Start Here EXEMPT No Stormwater Requirements Figure A1. Initial Screening for All Development Projects SFR > 2,500 ft 2 See Figure A4 Is the project Exempt.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

The passage of water through the Drainage Basin
The Drainage Basin System
Chapter 5 Water. Point Source Pollution Comes from a specific source Can be monitored and controlled by a permit system.
Water Budget III: Stream Flow P = Q + ET + G + ΔS.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
LID and Stormwater Technical Resource Center Update County Road Administration Board November 3,
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
CHARACTERISTICS OF RUNOFF
Runoff Estimation, and Surface Erosion and Control Ali Fares, PhD NREM 600, Evaluation of Natural Resources Management.
Runoff Processes Daene C. McKinney
Soil Conservation Service Runoff Equation
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
 Development replaces permeable desert with impermeable roofs and pavement  Increases peak and total stormwater discharge  Classical approach: large.
Dr. Martin T. Auer Michigan Tech Department of Civil & Environmental Engineering Surface Water Supply.
City of Kimball Stormwater Re-use Project Protecting our Water Resources – a Forum Series for Policy Makers March 30, 2011.
Why and How; What’s Working and What Isn’t.  How Low Impact Development can mitigate effects of urban drainage  Applying design criteria for bioretention.
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
Lecture ERS 482/682 (Fall 2002) Why watersheds? ERS 482/682 Small Watershed Hydrology.
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
Hydrographs and Drainage Basins. Drainage Basins: A drainage basin is the catchment area of a river and its tributaries. The boundary of the catchment.
Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011.
How do Wetlands Factor into New Infiltration Policies?
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
Background and Overview Stormwater NPDES Compliance For New Developments.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Putting the “LID” on Water Pollution New Water Quality Requirements for Land Use County of Orange Mary Anne Skorpanich Richard Boon.
VOLUME CONTROL using Inter-Event Dry Periods by Marty Wanielista, Josh Spence, and Ewoud Hulstein Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
Higher Geography: Drainage basins.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Discussion of Proposed MS4 Permit Design Standards Language.
How do humans affect watersheds and the hydrologic cycle ?
What’s New in Stormwater Requirements for Development Projects? Jill Bicknell, P.E. EOA, Inc. New Development Workshop May 22, 2013.
Meander Through flow Discharge Source Mouth Tributary Confluence BankOverland flow.
THE WATER CYCLE 6 TH GRADE SCIENCE MR. RENN Next.
Rebecca Schneider, Nancy Trautmann, & Linda Wagenet Cornell University Roadside Ditches: A Watershed Curriculum Module.
VOLUME CONTROL using Inter-Event Dry Periods Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
PSGB Ecosystem Conference The Effectiveness of LIDs in Reducing Stormwater Runoff February 9, 2009 Doug Beyerlein, P.E. Clear Creek Solutions, Inc.
STORMWATER MANAGEMENT
Drainage Basin. Mississippi River Basin Drainage Basin.
Lisa Hair, PE, USEPA 2012 USACE Silver Jackets Workshop.
How do humans affect watersheds and the hydrologic cycle ?
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
Stormwater Runoff in Waller Creek Watershed
VFR Research - R. Hudson VFR Research Section Introduction to Hydrology Dr. Rob Hudson, P.Geo.
Balancedgrowth.ohio.gov Tools Video Bibliography Checklists Example Codes and Matrices Case Studies Message.
Some Basic Hydrologic Concepts Weir are used to measure volume of water flowing past a point.
LibHydro.
CE 3354 Engineering Hydrology Lecture 2: Surface and Groundwater Hydrologic Systems.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Comprehensive Thinking and Planning
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Modeling an Urban Development with MIKE-SWMM Presented by: Melissa Figurski.
Runoff.
Water Budget III: Stream Flow
Acknowledgement: Mark Clark, Research Assistant Professor
Source: US EPA National Stormwater Calculator Release
The Drainage Basin System
The Global & Local Storage and Flow of Water
Why is water important to the health of the planet?
Slides excerpted from the Ecosystem Services module
Hydrology CIVL341.
The Location & Movement of Water on Earth’s Surface
Hydrology CIVL341 Introduction
OBJECTIVE HYDROSPHERE
Match the drainage basin terms to the correct definitions!
Presentation transcript:

Start Here EXEMPT No Stormwater Requirements Figure A1. Initial Screening for All Development Projects SFR > 2,500 ft 2 See Figure A4 Is the project Exempt or does not discharge to MS4? Project is < 2,500 ft 2 of new and replaced impervious surface Project is a detached single- family residence? All Others See Figure A2 YES NO Flow Chart to Determine Performance Requirements

Figure A2. Requirements for Small to Moderate Development Projects Projects ≥ 2,500 ft 2 Project is > 2,500 ft 2 of new and replaced impervious surface but < 5,000 ft 2 of net impervious area Project is > 5,000 ft 2 net impervious area but < 15,000 ft 2 of new and replaced impervious surface Project is >15,000 ft 2 of new and replaced impervious surface Performance Requirement #1 (Site Design) Performance Requirements #1 (Site Design) and #2 (WQ Treatment) See Figure A3

Project creates > 22,500 ft 2 of new and replaced impervious surface Figure A3. Requirements for Large Development Projects Yes No additional Stormwater Requirements Does the project fall under the Special Circumstances designation? See Special Circumstances (Performance Requirement #5) No Watershed Management Zone Apply Performance Requirement #4 (Peak Management) Projects ≥ 15,000 ft 2 New and Replaced Impervious Area Yes 1.Retain 95 th Percentile event via infiltration 2.Retain 95 th Percentile event via storage, harvesting, infiltration, and/or evapotranspiration 3.N/A 4.Retain 95 th Percentile event via infiltration where overlying groundwater basin 5.Retain 85 th Percentile event via infiltration 6.Retain 85 th Percentile event via storage, harvesting, infiltration, and/or evapotranspiration 7.Retain 95 th Percentile event via infiltration where overlying groundwater basin 8.Retain 85 th Percentile event via infiltration 9.Retain 85 th Percentile event via storage, harvesting, infiltration, and/or evapotranspiration 10.Retain 95 th Percentile event via infiltration where overlying groundwater basin Determine WMZ and apply Performance Requirement #3 (Runoff Retention) Project in WMZ 1, 2, 3, 6, or 9 No Yes

Performance Requirement #1 Project is > 2,500 ft 2 new and replaced impervious surface, but < 15,000 ft 2 net impervious area Project is > 15,000 ft 2 net impervious area, but < 22,500 ft 2 new and replaced impervious surface Performance Requirement #s 1, 2, and 3 Project is > 22,500 ft 2 new and replaced impervious surface Performance Requirement #s 1, 2, 3, and 4 Figure A4. Requirements for Single-Family Residential Projects Detached Single-Family Residential Projects