Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013
OCSD Service Area 479square miles 210million gallons per day 2.5million population 21cities, 3 special districts 580miles of sewers 15pump stations 2treatment plants Service Area Los Angeles San Diego Orange County
Reclamation Plant No. 1 Fountain Valley Treatment Plant No. 2 Huntington Beach
Background EPA Consent Decree Secondary Treatment Full Secondary December 2012 Future Renewal, Replacement and Rehabilitation
Strong Financial Position Revenues from user fees and connection fees Proactive forecasting and planning AAA Bond Rating
More than 70 ProjectsMore than 70 Projects $1.8 Billion Dollars invested in our Infrastructure
Secondary Treatment Expansion Six EPA Consent Decree Milestones Job No.MilestonesDue Date P1-76Construction Plant 1 Trickling Filters P1-102Advertise for Bid of Plant 1 AS System P2-90Advertise for Bid Plant 2 Trickling Filters P2-74Rehab of Plant 2 AS System P2-90Construction Plant 2 Trickling Filters P1-102Construction Plant 1 AS System Full compliance with permit
Trickling Filters at Plant No. 2 Designer: Brown & Caldwell Contractor: J.F. Shea Construction Construction Cost: $182M - Capacity: 60 MGD
New Secondary Treatment at Plant No.1 Designer: Black & Veatch Contractor: Kiewit Infrastructure West Construction Cost: $207M – Capacity 60 MGD
Headworks at Plant No. 2 New Facility Demolition of Existing Headworks Designer: Carollo Engineers Contractor: J.F. Shea Construction Construction Cost: $196M - Capacity 340 MGD
Outfall Land Section & OOBS Piping Rehabilitation Designer: Black & Veatch Contractor: J.F. Shea Construction Construction Cost: $11.8M
Central Generation Automation Designer: Black & Veatch Contractor: Morrow Meadows/Sachs Electric Construction Cost: $14.6M
Sludge Dewatering & Odor Control at Plant No. 1 Exterior finishGround level Designer: HDR Engineering Contractor: W. M. Lyles Construction Cost: $127M
Pump Stations Rocky Point Pump Station Bitter Point Pump Station Designer: Malcolm Pirnie Contractor: Kiewit Inf. West Construction Cost: $9.2M Designer: Lee & Ro Contractor: Kiewit Inf. West Construction Cost: $20.2M
Magnolia Trunk Sewer Rehabilitation Design/Build: Kiewit/Malcolm Pirnie Design/Build Cost: $15.5M
Santa Ana River Interceptor Pipeline Construction Joint project: Orange County, SAWPA & OCSD Designer: TetraTechCM: MWH Contractor: W.A. Rasic/L.A. Engineering Const Cost: $49M
Increasing Level of Service 100% Secondary Standards 70 mgd Reclamation Increased System Reliability Lower Engine Emissions Less Odors Disinfection Treat Urban Runoff Fire & Safety Code Compliance
CIP Drivers Enhanced Planning Methodology Plant or Collection System Capacity Condition Of Assets Business Efficiency & Research Outcome Level of Service or Regulatory Change
CIP Drivers Enhanced Planning Methodology Plant or Collection System Capacity Condition Of Assets Business Efficiency & Research Outcome Level of Service or Regulatory Change
CIP Drivers Transition to Rehabilitation Dome Support Primary Influent Line Outer Wall Mechanism Coating Failure
Current Projects in Design/Construction Biosolids Dewatering Digester Improvements Ocean Outfall Rehabilitation Plant Utility/Safety Rehabilitations Newport Beach Collections
Upcoming Newport Beach Projects
Upcoming Planned Projects Headworks Rehabilitation - $50 Million Outfall Pump Station Rehabilitation - $20 Million Primary Clarifier Rehabilitation - $120 Million Digesters Rehabilitation - $50 Million Digester Gas Facilities Rehabilitation - $40 Million Collections Rehabilitations - $100 Million Odor Control Master Planning - $20 Million Admin. Facilities Master Planning - $40 Million
Upcoming Design Proposals Next 2 Years ( ) No. of Projects Construction Estimate Trunk / Collections6$ 51.1 M Treatment Plant9$ M Total17$ M Also – Upcoming Planning Studies RFP in August
Upcoming Construction Bidding Next 2 Years ( ) No. of Projects Construction Estimate Trunk / Collections7$ 57.0 M Treatment Plant12$ M Total19$ M
Questions?