POWERLINKS TRANSMISSION LIMITED a joint venture of TATA POWER &POWERGRID.

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

REALTY KNOWLEDGE ARBITRAGE ADDING VALUE THROUGH AT LandSmiths Projects Pvt. Ltd. Credentials Statement.
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Microfinance - SIDBI’s Perspective Lending & Investment P. K. Saha Chief General Manager.
STRATEGIC PLANNING FOR Post-Clearance Audit (PCA)
I-4 Ultimate with Lanes Project Central Florida 1 May 21, 2013.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
1 NEDPower Mount Storm Wind Farm Project Update 10/20/2009.
THE STATUS OF POWER SECTOR REGULATION IN NEPAL THE ELECTRICITY TARIFF FIXATION COMMISSION FORMED IN 1994 IN ACCORDANCE WITH ELECTRICITY ACT OF 1993.
Review of the Accounting Process
Review of the Accounting Process
BIG Process Flow Annexure A1. Call for Proposals Opens Call for Proposals Closes BIG Partners assigned proposals to review Preliminary screening by BIG.
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
Massimiliano Di Pace1 EU TRADE POLICY Eu provides also initiatives, financing and services to support Eu companies’ efforts for internationalisation The.
Public Private Partnership- Identification, Viability and Implementation Prof. Yashvir Tyagi Prof. Yashvir Tyagi Department of Economics Department of.
AfDB - EBRD Joint conference in procurement reform in North Africa and SEMED Countries Marrakech 22 and 23 April 2013 Jordan Delegation 22-23/4/2013.
Overview Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO.
Business Acquisition Process Implementation & transition Closing Negotiation of the transaction Due Diligence Engagement TargetIdentification.
Cross-Border Trade in Power A Presentation by Shri S.K. Dube, Director (Operations) CII –PTC Conference 15/10/2003.
Financing Urban Public Infrastructure
Investment Philosophy & Process Page 1. Key success factors for credit investments in India On ground presence to source, understand & manage credit,
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
Pallatana-Bongaigaon Transmission System. 2 Generation Project Summary  Pallatana (726.6 MW): being implemented by OTPC –Unit - 1 : Dec-2011 –Unit -
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
November, 2000 Slide 1 Project Services Division RISK MANAGEMENT Project Services Division Presentation By: Adam Malkhassian November, 2000.
Presentation on CERC Discussion Paper on Tariff Norms By powergrid.
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
TERM LOANS PROCEDURAL REQUIREMENTS. Obligations of assistance.
DEVELOPMENT OF SOUTH ASIAN GRID. WHY SOUTH ASIAN GRID ? Optimal Utilization of Natural Resources Opportunity of Energy Trading Economy of Scale Advantage.
Power Transmission & Distribution Project LARSEN & TOUBRO LIMITED ECC DIVISION Front Page
Specification & Quantities Estimating
Sanjay Garg General Manager PGCIL/ Ministry of Power
Public Procurement Reforms
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
Energy for the Future Belene Nuclear Power Plant Project Status.
REVIVING INVESTMENT IN THE MENA REGION 6 December 2011 Alexander Böhmer, Head, MENA-OECD Investment Programme.
Joint Venture Agreements. Joint Ventures Joint Venture (JV) : Two or more construction contractors jointly competing for a particular project pooling.
Inter-American Development Bank Private Sector Financing and the IDB Presentation by the IDB Private Sector Department February 2004.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Corporate Office Ambience Corporate Tower, Ambience Mall, Ambience Island NH-8 Gurgaon
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
1 Teaching Innovation - Entrepreneurial - Global The Centre for Technology enabled Teaching & Learning, N Y S S, India DTEL DTEL (Department for Technology.
In-depth Assessment Martyn Gorton WDH. WDH Joint Venture.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
RURAL CREDIT IN ROMANIA - PRE - ACCESION PERIOD- Brussels, January 27, 2011 MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Environmental & Social Compliance in PROJECT FINANCING
2nd Global Procurement Conference | 4-5 July 2017
Operationalizing One Nation One Grid
Administration of a FIDIC Contract - Pre-Contract Phase -
Alternative Energy Promotion Center (AEPC)
Demonetization and its impact on the Financial Sector in India
Challenges in Financing Renewable Energy
Environmental & Social Compliance in PROJECT FINANCING
Makerere University Investors Conference
CASA-1000 TAP Afghanistan’s Energy Connectivity ,Central to South Asia
ART OF PREPARATION AND PRESENTATION OF PROJECT FEASIBILITY REPORTS
Far Experimental Hall Hutches Civil Construction
Annual meeting of Ispa partners 2003
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Contract Requirements for Suppliers
Presentation transcript:

POWERLINKS TRANSMISSION LIMITED a joint venture of TATA POWER &POWERGRID

INDIA ELECTRICITY Plenary Session III - TRANSMISSION May 12, 2006 New Delhi Movie

BackgroundBackground To evacuate power from Tala Hydro-Electric Project in Bhutan and surplus power in East and North-East regions to facilitate creation of transmission highway to transfer power to the power starved Northern region. To evacuate power from Tala Hydro-Electric Project in Bhutan and surplus power in East and North-East regions to facilitate creation of transmission highway to transfer power to the power starved Northern region. Tala hydro-electric Plant being developed by GoI and GoB on the near Honka village (3 Kms. Downstream of existing Chukha Tail Race) Tala hydro-electric Plant being developed by GoI and GoB on the near Honka village (3 Kms. Downstream of existing Chukha Tail Race) Beneficiary states: Eastern and Northern Region states Beneficiary states: Eastern and Northern Region states The total transmission project is being developed by Powerlinks and PGCIL. The total transmission project is being developed by Powerlinks and PGCIL. To evacuate power from Tala Hydro-Electric Project in Bhutan and surplus power in East and North-East regions to facilitate creation of transmission highway to transfer power to the power starved Northern region. To evacuate power from Tala Hydro-Electric Project in Bhutan and surplus power in East and North-East regions to facilitate creation of transmission highway to transfer power to the power starved Northern region. Tala hydro-electric Plant being developed by GoI and GoB on the near Honka village (3 Kms. Downstream of existing Chukha Tail Race) Tala hydro-electric Plant being developed by GoI and GoB on the near Honka village (3 Kms. Downstream of existing Chukha Tail Race) Beneficiary states: Eastern and Northern Region states Beneficiary states: Eastern and Northern Region states The total transmission project is being developed by Powerlinks and PGCIL. The total transmission project is being developed by Powerlinks and PGCIL. River Wangchu River Wangchu

POWERLINKS Transmission Limited is executing India’s first private sector inter- state transmission project on BOOT basis POWERLINKS Transmission Limited is executing India’s first private sector inter- state transmission project on BOOT basis Set up as a 51:49% JV between Tata Power and POWERGRID Set up as a 51:49% JV between Tata Power and POWERGRID PGCIL to buy entire transmission capacity PGCIL to buy entire transmission capacity

Fast Track Project  TATA Power was selected as JV Partner – 22 nd OCT 2001  Original Schedule as per Feasibility Report- 42 Months  Agreements(Share Holders Agreement / Implementation Agreement / Transmission Services Agreement) signed--- 4 th JUL 2003 (for completing project in 36 Months)  Transmission License Received from CERC - 13 th Nov 2003  Loan Agreements signed with IDFC/SBI/IFC/ADB in Jan 2004

Fast Track Project---Cont’d  Financial Closure achieved in record time of 10 months (12 th May 2004)  All Major Orders (LOAs) awarded-Dec 03/Mar 04  Supplementary Agreements(Implementation Agreement and Transmission Services Agreement) signed after approval of CERC on 07/10/2004  Lahmeyer International appointed as Lender’s Independent Engineer.  ERP for F&A was implemented on 01 st Oct 2004  awarded – Sept 05 ISO 9001, ISO 9001, ISO 14001, ISO 14001, ISO ISO 18001

