FP7 IDEAS Programme The European Research Council … and its funding schemes. Ana Beramendi VETENSKAPSRÅDET.

Slides:



Advertisements
Similar presentations
European Research Council (ERC): Funding Opportunities
Advertisements

Pavel Exner Member of the European Research Council Scientific Council Research Connection Prague, 7 May 2009 FP7 IDEAS Programme The European Research.
Experience of European Research Council Panel Ole H Petersen CBE FRS Chair of ERC StG Panel LS4 School of Biosciences.
Tüzin BAYCAN-LEVENT ERC Advanced Grant Evaluation.
Integrating the gender aspects in research and promoting the participation of women in Life Sciences, Genomics and Biotechnology for Health.
1 The FP7 Framework Programme “ERC (IDEAS)” Ayala Karniol ISERD.
European Commission - Marie Curie Actions. Intra-European Fellowships for Career Development Call identifier FP7-PEOPLE-2009-IIF Closing Date: 18 August.
Florent Bernard, PhD DG Research European Commission “People” Programme : The Marie Curie Actions in FP7.
University of Trieste PHD school in Nanotechnology Writing a proposal … with particular attention to FP7 Maurizio Fermeglia.
FP7 ERC 2010 Advanced Grant Call Description. ERC Advanced Grant Flexible grants for ground-breaking, high-risk/high- gain research that opens new opportunities.
Jean-Pierre BOURGUIGNON
Geography FACULTY OF Environment Living with Difference in Europe: making communities out of strangers in an era of super mobility and super diversity.
European Research Council:
Established by the European Commission The European Research Council © Art & Build Architect / Montois Partners / credits: S. Brison ERC Achievements and.
Evaluation of the Humanities at the ERC Alain Peyraube CNRS and EHESS (FR) ERC Scientific Council  Relevance and Impact of the Humanities University of.
Christian KRASSNIG ERC/European Commission RTD, Directorate S Fax The European Research Council Séminaire ERC 13 fév 2007– Université Catholique.
EU’s 7th framework program ( ) Cooperation Ideas (=ERC) People Capacities European Research Council (ERC) ERC The result of strong pressure from.
Information about ERC – the European Research Council What is ERC? Call for Advanced Investigator Grants Outcome first call for Starting Independent Researcher.
Sami Gülgöz Koç University EU 7th FRAMEWORK PROGRAMME ERC INFODAY 1 March 2010, Bogazici University, Istanbul.
Proof of Concept IGLO Veronica Beneitez Pinero March 2015
ERC - Advance Grant Call 2008 Alejandro MARTIN HOBDEY ERC DG RTD Unit S-2 PC Meeting Brussels, 30 January 2008.
1 7th Framework Programme Specific Programme “Ideas” European Commission Directorate B November 2005.
- 1 - UNIVERSITY STRATEGY AND THE EUROPEAN RESEARCH COUNCIL Mathias Dewatripont June 2007.
European Research Council For operational reasons : 25 panels in 3 main domains PE: Physical Sciences, Engineering (10 panels) LS: Life Sciences (9 panels)
Claudia Jesus-Rydin Research Programme Officer Starting Grant Unit Dublin, 09 September 2009 The European Research Council ERC STARTING GRANT INFORMATION.
National Science Centre An Important Component of Research Funding in Poland RECFA visit to Poland, Krakow 2012 Andrzej Jajszczyk.
ERC in Horizon 2020 Ben Turner ERC Executive Agency November 2013.
© Art & Build Architect / Montois Partners / credits: S. Brison The European Research Council Buenos Aires, March 12, 2015 Katia Fach Gómez Scientific.
1 The FP7 Framework Programme “ERC (IDEAS)” Eva Rockman ISERD.
Preparing an ERC application Dr John Burden Research Support Services.
FP7 ERC UPDATE: WP2008 characteristics, priorities, specific elements (AdG) Theodore Papazoglou, PhD ERC/European Commission RTD, Directorate S.
Provisional FP7-ICT InfoDay, Torino, 11/12/ The ICT Theme in FP7 How to submit a proposal 3. Submission and selection.
