CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.

Slides:



Advertisements
Similar presentations
22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.
Advertisements

Status of PMD DCS. PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48.
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
Slide 117 th DCS Workshop – October, 10Francesca Poggio ZDC DCS Status Report Francesca Poggio Università degli Studi di Torino INFN, sezione di Torino.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
TPC Very High Voltage Control Status report Marco Boccioli 20/04/2006.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
1 Responsibilities & Cost ALICE DCS Review 14 Nov 05 For the DCS Team L.Jirden.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
MDT PS DCS for ATLAS Eleni Mountricha
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
DCS workshop CERN, Mar 5, 2007 Kai Schweda 1 TRD Status Kai Schweda, University of Heidelberg B. Doenigus, J. de Cuveland, T. Dietel, D. Emschermann, M.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Alice TPC DCS.
TPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
R.TIEULENT - ALICE Offline Week
Presentation transcript:

CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.

2006 DCS planning, CPV DCS planning meeting : Detector CPV: D = = > D = 1-st Shut Down in 2008 (D - Date of the detector installation in the pit) CPV FSM Pre-commissioning in Lab/CERN/SXL2 Who responsible Ready when? – –Integrate all sub-systems in the DETECTOR FSM A.M., M.B – –Implement software interlocks (if required) A.M., M.B – –Implement operations panels A.M., M.B < D-4 weeks Commissioning at P2 – –Hand-over PVSS project to ACC for verific.& integrationS.S., M.B., A.M.D-4 weeks – –Install PVSS project in server at P2ACCD-2 – –Commission with sub-systems at P2 A.M., M.B. D-2 – –Commission the DETECTOR DCS with PHOS A.M., M.B. D – –Commission together with other detectors A.M., M.B.,VO +All D+?

2006 DCS planning, CPV (2) LV PS Pre-commissioning in Lab/CERN/SXL2 Who responsible Ready when? –Implement a “Lab setup”: PVSS-OPC-device M.B., A.M –Implement FSMM.B., A.M –Implement the PVSS configuration, archival and alarmsM.B., A.M –Implement software interlocks (if required)M.B., A.M –Implement operations panelsM.B., A.M < D-4 weeks Commissioning at P2 Hand-over PVSS project to ACC for verific.& integrat.S.S., M.B, A.M.D-4 weeks –Install PVSS project in server at P2ACCD-2 –Install, cable & commission the LV PS devices at P2V.V. D-2 –Commission the LV PS devices with detectorM.B., A.M. D D = 1-st Shut Down in 2008 (D - Date of the detector installation in the pit)

2006 DCS planning, CPV (3) HV PS Pre-commissioning in Lab/CERN/SXL2 Who responsible Ready when? –Implement a “Lab setup”: PVSS-OPC-device M.B., V.O –Implement FSMM.B., V.O –Implement the PVSS configuration, archival and alarmsM.B., V.O –Implement software interlocks (if required)M.B., V.O –Implement operations panelsM.B., V.O < D-4 weeks Commissioning at P2 Hand-over PVSS project to ACC for verific.& integrat.S.S., M.B, V.O.D-4 weeks –Install PVSS project in server at P2ACCD-2 –Install, cable & commission the HVPS devices at P2V.V. D-2 –Commission the HV PS devices with detectorM.B., V.O. D D = 1-st Shut Down in 2008 (D - Date of the detector installation in the pit)

2006 DCS planning, CPV (4) Temperature Monitor Pre-commissioning in Lab/CERN/SXL2 Who responsible Ready when? –Implement a “Lab setup”: CRW-DAQ A.M., M.B –Implement FSM A.M., M.B –Implement the PVSS configuration, archival and alarms A.M., M.B –Implement software interlocks (if required) A.M., M.B –Implement operations panels A.M., M.B < D-4 weeks Commissioning at P2 Hand-over PVSS project to ACC for verific.& integrationS.S., A.M., M.B.D-4 weeks –Install PVSS project in server at P2ACCD-2 –Install, cable & commission the COOLING plant at P2V.V. D-2 –Commission the COOLING plant with detectorV.V., A.M., M.B. D D = 1-st Shut Down in 2008 (D - Date of the detector installation in the pit) GAS (Ar+CO2) Commissioning at P2 Who responsible Ready When? -- Hand-over PVSS project to ACC for verific. & integrationGWG Install PVSS project in server at P2ACC Install, cable & commission the GAS system at P2GWG Commission the GAS system with detectorS.S., V.V., M.B. D < D-4 weeks

Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 3020 Detector (Ni100 sensors) 32 High VoltageLow VoltageTemp. Monitor User interface PVSS II HVLV PHOS-CPV Control room (ACR) [UI node] ELMB 27/10/05 CR4-Y10 SY2527 (2*A18833P) Ethernet E CR3 CAEN OPCserver PVSS II OPC client 1 UX-C16 Wiener E CR3 Wiener OPCserver PVSS II OPC client 3 CR3 PCI-CAN ELMB OPCserver PVSS II OPC client C 1 ACC 1 CR3 SG2 CR5 SG2 Gas system PLC Gas E Detector PVSS II DIP [GWG] Gas Gas PVSS 1 222

FSM of the CPV Detector

CPV Top Level Diagram

Wiener Crate State Diagram Wiener Channel State Diagram Wiener Control State Diagram Wiener State Diagrams

Start Menu PVSS II 3.1 Console

Launching of the CPV DCS, screenshots

CPV top level, screenshots

Manage Wiener LV PS

LV channel setting, screenshots

Wiener power supplies in the Lab

Devise Editor and Navigator, screenshots

NOT_READY -> GO_READY Remote Monitoring:

What is Ready & in Progress CPV FSM – in a good progress (the first prototype exists) LV Power supplies of the Wiener type – almost ready HV Power supplies of the CAEN type – TBD (the same as in HMPID) Temperature monitoring (ELMB) – TBD (the same as in PHOS) Gas system – almost ready (GWG) Connection of top the CPV Level with the top PHOS Level – TBD