) 8.32*10 -3 ( 32 P) 85±2 GeV/c 81±2 GeV/c 40 cm1.47*10 -1 ( 11 B) 1.09*10 -2 ( 32 P) 337±7 GeV/c 327±7 GeV/c 1.50*10 -1 ( 11 B) 7.31*10 -3 ( 32 P) 170±3 GeV/c 163±3 GeV/c 1.28*10 -1 ( 11 B) 7.79*10 -3 ( 32 P) 84±2 GeV/c 80±2 GeV/c Fractional yields of 11 B and 32 P as a function of target length and Pb beam energy: Ratio between yield of 11 B or 32 P and the total heavy ions exiting the collimator around the maximum of the P/Z distributions of the two isotopes Kinematics effects partially change the results of the absolute yields calculations According to SPSC-P-330-ADD-1 (Addendum 4 to proposal P330), “Proposal for secondary ion beams and update of data taking schedule for )  30 cm target PRELIMINARY

Results - 11 B production for C and Be target 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 19 The fractional yield is enhanced by use of longer target At 158 AGeV primary beam energy, the gain is 15% with respect to 40 AGeV for a 40 cm target (for shorter targets, the dependence is almost constant)  given by the favorable A/Z ratio For the same target length, the gain with a Be target is roughly ~5- 20% than graphite in the same experimental conditions Excluding the contribution of   complete simulations underway

Results – 11 B carbon vs. beryllium targets 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 20 ~5-15% larger yield for a Be target than a C one Higher fractional yield for longer target given by the higher ionization loss of higher Z particles Excluding the contribution of 

Results - Fractional yields of 11 B and 32 P 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) P relative production shows little dependence on target length Fractional yield almost constant Values might be affected by the lack of  in the simulation

Conclusions 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 22  Evaluation of 11 B and 32 P particle yields were estimated with a mock up geometry of the T2 target  Pb beams of 158, 80 and 40 AGeV energy were considered  Different target lengths (4, 10, 20, 30 and 40 cm) and materials (C and Be) were used  Absolute and fractional yields were estimated taking into account the production around the mean value of the P/Z distribution (±2%)  Comments on performed simulations:  basing on the scoring at the end of the “target box” (no secondary beam line nor degrader considered)  maximum production from target   are excluded, but contribution significant: complete evaluation underway  further studies required Complete studies are underway to validate the present targets and the production from an optimized new one

11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 23 Thanks a lot for your attention and for the very interesting experiment!

11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 24 Additions

Total momentum for different beam energies 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) cm target 158 AGeV 80 AGeV 40 AGeV

Contribution from other mass & charge 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 26 All particles 11 B 10 B 12 B Z=4 Z=6

Correlation momentum vs. time from primary beam interaction 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 27 Z=1 20 cm 40 AGeV 11 B

Correlation P/Z vs. time from interaction 11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) B 32 P

11th October 2010T2 target preliminary calculations (NA61 Collaboration Meeting) - M. Calviani (EN/STI) 29