European Research Council Established by the European Commission The European Research Council IFA Conference Prague, 31 May 2012 Alessandra Ferrari Research.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
EUROPEAN COMMISSION FP7 Specific Programme IDEAS.
Gianpietro van de Goor, PhD Deputy Head of Unit “Strategic matters and relations with the ERC Scientific Council” ERC-DIS / European Commission Kalkara/Malta,
Mathias Dewatripont Université Libre de Bruxelles Member of the Scientific Council of the ERC The European Research Council January 2010.
Katia Insogna National Contact Point MC Individual Actions: how to present a successful proposal 14 December 2010.
The Assessment of COST Actions PHOENIX Workshop in Kyrgyzstan, May 2007 “Road to excellence: Research evaluation in SSH“
Pilar López ERC/European Commzission RTD, Directorate S , fax The European Research Council Event.
Gianpietro van de Goor, PhD Deputy Head of Unit “Strategic matters and relations with the ERC Scientific Council” ERC-DIS / European Commission Kalkara/Malta,
The FP7 Inputs for building a project proposal AN INFORMATION POINT FOR FP7 IN PALESTINE: Training Seminar of experts Nicosia, Cyprus November.
ERC - Advance Grant Call 2008 Pilar Lopez S2 Unit Ideas Programme Management Athens, 11 April 2008.
Short introduction to IDEAS Programme Maria Koutrokoi Hellenic NCP of ICT, IDEAS and Research Infrastructures Programmes Department for Strategy, Planning.
Dr. Christian Krassnig European Commission ERC-DIS Unit S2 The European Research Council Helmholtz – NachwuchsgruppenleiterInnen,
European Funding Opportunities for Researchers of all Nationalities and Research Fields Canada, 2-3 February 2015.
How can UiBs division of research management help with your ERC application? Dr. Anja Hegen Adviser externally financed projects Division of research management.
© Euresearch  Katja Wirth Bürgel  4 November 2009  European Research Council  1 Dr. Katja Wirth Bürgel  National Contact Point European.
Directorate of Research, Enterprise & Innovation Services Developing your Research – The European Research Council (ERC) Frontier Research Grants.
European Research Council │ 1 ERC Advanced Grant Call 2 EPSS Changes / Improvements Section A1: Proposal and PI Information ► Linking of the 1st Keyword.
IDEAS: characteristics, priorities, specific elements of the ERC Advanced Grant Theodore Papazoglou, PhD ERC/European Commission RTD, Directorate S.
The evaluator point of view…. “IDEAS, ERC Starting Grant 2007” Henriette Molinari Department of Biotechnology University of Verona.
What are sponsors looking for in research fellows? Melissa Bateson Professor of Ethology, Institute of Neuroscience Junior Fellowships.
Theodore Papazoglou, PhD ERC/European Commission RTD, Directorate S Fax st Call for Starting Independent.
Theodore Papazoglou ERC/European Commission RTD, Directorate S Fax ERC Funding Actions/Grant Agreement Modalities.
Béatrice Thiry Information and Communication Assistant “Strategic matters and relations with the ERC Scientific Council” ERC-DIS / European Commission.
Carl-Henrik Heldin Scientific Council The European Research Council Stockholm October 10, 2007.
European Research Council Paul Knobbs Research Development Manager Research Support Office.
ERC grants Funding for excellent ideas. European Research Council - mission 2 To encourage the highest quality research in Europe through competitive.
The European Research Council: ERC Funding Opportunities
Overview of ERC grant schemes
Marie Curie Career Integration Grants
The European Research Council
ERC Scientific Council member
European Research Council
European Research Council (ERC)
The European Research Council
What are sponsors looking for in research fellows?
Frontier Research in Europe with an ERC grant
The European Research Council
Presentation transcript:

FP7 IDEAS Programme The European Research Council … and its funding schemes. Ana Beramendi VETENSKAPSRÅDET

