FP7 – financials and rules of participation Katerina Tzitzinou, Transport, Legal & Financial NCP Ιωάννινα, 08/12/2008 A practical.

Slides:



Advertisements
Similar presentations
Guide on Financial Issues A.Vutsova – Ministry of Education and Science Bulgaria INCO _ NET project.
Advertisements

GRIDS infrastructures under the 6th FP Contractual and financial modalities Christophe KOWALSKI European Commission, Information.
EURALINET, March 2008, Buenos AiresNot legally binding European Commission Research DG-D4 Ana Juárez FP7 Contractual Obligations and Financial Issues.
INTERREG and Tacis budgets Main differences: No breakdown of the Tacis budget between the partners is required; No strict limits for the project management.
DG RTD - Directorate J 17 July 2003 NEGOTIATIONS in the 6 FP What’s New 1 Contract structure & evolution 2 Financial provisions 3 Recommendations.
Communication campaign r. 2 Third parties & other sensitive relations Link with the projectLegal situations Carry out the projects (core tasks) 1. Beneficiary.
Communication campaign Most common issues identified: - 3rd Parties - Indirect Costs - Indirect Costs Thanos BATSILAS FCH JU Financial Officer.
1 Financial Procedures in FP7 Projects Reporting and Audits Karolina Lis Research Assistant DCU, Finance Office
Financial reporting Oskar Otsus January 2013 Moldova.
DG Research and Innovation
Research and Innovation Summary of MS questions on the Commission's proposal for DG Research & Innovation Research and Innovation Rules for Participation.
FP7 EC Rules – Groupe recherche 16 January 2006Megan Richards European Community FP7 Participation Rules (Commission proposal adopted )
University of Glasgow FP7 Brief Guide to ERC Projects.
Training Module: The MED-Dialogue project (611433) is co-funded by the European Community's ICT Programme under FP7 6 - Resource Allocation and Budgeting.
1 Emerging communities for collective innovation: ICT Operational tool and supporting methodologies for SME Associations 2010 January,
Funding Schemes. Legal and Financial Rules in the 7th Framework Programme PHOENIX Training Laulasmaa, 1 Sept 2007.
European Commission DG for Fisheries and Maritime Affairs Research & scientific analysis SSP Kick-off meeting The 6 th Framework Programme
Contractors’ Day, June 2008 to the Framework Partnership Agreement & the Specific Grant Agreement Financial Guidelines for co-ordinators and co-partners.
Not legally binding FP7 Rules for Participation and Grant agreement FP7 Helpdesk 
EHEROES EC Grant Agreement Negotiations June 1, 2011 K.U.Leuven Research & Development Myriam Witvrouw.
FP7 Regler för deltagande 18 december 2006 Monica Hjertman, Enheten för Europaprogrammen, VINNOVA
Lisbon 19 Jan Rules for participation European Commission Research DG – Legal aspects Carmen Madrigal 7th Framework Programme 7th Framework Programme.
ACCEPT project Grant Agreement FP7-SSH-2009-A.
Contracts & Finance. A) Grant Agreement / between EC and VITO / relevant for all partners B) Consortium Agreement / between partners / relevant for EC.
Financial, Reporting and Practical issues Per Mogensen, DASTI.
FP7 Rules for Participation and contractual aspects Mag. Carla Chibidziura FFG – European and International Programmes – FP7 Energy.
The 7th Framework Programme The Financial Issues Ray Lockyer Finance Business Systems 23 rd November 2007.
SOCRATES PROGRAMME ADMINISTRATIVE AND FINANCIAL HANDBOOK FOR BENEFICIARIES Selection 2005.
Financial and legal aspect in the context of proposal preparation Marija Šola, MSc. Project manager University of Belgrade School of Electrical Engineering.
WE-Mentor Enterprising women in European Research mentoring India/Israel/Romania/Turkey Financial and administrative aspects in FP7.
Training Seminar on an Information Point for FP7 in Palestine Witkowski Jacob, BA,CPA, CIA Nicosia, Cyprus November 2008.
