MP3 report – week 17 19/4/2010 – 25/04/2010 12 interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.

Slides:



Advertisements
Similar presentations
6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
Advertisements

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Review of the experience of LHC powering: short-circuit tests and sector 7-8 and start of powering sector.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC 14 & 15 April :22: Ramp to 6.5 TeV lost due to MUFO, resulting in quench 10:30: Access during cryo recovery 16:00: Pre-cycle 17:05: RB.A78 short.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
Goal of the week: Stable beams with bunch trains … not quite achieved ! 1 OP summary of week 37 M. Lamont & J. Wenninger.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
How to improve operational efficiency ? [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] Beam Commissioning Workshop, Evian Jan 2010.
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
NQPS trips due to EMC transients 30/06/20111ZCh, TE-MPE-TM Z.Charifoulline - # nQPS.BS signals in A12 & A34 # statistics over.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
MP3 report : W27 to W33 (22 slides, 10’ ?) J.Ph Tock for the MP3 team: TE-MPE : N. Catalan, R. Denz, M. Koratzinos, A. Verweij, M. Zerlauth TE-MSC : B.
02/09/2010 Access conditions for test of the RB.A23 at 17:30. Splice mapping. Complete machine closed by ~18:00.Problems in getting TI2 ready for injection.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
Recent cross-wiring issue and implication for circuits protection Bozhidar Panev TE-MPE-CP
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
MP3 List of main Issues during March 2010 MP3 - Team.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Expense Report Total Miles MONDAY 5 5 TUESDAY WEDNESDAY 6 6 THURSDAY FRIDAY SATURDAY 0 SUNDAY0 TOTAL 23.
From yesterday LHC status Wednesday 26 th Welcome Verena back on shift 07:08 Access in PM85 for piquet EPC (O.Fournier).  Fuse on RD2.R8 circuit.
MP3 report – week /05/2010 – 09/05/ actions MP3/QPS team in CCC LMC: 12 th of May 2010.
LHC circuit modeling Meeting 2 March PSpice Electrical modeling of the various LHC circuits, as a tool to: Describe the ac behavior of magnets Better.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
LHC Fri 6 & Sat 7 Nov :00 End instabilities MD, dump to refresh air at dump TDE cavern 08:00 Access for vacuum team at the TDE starting 10:30 Access.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
R.Giachino / M.Albert Be/op 30 th March 2015 LHC Machine check out 1v1.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Injection issues overnight 10:50 Access  QPS & EPC  Vacuum leak SPS – magnet to be replaced Monday – cycling for FT and LHC only over the weekend 12:15.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
Wednesday 8.9 External crossing angles:
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Summary Friday h38: Ramp down and pre-cycle.
Powering from short circuit tests up to nominal
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
(damaged board on RQD/F)
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Monday Morning – recovery from cryo.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
(1 test missing on RQD/F)
Yesterday’s morning’s controls issues
Aims for the week Recover from technical stop and precycle at 10A/s
07/08/2010 Fill #1264 dump at 02:14:38.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Presentation transcript:

MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010

RQD/F.A81 on Tuesday and Friday Trip induced by nQPS at 6kA on Tuesday, at 1.4kA on Friday Noisy board in B22L1 : New Threshold of 0.6mV Monday Morning Meeting : 26th of April 2010

RQF.A78 on Tuesday Trip induced by nQPS at 781A Noisy board in B11R7 : new Threshold of 0.6mV Monday Morning Meeting : 26th of April 2010

RCBXH1.L1 Tripped during ramp down of a precycle at 120A. O Voltage crossing : Perturbation created by PC when the voltage polarity is changing can be not compensated by QPS Monday Morning Meeting : 26th of April 2010

RQTD/F.A34B2 – RQS.A78B2 RQTD/F.A34B2 tripped at 3.5TeV due to the trim function Hope to fix it with new protection function : Time discrimination will be increased from 20ms to 200ms ( planned in the next technical stop) RQS.A78B2 tripped on Wednesday : bad trim function incorporated Monday Morning Meeting : 26th of April 2010

Quench heater power supply in RB.A67 1 QH power supply discharged (MB.B17L7) from Tuesday Can be tolerated 3.5 TeV Fixed the 23/04 during intervention for UPS in RE73. Monday Morning Meeting : 19th of April 2010

RQS.L7B2 on Friday and Sunday QPS not OK on 600A global detector. 1 board on current lead blocked since 3days. Not a major issue because the redundant board was still working. QPS_OK of 600A systems are not checked during the software interlock Similar problem showed up on Sunday. Temporally fixed Monday Morning Meeting : 26th of April 2010

Quench loop controller in point 8 (even side) with wrong values (correct values :I_loop≈50mA,V_loop≈45V) and some bad status. Not sure that communication with PIC or PC was correct -> intervention required Even sideOdd side RB.A81on Sunday Monday Morning Meeting : 26th of April 2010

Other MP3 issues since 12 th of April 2010 RCBH19.L3B2 & RCBV19.L3B1 : Seems to have a PC issue EPC informed Monday Morning Meeting : 19th of April 2010

MP3 issues since April 19 th Some trips of circuits that were repowered after analysis: – RCBCH5.R5B1(19/04) – RCBXH1.L1(20/4); RCBXH2.L8 (23/4) – RQTD/F.A34B2; RQS.A78B2 – RQD/F.A81 (20/4 and 23/4); RQD/F.A78 (20/4) Threshold was increased to 600uV on B11R7 and B22L1, until next technical stop – RB.A81 Lost of Communication on RCBV25.R7B2 Monday Morning Meeting : 19th of April 2010