European Research Council │ 2 ERC Grant schemes ERC Grant schemes 3R and 2 schemes Aim: Retain – Repatriate – Recruit exceptional researchers in any field of science, engineering and scholarship to pursue pioneering frontier research Activities: Two complementary funding schemes  ERC Starting Grant (StG): attract & retain the next generation of independent research leaders - up to € 2.0 Mio for 5 years  ERC Advanced Grant (AdG): attract & reward established independent research leaders - up to € 3.5 Mio for 5 years Call Budget for Starting Grant 2010: € 528 Mio Call Budget for Advanced Grant 2010: € 590 Mio StG grant

European Research Council │ 3 ERC Grant schemes ERC Grant schemes Who can apply? – General requirements 1.Principal Investigator (PI)  Nationality, age or current place of work not relevant - but: working or moving to work in Europe (EU member state, FP7 Associated Country) 2.In conjunction with a Host organisation  Legally recognised public or private research organisation  To be located in MS or AC 3.Frontier Research Project  All fields of science, engineering and scholarship are eligible (investigator-driven, bottom-up) 4.Individual research team  PI has freedom to choose National or trans-national character, if scientific added value proven

European Research Council What is frontier research?  Research at the frontiers is:  Intrinsically risky  Characterised by an absence of disciplinary boundaries  of ground-breaking nature: addresses important challenges, has ambitious objectives, has novel or unconventional concepts and/or approaches  The ERC wants to avoid outmoded distinctions:  Between “basic” and “applied” research  Between “science” and “technology”  Between “traditional” disciplines

European Research Council │ 5 ERC Grant schemes Operational Principles  Application in response to calls for proposals  Principal Investigators applies in conjunction and on behalf of a research-performing host institution  Electronic Proposals Submission System (EPSS)  Single submission, staged evaluation procedure  to manage a large number of applications  Panel-based international peer review process  Scientific Council selects panels and peer reviewers  Panels assess and select proposals

European Research Council │ 6  ERC covers all fields of science, engineering and scholarship  3 main research domains + interdisciplinary research:  Physical Sciences & Engineering – 10 Panels  Life Sciences (incl. medical) – 9 Panels  Social Sciences & Humanities – 6 Panels  Interdisciplinary Research (cross-panel / cross-domain) – Panel Chairs meeting  The call budget will be pre-allocated to these areas as follows:  39% - 34% - 14% - 13% ERC Grant schemes ERC Grant schemes All fields, budget pre-allocation in areas

European Research Council ERC Panel structure Social Sciences and Humanities (SH)  SH1 - Individuals, institutions & markets  SH2 - Institutions, values, beliefs and behaviour  SH3 - Environment & society  SH4 - The Human Mind and its complexity  SH5 - Cultures & cultural production  SH6 - The study of the human past Physical Sciences & Engineering (PE)  PE1 - Mathematical foundations  PE2 - Fundamental constituents of matter  PE3 - Condensed matter physics  PE4 - Physical & Analytical Chemical sciences  PE5 - Materials & Synthesis  PE6 - Computer science & informatics  PE7 - Systems & communication engineering  PE8 - Products & process engineering  PE9 - Universe sciences  PE10 - Earth system science Life Sciences (LS)  LS1 - Molecular & Structural Biology & Biochemistry  LS2 - Genetics, Genomics, Bioinformatics & Systems Biology  LS3 - Cellular and Developmental Biology  LS4 - Physiology, Pathophysiology & Endocrinology  LS5 - Neurosciences & neural disorders  LS6 - Immunity & infection  LS7 - Diagnostic tools, therapies & public health  LS8 - Evolutionary, population & environmental biology  LS9 - Applied life sciences & biotechnology

European Research Council │ 8 ERC Grant Schemes Evaluation: Scientific Excellence is the sole criterion Evaluation of Excellence at three levels: Quality of Principal Investigator Quality of Research Project Research Environment Referees and panels evaluate and score criteria under Heading 1 and Heading 2 numerically which will result in the ranking of the projects:  1-4 per criterion (4:Outstanding, 3: Excellent, 2:Very Good, 1: Non- Competitive)  Threshold ≥ 2 per criterion. Note: Proposals passing quality thresholds and which lie above the budgetary cut-off level will be retained. Criteria under Heading 3 will be considered as "pass/fail" and commented but not scored