Transmission Route A1 A2 A3 A4 A MW 3000 MW LINE CAPACITY (A6)

Project Volumes : 1. Tower Steel:67500 MT (33400 MT-HT Steel) (34100 MT-MS Steel) 2. Reinforcement Steel:15500 MT 3. Concreting:1,80,000 CuM 4. Excavation:12,12,000 CuM 5. Total Circuit kms: Total Towers:3152 nos. 7. Total Conductor:22000 kms. 8. Total Insulator Strings24500 nos. (As per original B.Q.)

kV Siliguri – Purnea Line (Completed) (Completed) kV Purnea – Muzaffarpur (Completion expected : end May 2006) (Completion expected : end May 2006) kV Muzaffarpur – Gorakhpur (Completed) (Completed) kV Gorakhpur – Lucknow (Completed) (Completed) kV Bareilly - Mandaula (Energised-1 st May 2006) (Energised-1 st May 2006) kV Muzaffarpur – Muzaffarpur (Completed) (Completed) - 1 st July st April 2006 Agreed Commercial Operation Dates (CODs)

Cost Details Rs Crores – Original cost as approved by CCEA on 2 nd July, 2003 based on August, 2002 level Rs Crores – Project Cost based on August, 2002 level and considering the awarded price for Tower packages. This cost was considered by the Lenders for signing the Loan Agreements – This Revised Cost Has Been Approved By Govt. Of India Rs Crores

Cost Details Initial Project Cost is Generally Based On Walk-Over Survey Data (Line Length & Type Of Terrain, Major Crossing etc.) At FR Stage Cost is Calculated Based On Survey Data and Prevailing Budgetary Cost of Equipments / Services. Before Tendering,Cost is Updated Based On Preliminary Survey Data (Detail BOQ) and Escalation, If any

Cost Details – Final Completed Project Cost Final Completed Project Cost is Arrived At By : Initial Project Cost (FR Cost) Plus Escalation On Material Cost Plus Other Costs

Major Constituents of Transmission Line JV Projects Government Project Promoters Financiers

Government:- Policy & Regulatory Framework to Spell Out: Debt:Equity Ratio and Procedure For Approval Of Completed Project Cost Legal Framework to Deal With ‘Non Payment’ Of Dues Return On Equity Procedure For Getting Clearances From Other Departments Avoidance of multiple taxes Available tax incentives to be extended sufficiently in advance

Project Promoters Should assess all and business opportunities upfront Security mechanism towards transmission service payments ‘Risk Factors’

Financiers Financiers Must Evolve Simple and Clear-cut Instrument for Project Appraisal (Particularly For Transmission Project), Risk Mitigation (Particularly Insurance of TL Asset Against Loss Of Revenue/ Business) Simplification of documentation

Learnings from our experience 1. Pre Award Activities Scope for Improvement OKOK 1.2. Surveying 1.3. Estimation 1.4. Tendering & Award Placement 2. Post - Award Activities 2.1. Project Management 2.2. Engineering Activities

2.3. Field Activities Scope for Improvement OKOK Preparation of Ground Profile Tower Spotting Foundation Site Store Management Tower Erection : Technical : Safety : Safety Tower Erection : Technical : Safety : Safety Stringing : Technical : Safety : Safety Stringing : Technical : Safety : Safety Learnings from our experience

To sum up… This is the first transmission project in Private sector, which has already set precedence for other projects to follow. To make this project a big success, it is essential that all the concerned agencies including promoters, company, partner contractors & government regulatory body join hands in removing the obstacles for transmission sector to tread on a new path. This is the first transmission project in Private sector, which has already set precedence for other projects to follow. To make this project a big success, it is essential that all the concerned agencies including promoters, company, partner contractors & government regulatory body join hands in removing the obstacles for transmission sector to tread on a new path.

Thank You!