Lecture Network Analysis
Advertisements

Chapter 7 Project Management
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Copyright © 2008 Pearson Education, Inc. Slide 13-1 Unit 13C Scheduling Problems.
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
Critical Path Analysis. There are no pre-requisites for this Achievement Standard so it can be placed in any course. No knowledge is pre-supposed.
Operations Management Session 27: Project Management.
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
D1: Critical Events And Critical Paths. D1: Critical Events And Paths A critical path is the list of activities on an activity network that, if they are.
Floats in the AoA network
1 Spreadsheet Modeling & Decision Analysis: A Practical Introduction to Management Science, 3e by Cliff Ragsdale.
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Copyright © 2008 Pearson Education, Inc. Slide 13-1 Unit 13C Scheduling Problems.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
إدارة المشروعات Projects Management
Tutorial 2 Project Management Activity Charts (PERT Charts)
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
9-1 Project Scheduling: Networks, Duration Estimation, and Critical Path Chapter 9 © 2007 Pearson Education.
Project Scheduling Critical Path Method
Project Networks. A,4 B,3 C,4 D,6 E,3 H,6 F,5 G,4 I,2 St,0 Fin,0 Example Network - terminology C,t Activity Duration of Activity (ES, LS) Early Start.
Project Management OPER 576 Project Networks Greg Magnan, Ph.D. April 29, 2004.
Activity networks – Example 1 TaskDuration (hours)Immediate predecessors A3- B4- C6- D5A E1B F6B G7C, D, E The table below shows the tasks involved in.
Critical Paths.
Network planning Learning objectives After these lectures you should be able to: - Produce and analyse activities networks - Calculate earliest and latest.
Analysing the AoA network Project Management. Total Project Time The minimum time in which the project can be completed. Calculation: forward pass Forward.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
Module 5 – Networks and Decision Mathematics Chapter 24 – Directed Graphs.
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
1 ARCH 435 PROJECT MANAGEMENT Lecture 3: Project Time Planning (Arrow Diagramming Technique) Activity on Arrow (AOA)
15C Backward scanning and crashing
1 4. Flow-Time Analysis Inventory adversely affects all competing edges (P/Q/V/D)  Has cost  Physical carrying costs  Financial costs  Causes obsolescence.
Flow Time and Theoretical Flow Time
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
© Pearson Education Limited 2004 OHT 8.1 Cadle and Yeates: Project Management for Information Systems, 4th edition Critical Path Method(CPM)
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Business Department Session 6 Exam Question –Draw Network diagram –Identify Critical path –Sketch Gantt Chart –‘Crash’ the project Reduce the project completion.
Project Management Chapter 16. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities Products & Processes.
In Chapter 5: Scheduling the Project From Action Plan and WBS to Gantt chart and project network.  Gantt Chart  Project Network  Activity-on-arrow 
Analysing the AoN network Project Management (seminar)
Critical Path Analysis. Planning and Monitoring Tool.
PROJECT MANAGEMENT Definitions WBS = Work Breakdown Structure
6/10/01Network Problems: DJK1 Network Problems Chapters 9 and 10.
A2 Operations Management Critical Path Analysis. How long will it take? n Walls have decided to launch a new Magnum ice cream. Machine delivery will take.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
15B Critical path analysis. In a critical path analysis, edges represent activities. Nodes (vertices) represent the end of one activity and the start.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Chapter 4 MIS Project Management Lecturer Sihem Smida Sihem Smida Developing a project plan.
Critical Path Method(CPM)
UNIT II Scheduling Procedures & Techniques FLOAT
Activity networks – Example 1
Project Scheduling Lecture # 1.
Project Management for Business
Critical Path Analysis (CPA)
UNIT II Scheduling Procedures & Techniques CRITICAL PATH ANALYSIS
Project Time Management.
Multiple dependency activity on node networks
Analysing the AoA network
Project Scheduling: networks, duration estimation, and critical path
Analysing the AoA network
תזמון פרויקטים.
Analysing the AoA network
1 Total Slack A 3d Task Early Start Late Start Early Finish
Activity on Node Approach to CPM Scheduling
Analysing the AoA network
BEST VIEWED IN SLIDE SHOW MODE
Exercise – A small building.
Analysing the AoA network
Critical Path Analysis
Presentation transcript:

Based on the book: Managing Business Process Flows Flow Time 2-Critical Path Method Based on the book: Managing Business Process Flows

Flow Time Example: Activity Times 4 3 6 2 A1 A3 A4 A6 A5 A2 E S What is the Theoretical Flow Time Critical Path method Ardavan Asef-Vaziri, Sep. 2013 2

Critical Path Method: Paths How many paths? 4 6 A1 A3 E 4 3 S A4 A6 3 2 A2 A5 10 11 8 Critical Path is the longest Path Critical Path method Ardavan Asef-Vaziri, Sep. 2013

Critical Path Example of Flow Time a) The Critical Path is A1-A4-A6. The theoretical flow time of the process is 4+4+3= 11. b) What will happen if activity A5 is increased from 2 to 4? A5 is not on critical path. Increasing its time by 2 increases the length of the path A2-A5-A6 from 8 to 10. It does not become a critical path. The flow time is still 11. c) What will happen if activity A5 is increased from 2 to 5? Critical Path method Ardavan Asef-Vaziri, Sep. 2013 4

Critical Path Example of Flow Time Increasing A5 time by 3 increases the length of the path A2-A5-A6 from 8 to 11. Now both paths of A1-A4-A6 and A2-A5-A6 are critical path. The flow time is still 11. d) What will happen if activity A1 is increased from 4 to 5? Path A1-A4-A6 is still critical and the flow time increases to 12. e) What will happen if activity A3 is increased from 4 to 8? Now path A1-A3 becomes critical and the flow time increases to 4+8 =12. Critical Path method Ardavan Asef-Vaziri, Sep. 2013 5

Theoretical Critical Path vs. Critical Path The time of the critical path differs from the time of the theoretical critical path. Why? 4 6 W1 W2 W4 W3 W6 W7 W5 W9 W8 E A1 A3 4 3 S A4 A6 3 2 A2 A5 The critical path itself also may differ from the theoretical critical path. Why? Critical Path method Ardavan Asef-Vaziri, Sep. 2013 6

Critical Path Methos: Forward Path; Earliest Starts 4 3 6 2 E S 4 4 10 10 11 4 11 4 4 10 4 8 8 11 5 4 8 11 8 5 3 3 3 3 5 Critical Path method Ardavan Asef-Vaziri, Sep. 2013 7

Forward Path; Earliest Starts Max = 30 35 10 35 30 20 5 Critical Path method Ardavan Asef-Vaziri, Sep. 2013 8

Backward Path; Latest Starts 4 3 6 2 E S 10 8 5 11 4 5 11 5 5 11 11 11 4 11 4 8 8 11 11 4 8 8 11 3 8 3 3 6 6 8 8 6 6 Critical Path method Ardavan Asef-Vaziri, Sep. 2013 9

Ardavan Asef-Vaziri, Sep. 2013 Backward Path; Latest Starts Min = 35 30 30 35 45 5 Critical Path method Ardavan Asef-Vaziri, Sep. 2013 10

Ardavan Asef-Vaziri, Sep. 2013 Activity Slack Slack, or float: The amount of time a noncritical task can be delayed without delaying the project Slack—LFT – EFT or LST – EST EST—Earliest Start Time; Largest EFT of all predecessors EFT—Earliest Finish Time; EST + duration for this task LFT—Latest Finish Time; Smallest LST of following tasks LST—Latest Start Time; LFT – duration for this task Critical Path method Ardavan Asef-Vaziri, Sep. 2013 11

Ardavan Asef-Vaziri, Sep. 2013 Critical Path, Slacks 4 6 4 5 11 11 A1 A3 E 11 4 4 10 4 4 8 8 3 11 S A4 A6 4 8 11 3 8 3 6 6 2 8 A2 A5 3 Critical Path method Ardavan Asef-Vaziri, Sep. 2013 12