Capital Budgeting Decisions

Slides:



Advertisements
Similar presentations
Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
Advertisements

Lecture 7 Evaluating a Single Project PW, FW, AW IRR
Lecture No. 23 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Chapter 5: Evaluating a Single Project and Comparing Alternatives
(c) 2001 Contemporary Engineering Economics 1 Chapter 16 Capital Budgeting Decisions Methods of Financing Cost of Capital Choice of Minimum Attractive.
Contemporary Engineering Economics, 4 th edition, © 2007 Variations of Present Worth Analysis Lecture No.17 Chapter 5 Contemporary Engineering Economics.
Contemporry Engineering Economics, 4 th edition, © 2007 Equivalence Calculations with Continuous Payments Lecture No.12 Chapter 4 Contemporary Engineering.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Financing Activities Lecture No. 41 Chapter 10 Contemporary Engineering.
Contemporary Engineering Economics, 4 th edition, © 2007 Choice of MARR Lecture No. 62 Chapter 15 Contemporary Engineering Economics Copyright © 2006.
Contemporary Engineering Economics, 4 th edition, © 2007 Benefit-Cost Ratio Lecture No. 66 Chapter 16 Contemporary Engineering Economics Copyright © 2006.
Contemporary Engineering Economics, 4 th edition © 2007 Economic Equivalence Lecture No.5 Chapter 3 Contemporary Engineering Economics Copyright © 2006.
Pemilihan Investasi Terbaik Pertemuan 19 dan 20 Matakuliah: D 0094 Ekonomi Teknik Tahun: 2007.
Internal Rate of Return (Multiple Rates of Return Problem) Lecture No. 20 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Contemporary Engineering Economics, 4 th edition, © 2007 Corporate Income Taxes Lecture No. 35 Chapter 9 Contemporary Engineering Economics Copyright ©
Contemporary Engineering Economics, 4 th edition, © 2007 Rate of Return Analysis Lecture No. 24 Chapter 7 Contemporary Engineering Economics Copyright.
Contemporary Engineering Economics, 4 th edition, © 2007 Estimating Profit from Production Lecture No. 31 Chapter 8 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Contemporary engineering Economics, 4 th edition, © 2007 Design Economics Lecture No.23 Chapter 6 Contemporary Engineering Economics Copyright © 2006.
Lecture No.33 Chapter 10 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Lecture No. 54 Chapter 16 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Interest Formulas – Equal Payment Series
Internal Rate of Return Criterion
Contemporary Engineering Economics, 4 th edition, © 2007 Multiple Rates of Return Problem Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright.
Contemporary Engineering Economics, 4 th edition, © 2007 Discounted Cash Flow Analysis Lecture No.16 Chapter 5 Contemporary Engineering Economics Copyright.
Contemporary Engineering Economics, 4 th edition, © 2007 Economic Service Life Lecture No. 57 Chapter 14 Contemporary Engineering Economics Copyright ©
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Choice of MARR and Capital Budgeting.
Contemporary Engineering Economics, 4 th edition, © 2007 Income Tax Rate To Be Used in Economic Analysis Lecture No. 37 Chapter 9 Contemporary Engineering.
Lecture No. 37 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Effects of Inflation on Project Cash.
Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Internal Rate of Return Criterion.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Process of Developing Project Cash.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis Fundamentals.
Evaluating a Single Project
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Variations in Present Worth Analysis.
Chapter 10 Choices Involving Time Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Design Economics Lecture No. 22 Chapter.
Lecture No.5 Chapter 3 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition © 2010.
Contemporary Engineering Economics, 4 th edition, © 2007 Cost of Capital Lecture No. 61 Chapter 15 Contemporary Engineering Economics Copyright © 2006.
NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
Capital Budgeting: Decision Criteria
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Incremental Analysis Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas – Equal Payment.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Only Operating and Investing Activities Lecture No. 39 Chapter 10 Contemporary.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition 6 Chapter Six Some Alternative Investment Rules.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Profit from Production.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Other Criteria for Capital Budgeting Text: Chapter 6.
Copyright ©2003 South-Western/Thomson Learning Chapter 8 Capital Budgeting and Cash Flow Analysis.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Selection Analysis Method Course Outline 9.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
Effects of Inflation on Project Cash Flows
Variations in Present Worth Analysis
Rate of Return Analysis
Rate of Return Analysis
Equivalence Calculations with Continuous Payments
Equivalence Calculations with Continuous Payments
Internal Rate of Return Criterion
Interest Formulas – Equal Payment Series
Comparing Mutually Exclusive Alternatives
Economic Equivalence Lecture No.5 Chapter 3
Net Present Value and Other Investment Criteria
Investment Chapter 9.
Rate of Return Analysis
Capital Budgeting Techniques
Process of Developing Project Cash Flows
Presentation transcript:

Capital Budgeting Decisions Lecture No. 63 Chapter 15 Contemporary Engineering Economics Copyright © 2006 Contemporary Engineering Economics, 4th edition, © 2007

Example 15.11 Four Energy Saving Projects under Budget Constraints (Budget Limit = $250,000) Investment Annual O&M Cost Annual Savings (Energy) Annual Savings (Dollars) IRR 1 $46,800 $1,200 151,000 kWh $11,778 15.43% 2 104,850 1,050 513,077 kWh 40,020 33.48% 3 135,480 1,350 6,700,000 CF 32,493 15.95% 4 94,230 942 385,962 kWh 30,105 34.40% Contemporary Engineering Economics, 4th edition, © 2007

Contemporary Engineering Economics, 4th edition, © 2007 Marginal Cost of Capital Schedule (MCC) and Investment Opportunity Schedule (OSC) Contemporary Engineering Economics, 4th edition, © 2007

Mutually Exclusive Decision Alternatives (Example 15.11) j Alternative Required Budget Combined Annual Savings 1 2 A1 $(46,800 $10,578 3 A2 (104,850) 38,970 4 A3 (135,480) 31,143 5 A4 (94,230) 35,691 6 A4, A1 (141,030) 46,269 7 A2, A1 (151,650) 49,548 8 A3, A1 (182,280) 41,721 9 A4, A2 (199,080) 74,661 10 A4, A3 (229,710) 66,834 11 A2, A3 (240,330) 70,113 12 A4, A2, A1 (245,880) 85,239 13 A4, A3, A1 (276,510) 77,412 14 A2, A3, A1 (287,130) 80,691 15 A4, A2, A3 (334,560) 105,804 16 A4, A2, A3, A1 (381,360) 116,382 Best Alt.12 Infeasible alternatives Contemporary Engineering Economics, 4th edition, © 2007

Optimal Capital Budget Contemporary Engineering Economics, 4th edition, © 2007

Contemporary Engineering Economics, 4th edition, © 2007 Summary Under conditions of capital rationing, the selection of MARR is more difficult, but generally the following possibilities exist: Conditions MARR A firm borrows some capital from lending institutions at the borrowing rate, k, and some from its investment pool at the lending rate, l. l <MARR< k A firm borrows all capital from lending institutions at the borrowing rate, k. MARR = k A firm borrows all capital from its investment pool at the lending rate, l. MARR = l Contemporary Engineering Economics, 4th edition, © 2007

Contemporary Engineering Economics, 4th edition, © 2007 The cost of capital used in the capital budgeting process is determined at the intersection of the IOS and MCC schedules. If the cost of capital at the intersection is used, then the firm will make correct accept/reject decisions, and its level of financing and investment will be optimal. This view assumes that the firm can invest and borrow at the rate where the two curves intersect. Contemporary Engineering Economics, 4th edition, © 2007

Contemporary Engineering Economics, 4th edition, © 2007 If a strict budget is placed in a capital budgeting problem and no projects can be taken in part, all feasible investment decision scenarios need to be enumerated. Depending upon each investment scenario, the cost of capital will also likely change. Our task is to find the best investment scenario in light of a changing cost of capital environment. As the number of projects to consider increases, we may eventually resort to a more advanced technique, such as a mathematical programming procedure. Contemporary Engineering Economics, 4th edition, © 2007