LBT Q3 2008 Eng/SW Review SFWG – Software Group General Norm Cushing.

Slides:



Advertisements
Similar presentations
Ch.1 Introduction to Software Engineering The Evolution 1.1 The Evolving Role of Software 1/15 In the early days: User Computer Software = Place a sequence.
Advertisements

06 April 2009 LBT Q Eng/SW Review LBT Q Eng/SW/Mtn Review OSS – Optical Support Structure Paul Grenz.
Lotus Notes - the University of Nebraska Experience Greg Gray University of Nebraska Central Administration Computing Services Network.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
Client/Server Computing Ajay Kumar Shrivastava. Network Operating System (NOS) It manages the services of the server It exists at the session and presentation.
Tietojärjestelmien peruskurssi Software engineering Malin Brännback.
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
Introduction <Header Title> Last saved: YYYY-MM-DD
Development Processes and Product Planning
Institute of Technology, Sligo Dept of Computing Semester 3, version Semester 3 Chapter 3 VLANs.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
Configuration Management System
Annie Griffith Infrastructure Programme Manager July 2007 UK Link Technology Refresh.
Computers & Employment By Andrew Attard and Stephen Calleja.
UNIX SVR4 COSC513 Zhaohui Chen Jiefei Huang. UNIX SVR4 UNIX system V release 4 is a major new release of the UNIX operating system, developed by AT&T.
ePATHUSA’s Application Development & Maintenance Services
Engineering Management From The Top Power Behind the Storage.
Chapter 7 Problem & Cases
PCGRID ‘08 Workshop, Miami, FL April 18, 2008 Preston Smith Implementing an Industrial-Strength Academic Cyberinfrastructure at Purdue University.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Site Networking Anna Jordan April 28, 2009.
University of Wisconsin System HRS Project Update to ITC November 19, 2010.
InfiniSwitch Company Confidential. 2 InfiniSwitch Agenda InfiniBand Overview Company Overview Product Strategy Q&A.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
A DΙgital Library Infrastructure on Grid EΝabled Technology ETICS Usage in DILIGENT Pedro Andrade
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
Middleware for FIs Apeego House 4B, Tardeo Rd. Mumbai Tel: Fax:
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
A Networked Machine Management System 16, 1999.
Chapter 1 The Product. 2 Product  What is it?  Who does it?  Why is it important?  How to ensure it be done right?
Software Status Sonja Vrcic Socorro,
LBT Q Software Review GCS – Guiding and Active Optics.
Lecture 14 Maintaining the System and Managing Software Change SFDV Principles of Information Systems.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
Natick Public Schools Technology Update October 6, 2008 Dennis Roche, CISA Director of Technology.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
Guiding Control Subsystem (GCS) Overview
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
| IIT Annual Update Overview Divisional Update IIT Staff are focused on customers first IIT has improved the learner experience.
Installation and Maintenance of Health IT Systems Unit 8b Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
LBT Q Eng/SW Review MCSC – Mount Control System.
Computer Science 340 Software Design & Testing Software Architecture.
DIT Campus Network Final Presentation Team Members Honoratha Shayo Vincent Jacob Ivan Masue Fredrik Andersson Ombeni Mnzava Sylvester Kimbi.
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
MT. CARMEL BAPTIST CHURCH NETWORK OVERHAUL L. Kennerly Newlin Networking and Database.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Ed Tech Audit Case Study Pete Reilly. Process Meetings with the Superintendent Extended meetings with the technology coordinator Meeting with each administrator.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
Software Development Cycle and Roles in a Project Team
Computing and Communications Services Office 1 CCSO Instructional Sites Randy Cetin Computing and Communications Services Office Assistant Director, Systems.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Engineering Review ENGG – Engineering General.
IT Architecture Technical blueprint for evolving a corporate infrastructure resource that can be shared by many users and services processing systems hardware.
FY09 Tactical Plan Status Report for Site Networking
Your Next LIMS: SaaS or On-Premise? Presented by:
FY10 Tactical Plans for Enterprise Information Systems
FY10 Tactical Plans for Enterprise Information Systems
Chapter 8 Software Evolution.
Presentation transcript:

LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing

20-Oct-2008LBT Q Eng/SW Review Progress Software Development Software Development Front Bent Gregorian Commissioning. Is working and being used for Lucifer commissioning. Some work remaining. Front Bent Gregorian Commissioning. Is working and being used for Lucifer commissioning. Some work remaining. Telescope Structure Temperatures. Being captured with the new Telemetry system. Telescope Structure Temperatures. Being captured with the new Telemetry system. Populate Telemetry from TCS subsystem. Late. In development for deployment in Oct – Dec Populate Telemetry from TCS subsystem. Late. In development for deployment in Oct – Dec Binocular Prime Focus. Delayed because of Lucifer commissioning and new Telemetry implementation efforts. Binocular Prime Focus. Delayed because of Lucifer commissioning and new Telemetry implementation efforts. Rotator and cable chain control software. Completed and pretty thoroughly tested. Rotator and cable chain control software. Completed and pretty thoroughly tested. Acquiring HBS PLC values and HBS State Machine Rework. Delayed. Acquiring HBS PLC values and HBS State Machine Rework. Delayed. Direct Gregorian Rotator control. Development has started. Much work remaining. Direct Gregorian Rotator control. Development has started. Much work remaining. Decide on LGS/TCS/AOS architecture. Still awaiting architecture decision from MPIA, (its been quiet). Decide on LGS/TCS/AOS architecture. Still awaiting architecture decision from MPIA, (its been quiet). ICE common software initiative. Cancelled for foreseeable future. Lack of resources. ICE common software initiative. Cancelled for foreseeable future. Lack of resources.

Progress cont. Tucson computer room Tucson computer room Electrical upgrade. Delayed until 2009 budget is released. Electrical upgrade. Delayed until 2009 budget is released. Rack refresh. In-progress. Rack refresh. In-progress. Network Network Cisco fiber and copper port increase (48 each), Delayed, now scheduled for Nov 3 rd, Cisco fiber and copper port increase (48 each), Delayed, now scheduled for Nov 3 rd, Characterization. Consultant Hired. Progress being made, some problems already identified. Characterization. Consultant Hired. Progress being made, some problems already identified. Architecture Re-design and Implementation. Delayed following further characterization and consulting. Architecture Re-design and Implementation. Delayed following further characterization and consulting. Install Hardware Infrastructure enhancements/upgrades Install Hardware Infrastructure enhancements/upgrades TCS Servers (Apr – May). Delayed. Planned for deployment by Oct 17 th, TCS Servers (Apr – May). Delayed. Planned for deployment by Oct 17 th, Memory upgrades to Mtn. TO workstations. Delayed until 2009 budget is released. Memory upgrades to Mtn. TO workstations. Delayed until 2009 budget is released. TEL Servers and databases. Mtn. Servers are Operational. Development Test Machine will be deployed by Oct 28, TEL Servers and databases. Mtn. Servers are Operational. Development Test Machine will be deployed by Oct 28, Windows Domain servers. Operational. Windows Domain servers. Operational. 20-Oct-2008 LBT Q Eng/SW Review

20-Oct-2008 Open Issues Technical Technical Network delays are being investigated but are not yet understood. Network delays are being investigated but are not yet understood. Network new architecture design and implementation needs resources and carry through. Network new architecture design and implementation needs resources and carry through. Private fibers between computer room and New Instrument Lab need to be championed and funded (as an example, expected by Lucifer for mid November 2008, expected by Linc-Nirvana). Private fibers between computer room and New Instrument Lab need to be championed and funded (as an example, expected by Lucifer for mid November 2008, expected by Linc-Nirvana). TCS should migrate to CentOS 5.x before the end of the 2009 monsoon season. TCS should migrate to CentOS 5.x before the end of the 2009 monsoon season. TCS should migrate to Qt 4 before the end of the 2009 monsoon season. TCS should migrate to Qt 4 before the end of the 2009 monsoon season. Need to migrate LBC to newer OS and C++ IIF interface to take advantage of ICE IIF interface. Need to migrate LBC to newer OS and C++ IIF interface to take advantage of ICE IIF interface. Web server consolidation, development, upgrade, and maintenance of existing tools needs to be championed and funded. Web server consolidation, development, upgrade, and maintenance of existing tools needs to be championed and funded. Schedule Schedule Instrument and telescope commissioning night time support is severely taxing the group. Members are tired and irritable. Morale and productivity has waned. Schedule or extended effort must give way. Instrument and telescope commissioning night time support is severely taxing the group. Members are tired and irritable. Morale and productivity has waned. Schedule or extended effort must give way. Binocular Prime Focus deployment delayed. Binocular Prime Focus deployment delayed. GCS development is behind schedule. GCS GUI is behind schedule. GCS development is behind schedule. GCS GUI is behind schedule. Dynamic Balance is behind schedule. Dynamic Balance is behind schedule. Telemetry usage by TCS subsystems is behind schedule. Telemetry usage by TCS subsystems is behind schedule. ECS completion and enhancements are behind schedule. ECS completion and enhancements are behind schedule.