European Research Council │ 9 ERC Grant Agreement ERC Grant Agreement Concept  Agreement between ERC and Principal Investigator’s (PI’s) hosting organisation  Rights/obligations on scientific, financial, ethical conduct and monitoring, eligible costs, IPR, modifications, grant portability  Supplementary Agreement between PI and its hosting organisation  Rights/obligations: administration, project execution, IPR

European Research Council │ 10 ERC Grant ERC Grant The concept of ‘portability’ “Money follows the researcher”  The Principal Investigator (PI) is entitled to transfer the grant to another institution  normally after a minimum 2 years at the sponsoring institution  Proper justification and ERC approval required StG grant

European Research Council │ 11 ERC Starting Grant ERC Starting Grant Profile of the PI read the Guide for Applicants!Eligibility window: 2-10 years after PhD award - certain types of career breaks are accepted up to a maximum of 4.5 years read the Guide for Applicants!  Starters : award of PhD from 2 to 6 years prior to call publication  Consolidators : award of PhD over 6 and up to 10 years prior to call publication. Note: In order to assure comparable success rates for the starters and the consolidators the indicative budget of each panel will be divided in proportion to the budgetary demand of the proposals submitted by these two categories Potential for research independence and evidence of maturity  at least one important publication without participation of PhD supervisor and significant publications as main author.  Monographs, invited presentations in well-established international conferences, granted patents, awards, prizes, etc

European Research Council │ 12 ERC Advanced Grant ERC Advanced Grant Profile of the PI Any nationality or age Any current place of work – but: working or moving to work in Europe (EU member state, FP7 Associated Country) Applicants must be scientifically independent Strong leadership profile (impact, recognition) read the Guide for Applicants!Excellent track record (in recent years, achievements not older than 10 years) read the Guide for Applicants!

European Research Council ERC Starting Grant 2010 ERC Starting Grant 2010 Reapplication rules Major change for StG 2010 applicants (ERC-2010-StG):  Every other call, unless proposal was evaluated above the quality treshold at the end of step 1 of the evaluation. Note that for StG 2 (ERC-2009-StG) previous rule of reapplication still applies:  no PI can apply to the StG 3 (ERC-2010-StG) unless proposal was evaluated above the quality threshold during the step 2 but not funded due to insufficient budget │ 13

European Research Council ERC Advanced Grant 2010 Reapplication rules Modifications for AdG 2010 WP 2009WP 2010 Re-application rule: Applicants of either ERC-2008-AdG or ERC AdG calls need to have met the quality threshold after step 1 to be eligible for the ERC-2010-AdG call. Re- application rule unchanged: Applicants of either ERC-2008-AdG or ERC AdG calls need to have met the quality threshold after step 1 to be eligible for the ERC-2010-AdG call. Re-application rule changed: only allowed to re-apply for ERC-2011-AdG if proposal is evaluated above quality threshold at step-2 but not funded. Involvement of PI: recommendation in Guide for Applicants Involvement of PI: at least 30% of working time to the ERC-funded project while spending at least 50% of the total working time in an EU Member State or Associated Country

European Research Council │ 15 ERC Starting Grant ERC Starting Grant Proposal content and submission ERC Grant proposal StG 2010 PART A – online forms A1 Proposal, PI and HI data A2 Host institution info A3 Budget PART B1 * – submitted as.pdf Cover page1 p. Section 1 The Principal Investigator Scientific Leadership Potential2 p. CV (including “funding ID”) 2 p. Early achievements track record2 p. Extended synopsis5 p. PART B2 * – submitted as.pdf Section 2 Scientific proposal15 p. Objectives, methodology, resources, ethical issues table Section 3 Research Environment2 p. Annexes * – submitted as.pdf -Statement of support by host - If applicable: explanatory info and docs on ethical issues - Ethical Issues Table * use templates !