MELIA KICK-OFF MEETING 4th-7th September MELIA KICK-OFF MEETING September 4th-7th 2006 Ana Villacampa-CSIC.
TBTIMPACTS SIXTH FRAMEWORK PROGRAMME SPECIFIC TARGETED RESEARCH PROJECT Assessing impacts of TBT on multiple coastal uses TBTIMPACTS Contract no.: INCO-CT
FP7 : Model Grant agreement and Participation Rules
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
RTD-A.3 Legal Unit – Myriam Gómez-Martelo 13/05/2005- University of Naples Not legally binding Sixth Framework Programme Rules and legal aspects FP6 CONTRACTS.
October 25, 2005 Pathways To Successful EU-Research Projects Financial management in FP 6 projects Praha, October 25, 2005 Claudia Labisch KoWi Office.
Ljubljana, Slovenia 2 March Rules for participation Carmen Madrigal Legal aspects European Commission - Research DG « FP7 Challenges to thirve the.
Basic principles of FP7 Grant Agreement Financial management and reporting.
6 September 2012 GUIDE FOR APPLICANTS CORE 2012 CALL – ELIGIBLE COSTS AND FINANCIAL ISSUES ANNA FASTYN CHIEF EXPERT SECTION FOR BILATERAL PROGRAMMES AND.
Communication campaign Most common issues identified: analysis per cost category Antonio Requena Fernández FCH JU Financial Officer.
Megan Richards RTD FP6 Kick Off Meeting Priority 7 and 8 11 November 2004 Sixth Framework Programme MANAGING FP6 CONTRACTS.
SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) Kick-off Meeting June 8-10.
Bent Egebart - Receipts – Reduced contribution from the Commission? (3-parties in FP6 projects ?) Financial Guidelines for Indirect Actions.
Name, Surname, Position Event, Date, Place Financial issues.
Provisional FP-ICT InfoDay, Torino, 11/12/ The ICT Theme in FP7 How to submit a proposal 1. The Rules of the Programme.
Communication campaign Most common issues identified: - Indirect Costs Thanos BATSILAS FCH JU Financial Officer.
FINANCIAL RULES IN FP7 Barbara Trammer Krajowy Punkt Kontaktowy Programów Badawczych UE Instytut Podstawowych Problemów Techniki Polskiej Akademii Nauk.
REPORTING, BUDGET, ELIGIBLE COSTS. Main steps of the financial management of the project.
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
Volvox Understanding the Budget Angela Pettit – Contracts Officer.
P.Ignatiadis & Prof Vassilios Zacharopoulos ELKE TEI CRETE March 2011 FP7 Training Courses for TEI Crete 1 FP7 - FINANCIAL AND PROJECT MANAGEMENT.
Participation and dissemination Rules and Contracts FP6.
Proposals and projects in FP7 On-line Information Day Brussels/Budapest 22nd January 2007.
Megan Richards 6FP - Contract 18 March 2003 Sixth Framework Programme CONTRACTS.
Megan RichardsHeysel 6FP launch conference 11,12, 13 November /11/2002 Rules for Participation and contractual issues for Integrated Projects in.
Financial Guidelines FP6 – IST Directorate C 1 st Evaluation proposals co-ordinators Briefing 17 July 2003.
Rules of Participation in Framework Programme 7 Brussels Office Helmholtz Association of German Research Centres Rue du Trône 98 B-1050 Brüssel
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Contractual and Financial Management Administrative and Financial Handbook.
VITAL KICK-OFF MEETING Financial aspects 7 th – 8 th April 2008 Veterinary Research Institute Brno, Czech Republic.
Sixth Framework Programme : Contracts è Legal Framework & General Principles è Contract Structure è Collective Approach l signature and entry.
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
- Special Education Needs (SEN) Network Administrative and Financial Aspects.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
FINANCE AND BUDGET Lucia Pacillo, REA-P4 Pisa, March 2013 Research Executive Agency Marie Curie host-driven actions.
Participation and dissemination Rules
ITN Finances and Budget
Communication campaign Most common issues identified: - Subcontracting
Financial and Administrative presentation on PARTICULATES project
FP7 Grant Agreement & reporting requirements
Presentation transcript:

FP7 – financials and rules of participation Katerina Tzitzinou, Transport, Legal & Financial NCP Ιωάννινα, 08/12/2008 A practical guide for understanding EC funding and rules of participation

Terminology from FP6 to FP7 Instruments become Funding Schemes Financial Guidelines become Financial Rules “Contractor” becomes “Beneficiary” Model Contract becomes Model Grant Agreement Under eligible costs - ‘necessary’ replaced with ‘used solely to achieve project objectives’ INCO becomes ICPC (International Cooperation Partner Country) “Audit certificate” becomes “Certificate on Financial Statement

Funding Schemes FP6 – FP7 FP7 – Co-operation FP7 Funding Schemes IP STREP CA NoE SSA Collaborative Projects Networks of Excellence Coordination and Support actions FP6 Instruments

From Instruments (FP6) to Funding Schemes (FP7) Funding Scheme FP7 FP6 Keyword‘Optimum’ Size? (as per FP6) ‘Optimum’ Budget? (as per FP6) Collaborative Projects (CP) (IP/STREP) Deliverables New Knowledge 3-20 participants€ Million (average < €10 Million) Network of Excellence (NoE) (NoE) Integration 6-12€4-15 Million (€7 Million) Co-ordination and Support Actions (CSA) (CA) Co-ordination (SSA) Laying the Groundwork € Million (€1 Million) € Million (€0.5 Million)

Funding Schemes - Characteristics Funding Scheme General Description Collaborative Projects Consortia with participants from different countries New knowledge, technology, products or common resources for research Size, scope and internal organisation of projects can vary Networks of Excellence (NoE) Joint programmes by organisations integrating activities in a given field Longer term co-operation Formal commitment to integrate resources Coordination & Support Actions Networking, exchanges, trans-national access to research infrastructures, studies, conferences, etc.

Eligibility for Funding Eligibility for Funding : 1.Legal entities from Member States and Associated countries or created under Community law (and JRC) 2.International European interest organisations 3.Legal entities established in international cooperation partner (ICPC) countries and International organisations, third countries other than INCO, if provided for in specific programme or work programme; or if essential for carrying out action; or provision for funding is provided for in a bilateral agreement between Community and the third country

Funding principles Based on : co-financing no-profit NO cost models like FP6 (AC/FC/FCF) 1.Usual method to be reimbursement of eligible costs 2.May also use flat-rate and lump sum financing

Reimbursement of Eligible Costs No cost models Possible options (?) appear to be: –% of all eligible direct and indirect costs (actual overhead) –% of all eligible direct costs with flat rate for indirect costs –% of all eligible direct costs with an average/simplified indirect cost rate for public bodies etc (simplified method) Flat rate for indirect costs is under discussion But this does mean increased reimbursement rates for HEIs, Public Bodies and others

Flat Rate / Lump Sum Lump sum In particular as option for participants from ICPC. Also for Marie-Curie actions. Determination of forms of grants to be used in the work programmes and calls for proposals

Upper Funding Limits (1) Research activities: 50% of eligible costs, except for: –SMEs: 75% –Non-profit public bodies: 75% –Secondary and higher education establishments: 75% –Research organisations (non-profit): 75% Demonstration activities: 50% of eligible costs “Frontier” research actions: 100% Coordination and support actions: 100% Training and career development of researchers actions: 100% Other activities (management, training, etc): 100% Receipts to be taken into account

Upper Funding Limits (2) FP6FP7 Industry FP7 Public Bodies, Universities, SMEs, etc. RTD50% 75% Demonstration35%50% Other*100% ERCProposing 100% direct costs plus 20% flat rate for indirect costs * Co-ordination and Support Actions, Training, Management

Eligible Costs Participants charge direct and indirect costs (option of flat rate for those who do not or cannot charge real indirect costs) Costs must be: actual; incurred during the project; determined according to the usual accounting and management principles/practices; used only to achieve project objectives; consistent with principles of economy, efficiency and effectiveness; recorded in accounts and paid (or the accounts of third parties); exclusive of non-eligible costs. Average personnel costs may be used if consistent with above and do not differ significantly from actual

Direct Costs Examples of eligible direct costs The cost of personnel assigned to the project. Working time to be charged must be recorded by any reasonable means (e.g. timesheets) Hired external consultants Travel and subsistence allowances for staff taking part in the project The purchase costs of durable equipment (depreciated cost, the portion of the equipment used in the project may be charged) The cost of consumables and supplies Subcontracting Certificate on the methodology and certificate on the financial statement New in FP7: Under FP7, there are no cost models. FC, FCF and AC Models disappear. Consequently, all costs of personnel working on a project may be eligible if they fulfill the conditions of the Grant Agreement (art. II.14). No more difference between additional staff and permanent staff.

Indirect Costs (1) Eligible costs = direct costs + indirect costs Indirect Costs, also called overhead costs, are costs that cannot be directly attributed to the project work but are necessary to support the overall project. For all: – either actual overhead or simplified method – flat rate of 20% of direct costs (excluding subcontracting) Non-profit Public Bodies, Secondary and Higher Education establishments, Research Organisations and SMEs unable to identify real indirect costs, may apply for a flat rate of 60% for funding schemes with RTD. - after 1st January 2010  tbd but > 40% For CSA limit of 7% of direct costs For Marie-Curie actions a flat rate of 10% of direct costs.

