Relevant Procedures and approaches in PPI Relevant procurement procedures subject to the Public Procurement Directive 2014/24/EU Potential tender approaches.

Slides:



Advertisements
Similar presentations
Award criteria Jari Kallio European Commission
Advertisements

General introduction to Community legislation in the field of Public procurement the classical sector – Directive 2004/18/EC Mr. Jari Kallio DG MARKT Directorate.
EU- Green Paper Strategic use of PP in response to new challenges How to buy v. What to buy AUT position Michael Fruhmann.
Research and Innovation Research and Innovation Brussels, 12 November 2013 Types of Action Focus on Innovation Actions and the SME Instrument.
DME PANEL CONTRACTS John Fisher Program Manager – Procurement.
Tendering Yuck!.
Guide for setting up Framework Agreements
HAYLEA CAMPBELL SUSTAINABLE PROCUREMENT IN THE EU.
Towards the Romania of PRINCIPLES OF PROGRAMMING The social and macroeconomic policy of Europe is the policy of Romania EU projects represent a.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU PROCUREMENT PROCEDURES FOR THE AWARD OF CONCESSION/PPP CONTRACTS.
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
Depth and diversity of a competitive EDTIB: SMEs in defence The European Defence Agency Pieter Taal Assistant Director, Industry & Market Directorate Berlin.
GPP in the new PP directives Peter Nohrstedt. Structure of the presentation New PP support organisation in Sweden GPP in the EU PP directives – what is.
Energy efficiency measures in the public building sector: the DEEP project Freiburg, 14 June 2007 Philipp Tepper Sustainable Procurement ICLEI - Local.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Martin Oder, LL.M. The Emerging Role of the Competitive Dialogue.
Monitoring and Evaluation in Humanitarian Aid: Quality Procedures PROJECT – STRAND 1 – Training and Capacity Building.
The Lean Sourcing Process
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
1 “Summary results of the comparative survey on the transposition of Directive 2009/81” Col. Paolo LIZZA IT MoD SGD-DNA Rome, 12 july 2011”
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
Contratación en los Organismos Internacionales de Propiedad Industrial Ignacio de Medrano Caballero Director Adjunto Área de Recursos Humanos 25/10/2011.
Nordic PPI Net Legal Practices and Recommendations.
Sustainable Procurement and Community Benefits Getting ready for Procurement Reform in Scotland Jennifer Marshall.
1 Public Procurement of Innovations a driver for future health in Europe - Stockholm, 13 October 2009 Public Procurement Directives supporting innovation.
Implementation of EU Electronic Communication Directives.
Creating the global research village EU Procurement Nicola Anson, DANTE TF-MSP Meeting, 1 March 2011.
VALUE FOR MONEY 1 OGC buying.solutions Procurement of Projects Presented by Andy Hamer Pre Accession Advisor, Finance Ministry.
Socially Responsible Public Procurement Ethical Procurement Christine Storry 25 March 2011.
Biofuels – EU policy context Funding and Legislation Workshops Glasgow, 26 May 2011 Francesca Giannini Scotland Europa.
Regional Policy Common Strategic Framework The Commission's revised proposal for the CPR - COM (2012) 496 of 11 Sept.
Spectrum authorisation under new EU package Roger Stewart Radiocommunications Agency Head of licensing policy unit.
Pre-Commercial Procurement (PCP) Actions Open call in Objective 11.1 Calls for PCPs in specific public sector domains in objectives 5.3, 5.4 and 3.5
1 Public Procurement Local Government Network Conference Warsaw Thorsten Behnke 26 April 2005.
1 Eurostat’s grant policy for 2010 Luxembourg, 23/03/2010 Unit A4 – Financial Management Section 3 – Grant procedures and agreements.
1 Mainstreaming Innovation Procurement in Europe - Finnish point of view EAFIP, Paris Kirsti Vilén Ministry of Employment and the Economy.
Joint Procurement of medical countermeasures EMCDDA Workshop Lisbon, 16 june 2015.
Legal chapter in outline – 1’st draft P4ITS meeting # 8, Genoa, 2-3 December 2015.
WOUTER STOLWIJK Sustainable Public Procurement in the Netherlands Innovative tools November 2015.
Possibilities for joint procurement of commercial cloud services for WLCG WLCG Overview Board Bob Jones (CERN) 28 November 2014.
Energy Efficiency: from Policy to Implementation Investing in Energy Efficiency Conference Sofia, 14 th November 2012 Prof. Diana Mangalagiu Smith School.
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 15 – Energy – Upstream Hydrocarbons.
1 New EU legislation to prevent trading in illegal timber on the EU market SARAWAK INDUSTRY UPDATE Kuching, 20 July 2009 Vincent van den Berk European.
Rules overview (1 hour presentation) User instructions This ppt deck is designed to provide a basic presentation for internal use in your organisation.
Logo area The PCP Principles Open Market Consultation 30 th of March Christophe Veys Procurement Service Procurement Legal Adviser
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 31 – Common Foreign and Security Policy.
The Challenge of Deciding What Procurement Method to Use
Public Procurement Agency - Bulgaria
Public procurement of innovation
Bulgarian Small and Medium Enterprise Promotion Agency
Guide for setting up Framework Agreements
European Commission “Intelligent Energy for Europe”
Sustainable Procurement Duty
SC : Pre-commercial procurement on soil decontamination
European Trend Chart on Innovation
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
Workshop ESF and tendering 11 October 2006, Brussels Directive 2004/18/EC Tendering of public contracts Robert Wein, European Commission Disclaimer:
Paris, 27&28 October 2015.
Demonstration activities and links with the European Innovation Partnership and Structural Funds Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including.
Steps during and after a Pre-commercial Procurement
Steps during and after a Pre-commercial Procurement
PPI Pilot Instrument in CIP-PSP-ICT-2013 Objective 3
Andrea Sundstrand Associate Professor
Steps during and after a Pre-commercial Procurement
Steps during and after a Pre-commercial Procurement
Outline Background: development of the Commission’s position
Modernisation of EU public procurement policy
A Clean Planet for all A European strategic long term vision for a prosperous, modern, competitive and climate neutral economy.
Presentation transcript:

Relevant Procedures and approaches in PPI Relevant procurement procedures subject to the Public Procurement Directive 2014/24/EU Potential tender approaches in PPI

The Commissions definition of PPI From the FAQ’s on PCP published on the cordis.europa.eu: FAQ no 19: PPI is when contracting authorities, possibly in cooperation with additional private buyers, act as lead customer (also called early adopter or launching customer) by procuring 'innovative’ solutions (not the R&D to develop them) that are newly arriving on the market but that are not yet available on large scale commercial basis due to a lack of market commitment to deploy. A demand-side policy instrument to enhance market penetration speed for ‘innovative solutions’

Everett Roger’s S curve – the tilting 50 % to convince the market

How the Commission connects PPI to PCP

A definition that makes PPI a supplement to PCP or other R&D procurements (art. 14 of Directive 2014/24, art. 16 f of the “old” Directive 2004/18/EC does not directly link PPI to procurement of R&D or mixed procurements of R&D and commercial procurement makes PPI the ‘Phase 4’ of PCP makes PPI a policy related instrument with the goal of enhancing deployment of already developed “innovative solutions”

The ‘mission-oriented’ definition of PPI From the publication “PPI as Mission-oriented Innovation Policy”, Professor Charles Edquist, Lund University, 2012 PPI occurs when a public organization places an order for the fulfillment of certain functions within a reasonable period of time (through a new product). Hence, the objective (purpose, rationale) of PPI is not primarily to enhance development of new products, but to target functions that satisfy human needs or solve societal problems.....innovation is needed in all PPI before delivery can take place. In contrast to PPI, regular procurement occurs when public agencies buy ready made products such as pens and paper “off-the-shelf”, where no innovation is involved.

A definition that directly link PPI to procurement of R&D/innovation or mixed procurements of R&D and commercial procurement presupposes that PPI’s will always relate to “solutions” that is not already on the market and ready to “plug-and-play” link PPI to (further) demand-side driven innovation in a view to fulfil specific needs

‘Innovation ‘ Directive 2014/24/EU (Procurement directive) Article 2, no. 22 ‘innovation’ means the implementation of a new or significantly improved product, service or process, including but not limited to production, building or construction processes, a new marketing method, or a new organisational method in business practices, workplace organisation or external relations inter alia with the purpose of helping to solve societal challenges or to support the Europe 2020 strategy for smart, sustainable and inclusive growth;

‘Research & Development’ Directive 2009/81/EC (Defence and security directive) Article 1, no. 27: ‘Research and development’ means all activities comprising fundamental research, applied research and experimental development, where the latter may include the realisation of technological demonstrators, i.e., devices that demonstrate the performance of a new concept or a new technology in a relevant or representative environment; See also recital no. 13.

