MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

MICE Magnetic Investigation of T2 MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
MICE Target Report Chris Booth (for target team) Sheffield 23 rd April 2009.
Cylinders and Actuators
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
The MICE Target Lara Howlett University of Sheffield.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
Target Status Report Lara Howlett University of Sheffield.
Target Operation and Status Report Chris Booth for Target Team 20 th October 2008.
MICE MICE Target Status P J Smith CM 25 Wed 4 th November 2009.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
T2.4 Performance Test Running in R78. Timeline T2.4 installed in R First inspection on after 200k pulses Little or no wear/dust.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
Report on E-165 Steve Schnetzer MCC Meeting June 28.
P J SmithUniversity of Sheffield1 MICE Target Electronics Paul J Smith University of Sheffield Fermilab 10 th June 2006.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MICE Target Report Chris Booth (for target team) Sheffield 24 th March 2010.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
TARGET WORKSHOP – SHEFFIELD HALLAM UNIVERSITY Monday 2 March 2009 The ISIS – MICE interface Eddie McCarron Contents 1.Target alignment with ISIS beam centre.
Target Specifications & History (to avoid reinventing a broken wheel!) 2 nd December 2009 Chris Booth The University of Sheffield.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
MICE TARGET WORKSHOP – SHEFFIELD 2 nd December Target vibration and general design issues 2. Simple Vibration - causes and forces. 3. Not so simple.
(FEA) Analysis P J Smith University of Sheffield 27 th November 2008.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
DESIGN AND OPERATIONAL EXPERIENCE OF THE MICE TARGET Target Drive The linear electromagnetic drive that has been designed to meet these requirements consists.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
Target Operation and Status Report Chris Booth for Target Team 13 th January 2009 Outline Current target performance Investigation of demonstrator failure.
MICE Target Mechanical Design l Jason Tarrant – STFC »Working on upgrade of Target Mechanics l Contents »Main features of upgrade design »Progress & schedule.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Target Report Introduction Chris Booth Sheffield 20 th November 2008.
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
Jeff Moorman Hydraulic Systems and Flight Control Actuators (301) Navy Rod Seal Testing Project Status as of 1 Sept 2002 Results from Rod Seal.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
MICE MICE Target Mechanism CM38 – Napa Valley P J Smith on behalf of the MICE target team.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
MICE Target l Jason Tarrant – STFC l Investigative work on T2 with plastic bearings »Stopped after >2 million cycles »Disassembly with photographic investigation.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Jason Tarrant / November 2008 MICE Target Mechanical Design l Jason Tarrant – STFC l Introduction »Investigations into target shaft failure »Current suspicions.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Target Status Report Chris Booth & Paul Hodgson Sheffield 18 th Sept ember2008.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
FIELD MAPPING V. Blackmore CM38 23rd February /70.
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
Target Installation Plan
P. J. Smith on behalf of the MICE target team.
MICE Target Report Video Conference 29/11/07
Investigation on tray MID 063 Back
Presentation transcript:

MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)

MICE History & Overview T1 – DLC bearings – running in ISIS (Installed Aug 2009) –> 215k + 50 k actuations - DLC on DLC T2 – nominally identical to T1 –Bearing failed rapidly - DLC on DLC T2.2 – like T1, improved QA –Failed after ~80k actuations - DLC on DLC T2.3 – same stator & shaft as T2.2 –New Vespel (polyimide) bearings – Vespel on DLC –Tested for >2.1M pulses in R78 Jan/Feb 2010 Results of T1 running, T2.3 tests, and plans 08/06/20102P J Smith - University of Sheffield

MICE Actuation 08/06/2010P J Smith - University of Sheffield3 Strike Beam Centre Distance (BCD)

MICE 08/06/2010P J Smith - University of Sheffield4 4 T2 distribution 3-4 times as broad Can be interpreted as a result of the target “sticking” due to adhesive pick-up of particulate DLC - wear. Confirmed when taking target apart – Mice note 269 MICE use the BCD histograms as a diagnostic to spot changes in target performance T1 T2 BCD (beam centre distance) DAQ Analysis (analysis by Paul Hodgson)

MICE Overlay of T1 Calibration Plots 08/06/2010P J Smith - University of Sheffield5 Represents 71K to 142K Actuations

