Submission doc.: IEEE 11-14/1386r1 Takuma Takada (NTT DOCOMO) November 2014 Slide 1 NG60 Usage Models Date: 2014-11-04 Authors:

Slides:



Advertisements
Similar presentations
Sounding and P Matrix Proposal
Advertisements

Doc.: IEEE /0328r2 Submission Dense Apartment Complex Throughput Calculations Channel Selection and DSC Date: Authors: Graham Smith, DSP.
Doc.: IEEE /1111r0 Submission Sept 2013 Xiaoming PengSlide 1 Date: Authors: IEEE aj Task Group Sept 2013 Closing Report.
Submission doc.: IEEE /0802r0 July 2013 Y.Inoue (NTT), A.Yamada (NTT docomo)Slide 1 Proposed re-categorization of the usage models Date: xx.
Doc.: IEEE /0995r0 Submission July 2011 Nir Shapira, Celeno Communications Determination of Ng in MU mode (CID 3432) Date: Authors:
Submission doc.: IEEE /1249r1 Backhaul Support in NG 60 September 2014 Monisha Ghosh (InterDigital)Slide 1 Authors: Date:
Virtual Desktop Infrastructure (VDI)
Doc.: IEEE /1510r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 Summary of PAR and CSD Discussion Date: Authors:
Doc.: IEEE /0685r0 Submission May 2015 Intel CorporationSlide 1 Channel Measurements Plan Proposal for IEEE ay Date: Authors:
Submission doc.: IEEE /0636r0 May 2015 SangHyun Chang (Samsung Electronics)Slide 1 A View on IEEE ay Date: Authors:
Channel Sounding for ay
Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Doc.: IEEE /1301r0 Submission September 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG September 2014 Closing Report Date: Authors:
Doc.: IEEE /0006r0 Submission January 2008 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report January 2008 IEEE Date:
Submission doc.: IEEE /0808 July 2015 Songnam Hong, EricssonSlide 1 Frequency-independent Digital Precoder for Hybrid MIMO Precoding Date:
Doc.: IEEE /0672r0 Submission May 2011 ZTE CorporationSlide 1 IEEE ah network operation & management consideration for functional requirement.
Submission doc.: IEEE /1258r2 November 2012 Fang Xie (China Mobile)Slide 1 Operator Deployed WLAN for Cellular offload Date:
Doc.: IEEE s Submission January 2015 Mineo Takai, Space-Time EngineeringSlide 1 Project: IEEE P Working Group for Wireless Personal.
Submission doc.: IEEE 11-13/-543r1 May 2013 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 DSRC Supporting Information Date: Authors:
Submission doc.: IEEE 11-13/0090r2 January 2013 Sam Oyama, ARIBSlide 1 Spectrum Allocation for Wireless LAN and ITS in Japan Date: Authors:
Doc.: IEEE /1160r0 Submission September 2014 Lei Huang, PanasonicSlide 1 Ultra Short Range (USR) Communications Usage Models for NG60 Date:
Doc.: IEEE 11-13/0000r0 Submission July 2013 Dapeng Liu (CMCC)Slide 1 Interference Control Use Case for HEW Date: Authors: NameAffiliationsAddressPhone .
Submission doc.: IEEE /0627r0 May 2015 Hakan Persson, EricssonSlide 1 Beam Selection for Hybrid MIMO Precoding Date: Authors:
Submission doc.: IEEE /0830r0 July 2015 Solomon Trainin et al, IntelSlide 1 Docking usage model Date: 11-Jul-15 Authors:
Doc.: IEEE /0433r0 Submission March 7, 2006 Rich Kennedy (OakTree Wireless) Slide 1 Introduction to CIRCLE Notice: This document has been prepared.
Doc.: IEEE /0803r1 Submission July 2005 TK Tan, Philips Slide 1 WNG SC Closing Report Notice: This document has been prepared to assist IEEE
Doc.: IEEE /0795r0 Submission HEW Usage Scenarios Categorization July 2013 Eldad Perahia (Intel)Slide 1 Date: Authors:
January 2004doc.: IEEE /008r1 Clint Chaplin, Symbol TechnologiesSlide 1Submission Security Standing Committee Clint Chaplin, Symbol Technologies.
Submission doc.: /1320r00 Bo, Sun (ZTE Corp), et al Slide 1 11aj 45GHz Link Budget for use cases discussion Date: Authors: Nov 2012.
Doc.: IEEE /1867r1 Submission November r Security TeamSlide 1 TGr Security Requirements Notice: This document has been prepared to.