European Research Council PART A – online forms A1 Proposal, PI and HI data A2 Host institution/ other organisations A3 Budget (reference for grant) PART B1 – submitted as.pdf Cover page 1 p Section 1 Track Record of PI a) Scientific Leadership (factual!) 2 p. b) CV (including “funding ID”) 2 p. c) Early achievements track record 2 p. d) Extended synopsis 5 p. PART B2 – submitted as.pdf Section 2 Scientific proposal 15 p. Section 3 Research Environment 2 p. Annexes – submitted as.pdf -Statement of support by host - If applicable: explanatory info and docs on ethical issues - Ethical Issues Table - Co-Investigator Annex (if applicable) ERC Grant proposal AdG 2010 ERC Advanced Grant 2010 Modifications for AdG 2010

European Research Council │ 17 ERC Grant schemes ERC Grant schemes Proposal evaluation Step 2 Evaluation - Indiv. assessments - Interdisciplinary flag - Interviews (StG only) - PANEL MEETINGS - Ranking Step 1 Evaluation - Indiv. Assessments - PANEL MEETINGS - Ranking Submission Section 1 Section 2 Section 3 Part – B Section 1 Section 2 Section 3 Part – B + Annexes Eligibility Check Part - A Form A2 Form A3 Form A1

European Research Council │ 18 ERC Advanced Grant 2010 Guide for Applicants AdG 2010  Structure: separated from the ERC Starting Grants  Adjustments related to the WP 2010 changes  Reference to the new Co-Investigator annex (to be uploaded with personal data of Co-I e.g. Name/Gender/Address/Nationality)  Increased emphasis on various aspects of proposal preparation and submission such as: ─ONLY Part B1 (not Part B2) is reviewed in Step 1 of the evaluation ─Strongly encourage to use costing table template to facilitate the assessment of resources by the panels ─Download submitted EPSS documents to check their completeness and integrity before the deadline

European Research Council │ 19 ERC Advanced Grant 2010 EPSS - examples of changes Additional information/ questions A 1 form:  Yes/No: Permission to use the title and abstract when contacting remote referees  Yes/No: Agreement to devote at least 30% of the working time to the ERC-funded project (50% in Europe)  Contact person for the ERC at the Host Institution to communicate results

European Research Council │ 20 ERC Advanced Grant 2010 Lessons learnt for AdG 2010  Synopsis of Part B 1 should be carefully written (this is the only proposal information that is accessible and judged at step 1!)  Coherency of budget figures (A3 and Part B2, in case of doubt usually A3 figures serves as a reference)  Individual reviews are done remotely and are not harmonised (PIs sometimes do not seem to be aware of that)  Evalution report  Evaluation report consists of panel comments summarising the Panel decision (incl. key strength and weaknesses) and individual comments (Panel Members, remote referees) which may not be necessarily convergent!

European Research Council Deadlines Starting Grant 2010 Physical Sciences and Engineering Life Sciences Social Sciences and Humanities Advanced Grant 2010Advanced Grant 2010 Physical Sciences and Engineering Life Sciences Social Sciences and Humanities │ 21

European Research Council │ 22  Specific text of “Call for Proposal”  ERC Work Programme  ERC Guide for Applicants (!)  ERC Grant agreement Other:  ERC Guide for Grant Holders  ERC Guide for Peer Reviewers  ERC Rules on submission, evaluation, selection and award procedures Read always the last published versions ! available at

European Research Council │ 23 Up-to-date Information ERC website at NEW SECTION Funded Projects

European Research Council │ 24 Applicants Services Applicants Services Information and helpdesks ERC News Alert ERC National Contact Points In Sweden: Ana Beramendi, VR and Gunnar Sandberg, Vinnova ERC helpdesk EPSS helpdesk technical support on electronic proposal submission

European Research Council │ 25 Obrigado Danke! Merci! Thank you! Gracie! Gracias! Ευχαριστώ!