Open Issues cont. Budget Budget 2009 budget was smaller than requested budget was smaller than requested. Some upgrades to mtn. computers, networking, delayed until 2009 budget. Some upgrades to mtn. computers, networking, delayed until 2009 budget. Will not be possible to assume responsibility for DIMM, Lucifer, and LBC software. Will not be possible to assume responsibility for DIMM, Lucifer, and LBC software. No money for private fibers between computer room and new instrument lab. No money for private fibers between computer room and new instrument lab. Resource Resource Short a Software Developer with extended absence of Titus P. Short a Software Developer with extended absence of Titus P. Environmental subsystem is not staffed. Affects LBT weather station. Environmental subsystem is not staffed. Affects LBT weather station. Network Engineer/Administrator to carry out Network redesign implementation is not staffed. Network Engineer/Administrator to carry out Network redesign implementation is not staffed. Web services administration and development is not staffed. Web services administration and development is not staffed. 20-Oct-2008 LBT Q Eng/SW Review

Planning (Q3/2008) Networking initiative Networking initiative Cisco fiber and copper port increase - Nov 3 rd, 2008 Cisco fiber and copper port increase - Nov 3 rd, 2008 Characterize Telescope network performance – Fall 2008 Characterize Telescope network performance – Fall 2008 Labeling cables (copper and fiber) – Fall 2008 Labeling cables (copper and fiber) – Fall 2008 Documentation of network (copper and fiber) – Fall 2008 Documentation of network (copper and fiber) – Fall 2008 Privatizing the TCS subnet Privatizing the TCS subnet Providing private instrument subnets – 2009 Providing private instrument subnets – 2009 Continue design of new networking architecture – Fall 2008 Continue design of new networking architecture – Fall 2008 Install Hardware Infrastructure enhancements/upgrades Install Hardware Infrastructure enhancements/upgrades New TCS Servers using CentOS 5.x as development test bed – Oct 17 th, New TCS Servers using CentOS 5.x as development test bed – Oct 17 th, New Mtn. TO workstations (not all). Scheduled after arrival of 2009 budget. New Mtn. TO workstations (not all). Scheduled after arrival of 2009 budget. 20-Oct-2008 LBT Q Eng/SW Review

Planning (Q3/2008) cont. TCS Configuration Management TCS Configuration Management Operational and test builds deployed to telescope. Operational and test builds deployed to telescope. Branching for all development (no direct work being done on the software trunk). Branching for all development (no direct work being done on the software trunk). Merging into trunk only after telescope testing is concluded successfully. Merging into trunk only after telescope testing is concluded successfully. Software development and deployment managed as specific functional goals. Software development and deployment managed as specific functional goals. Lucifer and Telescope Commissioning Night Time support Lucifer and Telescope Commissioning Night Time support The organization/group needs a realistic plan that can be maintained with present staff. The organization/group needs a realistic plan that can be maintained with present staff. Software Development Software Development ICE support via IRS embedded in IIF Server. Fall ICE support via IRS embedded in IIF Server. Fall Need to migrate LBC to newer OS, C++, and ICE version of IIF Need to migrate LBC to newer OS, C++, and ICE version of IIF Begin SW effort to populate Telemetry database. Fall Begin SW effort to populate Telemetry database. Fall Complete Active Optics for Bent Gregorian commissioning (telescope and instrument). Fall to early Complete Active Optics for Bent Gregorian commissioning (telescope and instrument). Fall to early Rekindle technical talks with MODS development team. Fall Rekindle technical talks with MODS development team. Fall Direct Rotator. No new code development. Labor required for testing. Direct Rotator. No new code development. Labor required for testing. Rotator GUIs need to be added to MCSPU and MCS subsystem. Fall Rotator GUIs need to be added to MCSPU and MCS subsystem. Fall HBS. Not sure when this work will be executed. HBS. Not sure when this work will be executed. 20-Oct-2008 LBT Q Eng/SW Review