Indirect Costs (2) Indirect costs (overheads) are all those structural and support eligible costs of an administrative, technical and logistical nature: which cannot be identified as being directly attributed to the project. which can be identified and justified by its accounting system as being incurred in direct relationship with the eligible direct costs attributed to the project. which are cross cutting for the operation of the beneficiary body’s various activities and cannot therefore be attributed in full to a specific project. Examples Hiring or depreciation of buildings, water/ gas/ electricity, Maintenance, Insurance, Supplies and petty office equipment, Legal Advice, Communication and connection costs, Postage, Administration and financial management, Human resource, training Documentation

Indirect Costs (3) Example: Equipment Depreciation Equipment was purchased in May 2005 for €600,000, with a depreciation period of 60 months, according to beneficiary’s accounting practices. If the Grant Agreement of the Project NATASA is signed in March 2008, the equipment would be 34 months old, and therefore, 34/60 financially depreciated. Also suppose that the equipment will be used for this 36-month project 25% of the time. Under these conditions, the beneficiary can declare the depreciation costs incurred under the project for the remaining “lifetime” of 26 months, pro rata their use, so for 25%. The amount than can be charged to the project NATASA is: (26/60) x €600,000 x 25% = € 65,000

Indirect Costs (4) Real Indirect Costs: Beneficiaries with analytical accounting system that can identify and group their indirect costs must report their real indirect costs - or choose the 20% flat rate option A fair and reliable cost driver to allocate indirect cost from the 'pool of costs' into the different projects should be used. Personnel costs is the most common cost driver. Indirect costs are often expressed as a % of personnel costs. The method of calculation must be in accordance with normal accounting practices

Indirect Costs (5) Simplified method A participant may use a simplified method to calculate its indirect costs at the level of the legal entity, and not at a detailed level (centre, department) if this is in accordance with its usual management and accounting principles If no analytical accounting system Based on actual costs of the last closed accounting year Does not require previous certification by EC

Indirect Costs (6) Simplified method - example SST is an industrial company with 600 employees, of which 200 are considered indirect (management, human resources, financial administration, supporting services, etc). SST has €72M annual sales and is involved in a number of FP7 projects. SST’s overall annual overheads are €19M, of which €3M is non-eligible (marketing and sales, and other commercial costs). The 400 direct employees work a total number of 640,000 productive hours per year. The total salaries of the direct employees, including social security costs, are €20M. Method 1: Calculation of Indirect costs as a fixed hourly rate of the personnel costs. The calculation method is based on the eligible indirect costs (per year) divided by the annual productive hours: Overhead= €16M/640,000= €25/productive hour Method 2: Calculation of Indirect costs as a percentage of the personnel costs. The overheads are allocated as a percentage of the direct personnel hours. Overhead= €16M/ €20M = 80%

Indirect Costs (5)

Subcontracts Subcontractors charge a price, which usually includes a profit (different from third parties, which charge only the costs of the activity) Tasks have to be indicated in Annex I awarded according to best value for money principle shall not be a “core” part of the work (based on qualitative criteria more than quantitative – in fact there is no upper limit) Can be under framework contracts Public entities: must follow national procurement principles Private entities: should follow the rules that they usually apply for the selection of procurement contracts e.g. submission of several quotes

Receipts (1) 2 kinds of receipts must be taken into consideration to avoid any profit: Transfers from third parties to the beneficiary (if specifically attributed to the project and not reimbursed): – Financial transfers – Contributions in kind. Example 1. An expert from the ministry of Environment is allocated to work free-of charge 2 days per week for a project in the University of East Anglia. This is a receipt of the project. Example 2. An expert from the ministry of Environment is allocated to work free-of charge 2 days per week in the ENV school in the University of East Anglia. UEA can decide how to use the expert, so this is not a receipt of the project, because the expert is considered to be an “own resource” of UEA. Income generated by the project. e.g. from service provision

