Implemented by DOH- RO3 For the Province of Pampanga.

Slides:



Advertisements
Similar presentations
UNESCO INSTITUTE for STATISTICS UIS Education Survey: Questionnaire on Statistics of Educational Finance and Expenditure – B Juan Cruz Perusia February.
Advertisements

MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013.
PROJECT Operation and Maintenance of the Convention Center of Lima (Centro de Convenciones de Lima) September 2014.
PROGRESS REPORT Preparations for the 2010 PALARONG PAMBANSA by GOV. VICTOR A. YAP Host Governor.
Washtenaw County Strategic Space Plan Recommendations November 1, 2006.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
For the Boys and Girls of Appling County.  E = Education  S = Special Purpose  L = Local  O = Option  S = Sales  T = Tax  (E-SPLOST)
DOH GPB Program Implementation Guidelines
District 3790 Rotary Foundation Seminar
Orientation and open-forum on HEROES HILLS gate closures and traffic regulationS September 25, 2009, 2:00 PM Heroes Hills Chapel, Barangay Sta. Cruz GUEST.
16 April 2017 Enhancing Inter-LGU Cooperation in Improving Maternal and Child Health Services in the Cordilleras TWO major topics / characteristics of.
HEALTH SECTOR DEVELOPMENT IN TIMOR-LESTE Dr Joao Martins, Dean, Faculty Public Health, Universidade da Paz, Dili.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
PARTNERSHIP CITY OF LA MIRADA – LOS ANGELES COUNTY COMMUNITY DEVELOPMENT COMMISSION Working closely to identify programs that will eliminate blight and.
KDF/JADMC Accomplishment Report ( as of September 10, 2013) I. PROSTHESIS III. CLEFT LIP/CLEFT PALATE SURGERY IV. CATARACT EXTRACTION 2008 Beneficiaries.
MONTGOMERY HIGH SCHOOL MODERNIZATION & NEW CONSTRUCTION
WEST VALLEY COLLEGE MEASURE C MASTER PLAN SCHEDULE JANUARY 6, 2013.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Fire Station #39 Rehabilitation Update City Council Open Session February 6, 2012.
Notification No. 093/NRA dated 19 November 2012 on UXO clearance for socio-economic development projects in Lao PDR. By: Bounpheng Sisawath Deputy Director.
The Spanish-American War & The Philippine War
1 Central Luzon ProvinceInfrastructure Development Needs Other Development Initiatives Road InfrastructureTransport and Comm’s Other Tourist Infrastructure.
Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS.
1 Northern Luzon Tourism Cluster NL-7 Central Luzon Cluster Tourism Development Area Infrastructure Development Needs Other Development Initiatives Road.
HEALTH SITUATION UPDATES: “Typhoon Milenya” Department of Health May 4, 2009 As of 9:00 am.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Incentives & Infrastructure  Estimated incentives and Infrastructure cost: $87,000,000  We will have a Development Agreement with Microsoft that will.
Winchester Medical Center Campus Expansion June 21, 2011.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Project IDAgencyTitleRelevant Project ComponentCompletion Date LAE0332City of Long BeachLong Beach Park & Ride LotPRL with 400 parking spacesJune, 2014.
December 18,  Located on the eastern seaboard of Samar Island.
Work And Financial Plan For FY 2015 DOT REGION 3.
PORTFOLIO COMMITTEE on HEALTH
Seattle District MILITARY CONSTRUCTION PROGRAM
CURRENT SITUATION & CONCERNS on URBAN and REGIONAL DEVELOPMENT in the PHILIPPINES by Dr. REY B. AQUINO 3 rd District of Pampanga, Philippines.
Preparations for the 2010 PALARONG PAMBANSA
GRASSROOTS PARTICIPATORY BUDGETING PROCESS: a status report.
Financial Management Review (FMR) Baltimore District FY16 Budgeted Expenditures LTC Mike Ruppert Deputy Commander 20 NOVEMBER 2015.
Trauma Center Recommendation San Joaquin General Hospital French Camp, California May 31, 2009 San Joaquin General Hospital French Camp, California December.
Location Allowance Components Salary Administration- HDBP LifeBank Foundation, Inc August 6, 2013.
SPLOST VII. I.Purpose of Meeting II.What is a SPLOST III.What can SPLOST funds be used for? IV. Benefits of SPLOST V.Hall County SPLOST History VI.SPLOST.
NoProjectCapitalDescriptionPlace 1 Sludge treatment station in Thu Duc water supply plant. VND 154bn750,000m³/dayThu Duc Dist. 2 Water loss reduction.
Purpose The Operations Directorate is responsible for all day-to-day maintenance operations activities Functions -Management of the performance of regional.
GIPORLOS BEFORE YOLANDA Map of Giporlos Land Use Map of Giporlos.
Lincoln Public Schools Lincoln, Nebraska Lincoln Public Schools Work Session 10-Year Facility and Infrastructure Plan Update October 22, 2013.
Data Center Stabilization
FIRE SAFETY IN HOSPITALS
“NYC Build” Presentation
BOND ELECTION PROPOSAL November 12, 2013
Signal Improvement Project COMMUNITY DEVELOPMENT DEPARTMENT
The Perfect Marriage! Ephesians 5:21-33.
Veterans Affairs Program Brief
MIRACOSTA COMMUNITY COLLEGE DISTRICT
ACCOMPLISHMENT REPORT
CORE PROJECTs July 27, 2018.
ОПЕРАТИВНА ПРОГРАМА “ИНОВАЦИИ И КОНКУРЕНТОСПОСОБНОСТ“ „Подобряване на производствения капацитет в МСП“
Index Notation Sunday, 24 February 2019.
Capital Outlay Workshop
Western Cape: Department of Health Public Hearing on Conditional Grants and Capital Expenditure 3rd Quarter 2007/8 7 February 2008.
Post-Reform Role of Traditional Safety-Net Providers
Sandy Grove Middle School
Solving Equations 3x+7 –7 13 –7 =.
New York State Smart Schools Bond Act
Western Cape: Department of Health Public Hearing on Conditional Grants and Capital Expenditure 3rd Quarter 2007/8 7 February 2008.
Urban vocabulary.
FY2019 Proposed Budget Open House
Street Lighting and Electric System Undergrounding
Presentation transcript:

Implemented by DOH- RO3 For the Province of Pampanga

Name of ProjectABCStatusRemarks 1. Porac District Hospital10 M90% Accomp.On-going construction 2. Macabebe District Hospital (Phase 1) 10 M100% Accomp. 3. Macabebe District Hospital (Phase 2) 6,121,60065% Accomp.On-going construction

Name of Facility Porac District Hospital Classification Level 1 Location Porac, Pampanga Project Project Year HFEP 2012 Project Description Const. Dietary, Laundry, Mentainance Total Project Cost P13,000, Infrastructure P10,000, Equipment P 3,000, Status 90% Completed Remarks IHCPs w/ Center of Safety Accreditation

Name of Facility Macabebe Dist. Hosp. Classification Level 1 Location Macabebe, Pampanga Project Project Year HFEP 2012 Project Description Expansion/Repair/Renovatio n Total Project Cost P12,000, Infrastructure P10,000,000,00 Equipment P2,000, Status 100% Accomp. Remarks For turn-over

Name of ProjectABCStatusRemarks 1.Porac District Hospital (Phase 2) 1 M100% Accomp.

Name of Facility Macabebe Dist. Hosp. Classification Level 1 Location Macabebe, Pampanga Project Project Year HFEP 2012 Project Description Expansion/Repair/Renovatio n Total Project Cost P12,000, Infrastructure P10,000,000,00 Equipment P2,000, Status 100% Accomp. Remarks For turn-over

Implemented by DPWH- RO3 For the Province of Pampanga

Name of ProjectProject CostStatusRemarks 1. RHU VI EPZA Birthing Facility, Pulung Cacutud, Angeles City 2.5 M100% Accomp. Completed & Operational 2. RHU III Lourdes Sur East Birthing Facility, Angeles City 2.5 M100% Accomp. Non-functional 3. Bebe Anac BHS, Masantol, Pampanga 1.5 M Not yet started 4. Sagrada BHS, Masantol, Pampanga 3 M40% Accomp. On-going construction 5. San Roque BHS, Macabebe, Pampanga 1.5 M85% Accomp. On-going construction 6. Nabuklod BHS Birthing Facility, Floridablanca, Pampanga 2.5 M90% Accomp. On-going construction 7. Pio Ressettlement Birthing Facility (RHU 3), Porac, Pamp. 2.5 M100% Accomp. For Turn-over 8. Camias BHS, Birthing Facility, Porac, Pampanga 2.5 M50% Accomp. On-going construction 9. Sta. Rita RHU, Sta Rita, Pampanga 2.5 M70% Accomp. On-going construction 10. RHU 2 Bacolor Birthing Station, San Isidro, Bacolor, Pamp. 2.5 M10% Accomp. On-going construction 11. Concepcion BHS, San Simon, Pampanga 2 M70% Accomp. On-going construction 12. Dulong Ilog BHS, Candaba, Pampanga 3 M100% Accomp. For Turn-over 13. San Juan BHS, San Luis, Pampanga 2 M85% Accomp. On-going construction 14. Sta Cruz Pambilog BHS, San Luis, Pampanga 2 M60% Accomp. On-going construction 15. San Roque BHS, San Luis, Pampanga 2 M70% Accomp. On-going construction

RHU VI EPZA BIRTHING FACILITY PULUNG CACUTUD, ANGELES CITY COST: 2,500,000 (INFRA) 550,000 (EQUIPMENT) Remarks: 100% completed & operational

RHU lll LOURDES SUR EAST BIRTHING FACILITY ANGELES CITY COST: 2,500,000 (INFRA) 550,000 (EQUIPMENT) Remarks: BF non-functional due to lack electrical connections from local electric cooperative

BEBE ANAC BHS MASANTOL, PAMPANGA HFEP 2013 COST: P1,500,000 Remarks: Not yet started due to presence of PELCO post

