1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.

Slides:



Advertisements
Similar presentations
1 DCS Cost DCS Workshop L.Jirden u Central DCS cost u Detector DCS cost.
Advertisements

The Detector Control System – FERO related issues
1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
André Augustinus 5 March 2007 Infrastructure status.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
André Augustinus 16 June 2003 DCS Workshop Safety.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
1 Responsibilities & Cost ALICE DCS Review 14 Nov 05 For the DCS Team L.Jirden.
LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
André Augustinus 16 September 2002 Safety issues.
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
1 Cost of controls TB L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
Peter Chochula DCS Remote Access and Access Control Peter Chochula.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
The DCS lab. Computer infrastructure Peter Chochula.
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
André Augustinus 9 October 2006 Interlocks update.
Peter Chochula for ALICE DCS, DCS review, Geneva April 3, 2006 ALICE DCS – Technical Challenges Peter Chochula For ALICE DCS.
DCS Software Installation computing, network, software guidelines, procedures Peter Rosinsky, Peter Chochula, ACC team ALICE DCS Workshop, CERN, 5-6 March.
André Augustinus 21 June 2004 DCS Workshop Follow-up from last workshop.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
DETECTOR CONTROL SYSTEM FOR THE ALICE EXPERIMENT AT CERN -LHC Anik Gupta ICTDHEP JAMMU 11 th September 2013 Special Thanks to the ALICE CONTROLS COORDINATION.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
CONFIGURATION OF FERO IN ALICE Peter Chochula 7 th DCS Workshop, June 16, 2003.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
TC meeting P2 planning wks 3&4 A.Tauro
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
(Alice COsmic Ray Detector) Status Report
F. Bellini for the DQM core DQM meeting, 04th October 2012
DCS Status and Amanda News
TPC Commissioning: DAQ, ECS aspects
Experience between AMORE/Offline and sub-systems
Alice TPC DCS.
TPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status

2 Detectors ~100 sub-systems SPDPHOFMDT0V0PMDMTIMTKZDCACOSDDSSDTPCTRDTOFHMP EXTERNAL SYSTEMS Trigger DAQ HLT Offline LHC ECS Services Electricity Cooling Gas Magnets Access B-field Space Frame Env. Param. Radiation Experiment infrastr Consoles CR facilities Contr Room CSAM DSS Safety Back-end servers Worker nodes Central DCS H/W Infrastructure DCS commissioning responsibilities De Cataldo Augustinus Chochula Augustinus Chochula Augustinus + Chochula Global:Jirden

3 Central DCS Firewall Terminal Server IP Reach for KVM Domain Controller DB Server (Config.) DB Server (Archive) File Server Network and Security FSM Alarms General DCS Electricity & Racks Gas & Cooling Environment General services LHC & Access Alignment Information Server CERN Consoles Remote AccessBackend Servers DCS Infrastructure & Service Detector DCS DB Server (Archive) DCS network 1 st stage already installed 1 st stage being installed ACR RDP

4 DCS Computer racks in CR3 MTG TPC TRD PHOS MTK TOF TRG MISC SPD SSD SDD FMD PMD HMPID T0 V0 SPARE EMC ACO ZDC CPV DCS B-END SERVERS DCS INFRA STR. & SERV AUX EQUIP

5 Operator Node - ON Worker Node - WN Front-End Dev - FED TPC: 11 PC’s + 4 spare slots EX: Rack Z02 details Operator Node HV LV TMON PULSER LASER D-VELOCITY FED SPARE FED network switch Operator Node HV + LV USB-CAN I/F ethernet CANbus HMPID 3 PC’s + 2 spare slots 2U Intel P4 Dual core CPU, 3GHz

6 Central effort SSDSPDTPCTRDTOFHMPPHOCPVMTKMTGFMDT0V0PMDZDCACOEMCTRGSDDDCS HV COO MON VME LV VME MON COO GAS FEE DVM LAS PUL VHVLV LEDLIQ GMS LAS THRPOS HAL RAD ALI RCK COC LED FEE NMR HVD VME standard semi specific DCS sub-systems 20 Systems ~110 sub-systems

7 Pre-commissioning u All sub-systems to be pre-commissioned before final installation in the pit u At the institute, at CERN, in SXL2 u Stages to be completed for each sub-system: u H/W device defined & low level S/W done u PVSS interface to H/W device establishedcourse u Finite State Machines (FSM) implementedcourse u Configurations donecourse To be r eady 4 weeks before Detector installation u Planning established for each detector

8 Final installation & commissioning u For each detectorweeks u Hand-over s/w project to ACCD-4 u Verification & integration u Installation u Commission individual components u DCS sub-systemsH/W devicesD-2 u DCS sub-systemsdetectorD u Commission whole detector u From Detector sub-system to u Detector DCS D+ u ALICE DCSD++ u ECS u DAQ, TRG, HLT u Offline via conditions DB u Groups of detectors Jan 07 u Whole experiment April 07 D = Detector installation time

9Status SSDSPDTPCTRDTOFHMPPHOCPVMTKMTGFMDT0V0PMDZDCACOEMCTRGSDDDCS standard semi specific HV MON LV MON FEE DVM LAS PUL VHVLV LEDLIQ GMS LAS THRPOS HAL RAD ALI RCK COC LED FEE NMR HVD COO VME COO GAS VME Central effort MON VME COO GAS MON VME GAS H/W device & low level S/W done PVSS interface to H/W device FSM implemented Configured and ready for installation Not started yet

10Status SSDSPDTPCTRDTOFHMPPHOCPVMTKMTGFMDT0V0PMDZDCACOEMCTRGSDDDCS standard semi specific Started but no PVSS yet PVSS to H/W device FSM implemented Configurations implemented manpower ‘critical’manpower ok - late starters HV MON LV MON FEE DVM LAS PUL VHVLV LEDLIQ GMS LAS THRPOS HAL RAD ALI RCK COC LED FEE NMR HVD

11Status SSDSPDTPCTRDTOFHMPPHOCPVMTKMTGFMDT0V0PMDZDCACOEMCTRGSDDDCS MON FEE DVM PUL LV LED THRPOS RAD COC LED FEE NMR HVD standard semi specific Started but no PVSS yet PVSS to H/W device FSM implemented Configurations implemented “critical” sub-systems

12 Status dashboard on DCS web – continuously updated

13 Summary status u Central DCS:on-time u Services DCS:tight but on-time u Systems DCS:12 tight but on-time 5late but catching up 3late; manpower missing