‘Research and innovation projects’ Directive 2014/24/EU (Procurement directive) Article 31 (6) – Innovation partnerships “….research and innovation projects aimed at meeting the needs identified by the contracting authority that cannot be met by existing solutions.”

The “common” understanding of PPI Commercial procurement Procedures subject to the procurement directives With the aim of procuring ‘innovative solutions’ or improving or applying/deploying already invented solutions Might contain R&D, which (seen isolated) could have been procured in accordance with the exemption rules in art. 14 (Dir. 2014/24/EU) or art. 16 f (Dir. 2004/18/EC)

Relevant procedures for PPI subject to the Public Procurement Directive 2014/24/EU In principle – any procedure The obvious procedures Innovation partnership (art. 31) Competitive dialogue (art. 30) Competitive procedure with negotiation (art. 29) Design contest (art. 78) The “light regime” – social services (art. 74)

Relevant procedures for PPI subject to the Public Procurement Directive 2014/24/EU The less obvious procedures – but in practice the most utilised (and encouraged) procedures: Open procedure (art. 27) Restricted procedure (art. 30)

Innovation partnership “The innovation partnership shall aim at the development of an innovative product, service or works and the subsequent purchase of the resulting supplies, services or works, provided that they correspond to the performance levels and maximum costs agreed between the contracting authorities and the participants.” The “commercial extension” of PCP

Competitive dialogue and competitive procedure with negotiation Article 26 (4) (a) with regard to works, supplies or services fulfilling one or more of the following criteria: (i) the needs of the contracting authority cannot be met without adaptation of readily available solutions; (ii) they include design or innovative solutions;

Potential tender approaches in PPI

Early announcement Forward Commitment Procurement Early announcement of intention to procure or the deploy innovative solutions “Prior information notice” in the OJEU (Official Journal of the European Union) Between announcement and tender: preliminary market consultation (art. 40) – have the industry solutions reached the required readiness (technology, tests, price?)

Early announcement (continued) Combined with long time limits for the receipt of tenders? Guarantee of minimum procurement volume? Notice: Restricted opportunity for dialog during the period from publication of contract notice to time limit for tenders (if open or restricted procedure)

Functional requirements Design the technical specifications with the aim of allowing innovation, efficiency improvement, and new ways of thinking – “open specifications” Requires focus on the evaluation criteria vs. focus on the (details in the) technical specification Requires focus on minimum requirements

Functional requirements (continued) Suitable for PPI’s following PCP’s or other Public-Private- Innovation projects (art. 14/16 f) Helps to prevent supplier lock-out / disqualifying competitive advantages Requires focus on the evaluation criteria vs. focus on the technical specification Requires focus on minimum requirements

Variants Allow the procuring authority to evaluate technical specified solutions and other market “other solutions” In principal a combined tender with, and without, open (functional) specifications Requires focus on minimum requirements Requires very much focus on the evaluation criteria – same evaluation criteria as “normal tender”

Total Cost of Ownership (TCO) Life-cycle costing (art. 68) E.g. energy efficient or labour cost-saving solutions An evaluation-technical price comprising different aspects of the costs over the life cycle of a product, solution etc. Focus on data (from the suppliers) and transparent, objectively verifiable and non-discriminatory methods of calculating life-cycle costs Mandatory legislative EU acts for calculating life-cycle costs shall be applied (updated Annex XIII)

Remuneration for participation and shortlisting Increases the incentives for participating and developing/modifying/adapting solutions Today: Competitive dialog (and design contest) Directive 2014/24/EU: + innovation partnership The same mechanisms as in PCP – competitive development but combined with a public procurement contract

Other approaches or tools? IPR sharing (presupposed in innovation partnership) Free test sites? A combination with other policy instruments (subsidies, tax incentives etc.) Always consider the risk of illegal state aid!