SAGRADA BHS MASANTOL, PAMPANGA HFEP 2013 COST: P3,000,000 Remarks: Coastal barangay; 40% completed

SAN ROQUE BHS MACABEBE, PAMPANGA HFEP 2013 COST: P1,500,000 Remarks: 85% completed

NABUCLOD BHS BIRTHING FACILITY FLORIDABLANCA, PAMPANGA COST: 2,500,000 (INFRA) 550,000 (EQUIP) Remarks: 90% completed (main door, electrical installation)

PIO RESETTLEMENT BIRTHING FACILITY (RHU 3) PORAC, PAMPANGA COST: 2,500,000 Remarks: 100% completed; for turn-over

CAMIAS BHS BIRTHING FACILITY PORAC, PAMPANGA COST: 2,500,000 (INFRA) 1,050,000 (EQUIP) Remarks: 50% completed

STA. RITA RHU STA. RITA, PAMPANGA COST: 2,500,000 (INFRA) 550,000 (EQUIP) Remarks: 70% completed

RHU 2 BACOLOR BIRTHING STATION SAN ISIDRO, BACOLOR PAMPANGA COST: 2,500,000(INFRA) 550,000 (EQUIP) Remarks: 10% completed

CONCEPCION BHS SAN SIMON, PAMPANGA COST: P2,000,000 Remarks: 70% completed

DULONG ILOG BHS CANDABA, PAMPANGA COST: P3,000,000 Remarks: 100% completed; for turn-over

SAN JUAN BHS SAN LUIS, PAMPANGA COST: P2,000,000 Remarks: 85% completed

STA. CRUZ PAMBILOG BHS SAN LUIS, PAMPANGA COST: P2,000,000 Remarks: 60% completed

SAN ROQUE BHS SAN LUIS, PAMPANGA COST: P2,000,000 Remarks: 70% completed

SUMMARY TOTAL COST: 34, 500, 000 INFRA 3, 800, 000 EQUIPMENT 38, 300, operational % completed; for turn-over 1- not yet started 10- on-going construction TOTAL OF 15 HEALTH FACILITIES

For the Province of Pampanga Being Implemented by DOH-RO3

Name of ProjectsABCDescriptionRemarks 1. Sta. Lucia BHS, City of San Fernando 1 MRepair/Renovation & Expansion For bidding 2. Romana Pangan Dist Hosp, Floridablanca 10 MRepair/RenovationFor bidding 3. Floating Bancal Pugad BHS, Lubao 3 MNew ConstructionFor bidding 4. Consuelo RHU, Macabebe2 MNew ConstructionFor bidding 5. Sapang Kawayan RHU, Masantol2 MFor verificationFor bidding 6. Jose B. Lingad Mem Gen Hosp, City of San Fernando, Pampanga 3 MRepair & Upgrading of ICU/CCU Bldg For bidding

Name of ProjectABCDescriptionRemarks 1. Angeles City RHU II1.5 MRepair/RenovationFor bidding 2. Bacolor RHU I1.5 MNew ConstructionBidded 3. Lubao RHU III, Brgy. San Isidro1.5 MRepair of RHUFor bidding 4. Mabalacat RHU I, Pob.1.5 MCompletion of RHUFor bidding 5. Mabalacat RHU II, Dau1.5 MRepair/RenovationFor bidding 6. Macabebe RHU II (Brgy. San Rafael)1 MCompletion of RHUFor bidding 7. Magalang RHU I1.5 MExtension of RHUFor bidding 8. Magalang RHU II, San Ildefonso1.5 MRepair/UpgradingFor bidding 9. Mexico RHU IV, Pandacaqui1.5 MRepair/RenovationFor bidding 10. San Fernando City RHU II, Sindalan1.5 MExpansion of RHUFor bidding 11. San Luis RHU I, Sta. Cruz Pob.595,000Expansion of TB DotsFor bidding 12. Sasmuan RHU, Sta. Lucia Pob.716,000Completion of ProjectFor bidding 13. Sta. Ana RHU, San Joaquin (Pob)1.5 MUpgrading/ExpansionFor bidding 14. Bambang BHS, Candaba1 MRenovationFor bidding 15. Gulap BHS, Candaba1 MRenovationFor bidding 16. San Isidro MCH (RHU)1 MRenovationFor bidding 17. Macabebe RHU I1.725 MRenovationFor bidding 18. Bulaon BHS, City of San Fernando2 MRenovationBidded 19. Salapungan BHS, City of San Fernando2 MRenovationBidded 20. San Luis RHU1 MRenovationFor bidding

Name of ProjectABCDescriptionRemarks 1. San Juan RHU I, Apalit1.5 MNew ConstructionFor Bidding 2. Tabuyuc RHU II, Apalit1.5 MNew ConstructionFor Bidding 3. Floridablanca RHU II1.266 MNew ConstructionFor Bidding 4. Guagua RHU I1.5 MNew ConstructionFor Bidding 5. Mexico RHU II, San Jose Malino1.5 MConstruction of 2 Storey RHU For Bidding 6. Mexico RHU III, Sto. Domingo1.5 MNew ConstructionFor Bidding