MICE Summary for Target 1 Target continues to perform reliably (> 215k + 50 k actuations) No sign of significant change in BCD distributions No sign of dust production on view port – Latest photo 07/06/2010 – No Dust Target keeps running! 08/06/2010P J Smith - University of Sheffield6

MICE Status of Target 2.3 T2 Vespel installed in R78 Jan 25 th 2010 DLC coated shaft (from T2.2) – Vespel bearings Same stator body as previous T2 Pulsed target continuously for 2.15×10 6 pulses Approx. one month of operation at ~1 Hz Two short interruptions, chiller failed 1/2/2010, UPS failed 8/2/2010(!) Neither problem associated with target mechanical performance Target was deliberately stopped for inspection Very little dust on view-port (~ daily photos) 08/06/2010P J Smith - University of Sheffield7

MICE T2 BCD over month 08/06/2010P J Smith - University of Sheffield8 720k s1680k s Change over ~1 day Start up period DAQ gain changes 1×10 6 pulses EarlyMidLate

MICE T2 Acceleration over month 08/06/2010P J Smith - University of Sheffield9 Chiller failure Test power off UPS failure

MICE T2 Acceleration regions 08/06/2010P J Smith - University of Sheffield10 Steady decline 848 to 838 ms -2 Stable operation (838 ± 5) ms -2 Increased variability Early Mid Late 720k s 1680k s

MICE 08/06/2010P J Smith - University of Sheffield11 Questions and Comments How would the target have performed if we had carried on pulsing ?  Remember we arbitrarily stopped at 2.15 × 10 6 pulses. Does the early period correspond to the target “bedding in” ?  The mid period lasted approx. 1 million pulses where the target showed stable operation.  There was a reasonably rapid (1 day) change in performance after which the target parameters were (slightly) more variable. None of the variation seen above would compromise the normal target operation. The typical beam centre varies more than the target BCD. 11

MICE Disassembly & Inspection of Target 2 (Jason Tarrant) 08/06/2010P J Smith - University of Sheffield12 Target stopped after 2.16M actuations Optics block removed & upper bearing exposed Bellows removed & lower bearing exposed Significant amounts of Vespel dust, adhered to surfaces

MICE Disassembly – View of upper Bearing 08/06/2010P J Smith - University of Sheffield13 First look Little dust (polished flat) Most dust (rough flat) Polished flat Rough flat Amalgamated dust balls Dust On shaft, On bearing, On lock ring Survey point

MICE Disassembly – View of lower Bearing 08/06/2010P J Smith - University of Sheffield14 Dust around bearing, lock ring removed Internal face External face

MICE Observation – Dust Amount –Most at upper bearing – esp. anti-rotate rough flat side –(Only one flat on shaft polished) –Amalgamated at bearings – scraped off Location –Coated internal components, has escaped externally –How does it move / defy gravity? Thrown off? Electrostatic attraction? Vibration movement? When let up to air? Attachment –Fixed – by what? 08/06/2010P J Smith - University of Sheffield15

MICE Stator QA 08/06/2010P J Smith - University of Sheffield16 Is stator 2 different from stator 1? Stator field mapped with assistance of group at Diamond Indication of ~300um offset in magnetic axis. Note: This value is to be re-checked! Stator will be run in R78 with bearings aligned with the offset. Will this improve wear rate? An FE model of the stator has been built, the predicted forces match the observed forces very well. The model predicts strong lateral forces if shaft is not aligned with magnetic axis (for 500  m offset max lateral force = 10% thrust Force) The modelling and field measurements suggest that we need to improve the coil design/manufacture to ensure magnetic axis aligns with the geometric axis.

MICE Next Steps 08/06/2010P J Smith - University of Sheffield17 Reduce wear & dust production - Polished flats, burnished bearing faces - Continue using Vespel (but there are additional plastics that can be tried) - Align bearings with known magnetic offset Trap dust in catcher Further tests to start in June

MICE Summary Target 1 installed and operating well in ISIS Target 2 with plastic bearings performed reliably for >2M actuations –Stopped for inspection, not due to failure Test & measurement programme for reducing and trapping dust Stators have been magnetically mapped to improve QA – indication that there is a magnetic offset with stator 2. 08/06/2010P J Smith - University of Sheffield18