Receipts (2) At final payment the EC contribution will take into account any receipts of the project. For each beneficiary: the eligible costs  EC contribution + the receipts for the project Otherwise: reduction of EC contribution! Eligible Costs (budgeted) Eligible Costs (actual) Budgeted EC contribution Project Receipts Actual EC contribution Reduction of EC contribution €100,000 €50,000€25,000€50,000None €100,000 €75,000€25,000€75,000None €100,000€90,000€50,000€40,000€45,0005,000 reduction due to lower eligible costs €100,000 €75,000€40,000€60,00015,000 reduction to secure non-profit principle €100,000€110,000€75,000€40,000€70,00015,000 reduction to secure non-profit principle Examples

Example Calculations (1) General funding calculation example for a university ActivityDirect Eligible Costs Indirect Eligible Costs (60%) Total Eligible Costs Funding Rate (%) Funding RTD250,000150,000400,00075%300,000 Demonstration50,00030,00080,00050%40,000 Management & Coordination 80,00048,000128,000100%128,000 Other20,00012,00032,000100%32,000 TOTAL400,000240,000640,000N/A500,000

Example Calculations (2) CSA project funding calculation example for a Company with real indirect costs ActivityDirect Eligible Costs Actual Indirect Costs Eligible Indirect costs (7%) Actual Total Costs Funding Rate (%) Eligible for Funding Total Costs CSA90,00099,0006,300189,000100%96,300 Subcontra cts 10, %10,000 TOTAL100,00099,0006,300199,000N/A106,300

Maximum EC contribution Article 5 in Annex I of the Grant agreement defines the maximum Community Financial Contribution in absolute numbers. Example BudgetedAccepted at the end of the project Total eligible RTD costs750,000€800,000€ Upper funding rate (RTD activities)50% Upper funding reimbursement (RTD activities)375,000€400,000€ Total eligible management costs50,000€47,500€ Upper funding rate (management activities)100% Upper funding reimbursement (management activities) 50,000€47,500€ Total eligible costs800,000€847,500€ Maximum EC contribution, article 5425,000 €425,000€* The Total EC funding is limited to 425,000 € indicated in article 5, Annex I.

Payment Modalities (2) Example: Project with duration of 3 yrs, and EU funding of 3 m€ PaymentsTotal money received Pre-financing (average EU funding 1m€/year, usually 160%) = 1,6m€ 1,6m€ 1st Interim payment 1m€ accepted, payment 1m€ 2,6m€ 2nd Interim payment 1m€ accepted, payment 0,1m€ (because of retention 10%) 2,7m€ Final payment 0,3m€ (retention 10%) 3m€3m€

Certification (1) 2 types of certificates: certificate on financial statements (CFS) (Form D)- expenditure verification certificate on the methodology (Form E) - system verification – Personnel & Overheads N.B.: The submission of a certificate does not waive the right of the Commission to carry out its own audits (Article II.22 of the FP7 model grant agreement).

Certification (2) Certificate on financial statements (CFS) Mandatory for a beneficiary when its requested funding for the project isequal or more than 375,000€ –exception for project of 2 years or less: no intermediate CFS submitted, only at the end

No financial collective responsibility However, there is ”technical responsibility” to carry out the project jointly and severally vis-à-vis the Commission. At the end of the grant agreement, up to 1% of EC Contribution may be deducted (except for public bodies, education establishments, entities guaranteed by MS or AS) Each beneficiary financial responsibility limited to its own debt Replaced by Guarantee Fund GF = 5% of EC contribution paid at the moment of the pre-financing

ICPC special (1) ICPC participants may alternatively opt for the EC financial contribution to take the form of a lump sum financing. The lump sum covers all the costs of an ICPC participant, not only personnel and travel, but also equipment consumables and indirect costs. Upper funding limits are applied per funding scheme (75%, 100%, etc) Lump sum contribution per ICPC country income group Economy of the ICPC Contribution (€/researcher/year) Low income8,000 € Lower middle income9,800 € Upper middle income20,700 €

ICPC special (2) No audit certificates will be requested. Only a declaration that the money were actually spent. The relevant Time Sheets should be in place Example In a 3 year research project, 3 researchers are spending 50% of their time and 3 are working full time. Total researcher working years are 3 years x (3+1,5) =13,5 Lump sum for Low income country is 8000 €/researcher/year EC maximum contribution is 75% for Universities, so lump sum funding for the organisation= 13,5 x 8000 € x 75% = 81,000 €

More info Guide to Financial Issues ftp://ftp.cordis.europa.eu/pub/fp7/docs/financialguide_en.pdf Model grant agreement Legal and Financial NCPs Βασίλης Τσάκαλος Κατερίνα Τζιτζινού