Doc.: IEEE /0094r0 Submission November 2009 Steve Shellhammer, QualcommSlide 1 Comments on PAR Notice: This document has been prepared.
Submission doc.: IEEE 11-13/1398r0 Nov 2013 Akira Yamada, NTT DOCOMO, Inc.Slide 1 Requirements for HEW Date: Authors:
Doc.: IEEE /0457r0 Submission March Vertical Applications Technical Advisory Group Smart Grid Task Group Liaison Report Date:
Submission doc.: IEEE /1365r0 Use Cases of LRLP Operation for IoT November 2015 Chittabrata Ghosh, IntelSlide 1 Date: Authors:
Doc.: IEEE / 1162 r1 Submission November 2005 Ariel Sharon, MotorolaSlide 1 TIA Liaison Report November 2005 Notice: This document has been prepared.
Doc.: IEEE /843r0 Submission Cheng Hong, Tan Pek-Yew, Panasonic Slide 1 November 2003 Interworking – WLAN Control Cheng Hong & Tan Pek Yew Panasonic.
Submission doc.: IEEE /0097r0 November 2015 Sho Furuichi, SonySlide 1 Information exchange between independent IEEE systems Date: xx.
Doc.: IEEE r3 Submission November 2004 Michael Mc Laughlin, decaWaveSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /1229r1 Submission November 2009 Alexander Maltsev, IntelSlide 1 Application of 60 GHz Channel Models for Comparison of TGad Proposals.
Session # NRR Committee Opening Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE /0018 Date Submitted:
Doc.: IEEE /0433r0 Submission March 7, 2006 Rich Kennedy (OakTree Wireless) Slide 1 Introduction to CIRCLE Notice: This document has been prepared.
Doc.: IEEE /0161r1 Submission doc.: IEEE /0572r0 Slide 1 Revisions of In-home Entertainment Simulation Scenario Date: Authors:
Doc.: IEEE /0393r1 Submission March 2008 Eldad Perahia (Intel)Slide 1 Orlando Liaison Report Date: Authors:
Doc.: IEEE /0364r3 SubmissionJeongki Kim, LG ElectronicsSlide 1 AID Reassignment Protocol Date: Authors: May 2012.
Doc.: IEEE d Submission May 2014 Ken Hiraga et al, NTT Corporation Slide 1 Project: IEEE P Working Group for Wireless Personal.
Submission doc.: IEEE 11-14/1166r0 Takuma Takada, NTT DOCOMO September 2014 Slide 1 NG60 Use-Cases Date: Authors:
Submission November 2015 Slide 1Li Qiang, Huawei Technologies Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Doc.: IEEE d_January-2015_Closing_Plenary_Slides Submission January 2015 Thomas Kürner (TU Braunschweig). Slide 1 Project: IEEE P
Doc.: IEEE /1296r1 Submission November 2010 Stephen McCann, RIMSlide 1 20 th Anniversary Publicity Date: Authors:
Submission doc.: IEEE /0314r1 March 2016 Katsuo Yunoki, KDDI R&D Labs.Slide 1 Possible Solutions for Mobile Offloading Use Case Date:
Submission doc.: IEEE /0443r0 March 2016 Shahrnaz Azizi, Intel Corporation Date: Addressing the range and power requirements of indoor.
Doc.: IEEE / wng Submission March 2012 Paul A. Lambert (Marvell)Slide Simulations Date: Authors:
<month year> 9/14/2018<month year> doc.: IEEE
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
16 November 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Call For Applications Response Date.
May 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Input to the TRD of TG3d Date Submitted: 12.
doc.: IEEE <doc#>
RR-TAG Liaison Report January 2008 IEEE
Submission 1 Masanori Kondo (APT)
November 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Discussion document on next steps for creating.
January 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
<month year> doc: IEEE c November 2006
IEEE ah Timeline Projection
Sub 1 GHz license-exempt operation Closing Report for September 2010
Simulation Scenario Floor Plans
IEEE TV White Spaces Study Group Closing Report
RR-TAG (802.18) Liaison Report
Closing Plenary Meeting Report for SG 100G Group (1/3)
Relay Enhancement Date: Authors: September 2016
Presentation transcript:

Submission doc.: IEEE 11-14/1386r1 Takuma Takada (NTT DOCOMO) November 2014 Slide 1 NG60 Usage Models Date: Authors:

Submission doc.: IEEE 11-14/1386r1 Takuma Takada (NTT DOCOMO) Introduction This contribution details the use-cases for NG60 discussed in IEEE 802 Wireless Interim Meeting in Athens. Slide 2 November 2014

Submission doc.: IEEE 11-14/1386r1 Takuma Takada (NTT DOCOMO) ApplicationRangeSpeed Security (Confidentiality/ Integrity) Beam Steering (Mandatory/ Optional) D1Traffic offload<30m>30Gbps[2]C/IM D2Cloud storage1 room <10m >30Gbps[2]C/IM D3Mobile backhaul/fronthaul <200m<30Gbps[2]C/IM DOCOMO’s view Complement DOCOMO’s previous contribution[1] with some parameters. 3 November 2014

Submission doc.: IEEE 11-14/1386r1 Takuma Takada (NTT DOCOMO) No Name Requirements Document No SpeedRangeOthers I1Backhaul 2Gbps or higher data rate mLatency -5ms 14/1249r1[3] (Interdigital) P1 USR Mass Data DL/UL 10Gbps (HD movie of 5GB →5.7s) 10cm LOS (such as train station airports) WLAN connectivity 14/1160r0[4] (Panasonic) P2 USR Peer-to-Peer Device Sync 10Gbps (HD movie of 5GB →5.7s) 10cm LOS (such as train station airports) WLAN connectivity 14/1160r0 (Panasonic) P3USR Touch-and-Get 10Gbps (HD movie of 5GB →5.7s) 10cm LOS (such as train station airports) WLAN connectivity 14/1160r0 (Panasonic) H1 Data Center Inter-Rack Connectivity <40Gbps<60’’ (about 152cm) PER<10E- 2 (requirements of 11ad sub-clause ) 14/1185r0[5] (Huawei) Usage Models discussed in Athens Meeting(1) 4 November 2014

Submission doc.: IEEE 11-14/1386r1 Takuma Takada (NTT DOCOMO) 5 November 2014 No Name Requirements Document No SpeedRangeOthers H2AR VR <20Gbps10ftPER<10E- 2 jitter<5ms 14/1185r0 (Huawei) H3 Mobile Offloading and Tri-band offloading <30Gbps<100mPER<10E- 2 handoff disconnection <100ms 14/1185r0 (Huawei) H4 Wireless Backhaul Building to Building <30Gbps<500m 14/1185r0 (Huawei) H5Video Kiosk <30Gbps<10mDownload time 1sec 14/1185r0 (Huawei) H6 Video/Mass-Data Distribution/ Video on Demand System <100m 14/1185r0 (Huawei) H7 Wireless Access with roaming devices <30Gbps<50m 14/1185r0 (Huawei) Usage Models discussed in Athens Meeting(2)

Submission doc.: IEEE 11-14/1386r1 Takuma Takada (NTT DOCOMO) range throughput I1 P1 P2 P3 H1 H2 H6 H7 100m 10cm 10m 1m >30Gbps 10Gbps 20Gbps 6 NoUsage Models I1 Backhaul P1 USR Mass Data DL/UL P2 USR Peer-to-Peer Device Sync P3 USR Touch-and-Get H1 Data Center Inter-Rack Connectivity H2 AR VR H3 Mobile Offloading and Tri- band offloading H4 Wireless Backhaul Building to Building H5 Video Kiosk H6 Video/Mass-Data Distribution/Video on Demand System H7 Wireless Access with roaming devices Usage Models mapping 30Gbps November 2014 H3 H4 H5 D1 D2 D3 These values are not normalized

Submission doc.: IEEE 11-14/1386r1 Takuma Takada (NTT DOCOMO) range throughput 100m 10cm 10m 1m >30Gbps 10Gbps 20Gbps 7 NoUsage Models I1 Backhaul P1 USR Mass Data DL/UL P2 USR Peer-to-Peer Device Sync P3 USR Touch-and-Get H1 Data Center Inter-Rack Connectivity H2 AR VR H3 Mobile Offloading and Tri- band offloading H4 Wireless Backhaul Building to Building H5 Video Kiosk H6 Video/Mass-Data Distribution/Video on Demand System H7 Wireless Access with roaming devices Usage Models mapping 30Gbps November ad NG60 I1 P1 P2 P3 H1 H2 H6 H7 H3 H4 H5 D1 D2 D3 These values are not normalized

Submission doc.: IEEE 11-14/1386r1 Takuma Takada (NTT DOCOMO) Conclusion We complemented and summarized usage models discussed in Athens meeting. We think that the targets of NG60 are extension of coverage and increase of data rate. 8 November 2014

Submission doc.: IEEE 11-14/1386r1 Takuma Takada (NTT DOCOMO) Reference [1] ng60-ng60-use-cases.pptx [2] wng-next-generation ad.pptx [3] ng60-backhaul-support-in-ng-60.pptx [4] ng60-ultra-short-range-usr-communications- usage-models-for-ng60.pptx [5] ng60-ng60-usage-scenarios.pptx 9 November 2014