Fp7 - LEADER Slide 1 ALFRED C&S rods mechanical design FA_20121120.ppt Task 2.4 – Mechanical Design & Drawings of LFR and ETDR Fuel Assemblies (mech. Design)

Slides:



Advertisements
Similar presentations
Injection Molding MFG 355.
Advertisements

Chapter 12 Working Drawing
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
INTRODUCTION MANUALLY ADJUSTABLE STILTS “Easy Lifts” INTRO PROBLEM
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
Topics Introduction Terminology Thread Specifications Bolts and Screws
Chapter 17: Springs It must be confessed that the inventors of the mechanical arts have been much more useful to men than the inventors of syllogisms.
Fp7 - LEADER Slide 1 ALFRED C&S rods mechanical design C&S_Rods_ ppt Task Primary system conceptual design of ALFRED Control rods & Safety.
Prior investigation of absorber rod Dy 2 O 3  TiO 2 behavior after severe accident test FSUE SRI SIA “LUCH” ICP MAE Presented by Dmitry N. Ignatiev Forschungszentrum,
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
FE calculations for the bolted helium vessel May 6th 2015
Statics November 4, A 1kg ball is hung at the end of a rod 1m long. If the system balances at a point on the rod 0.25m from the end holding the.
A conversion kit to use a dugout or simple boat as a training scull.
AIDA Infrastructure for very forward calorimeters Design proposal Mechanical support structure Designers:In collaboration with: Eric DavidFrancois-Xavier.
TECH 104 – Technical Graphics Communication
Task 3.3 Fuel Transfer System Conceptual design Joel Janssens SCKCEN LEADER WP3 Technical Meeting, Karlsruhe, 20/11/2012 Copyright © 2011 SCKCEN.
Anduze – 03/09/ Alveolar Structure - Towards ordering of pieces.
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Buoyancy Analysis Inputs:. Buoyancy Mechanical Design Johnson Electric Motor (12V) –High rpm (16,000 –Lightweight (7.50 oz per motor) Alexander.
Types of Threaded Fasteners.  Used to hold parts together  Clearance holes in parts  Nut on other end  Can also be used with a threaded hole.
1 HVACR116 – Trade Skills Structural Drawings. 2.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Work Package 2 Giacomo Grasso ENEA UTFISSM-PRONOC LEADER Work Package 2 meeting Madrid, May 8, 2012 Current status and organization of the work.
LEADER WP3: Conceptual Design Status L. Mansani
LEADER WP3 Conceptual Design Status KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Luigi Mansani
Buoyancy Analysis Inputs:.
ALFRED System Configuration Luigi Mansani
 2005 Pearson Education South Asia Pte Ltd TUTORIAL-1 : STRESS & STRAIN 1 PROBLEM-1 The hanger assembly is used to support a distributed loading of w=16kN/m.
ALFRED and ELFR design overview Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European LFR Industrial Plant.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
ALFRED Control Rod and Safety Rod
DCAL Design review 26 July 2012 Stephane Maridor, Alparslan Tursun, Thomas Caudron, Charles-Henri Denarie, Arturo Tauro, Corrado Gargiulo 1 MECH DCAL DESIGN.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
LEADER WP3 Conceptual Design Status KIT Campus North, Karlsruhe, Luigi Mansani
LEADER Work Package 2 Status of activities Giacomo Grasso on behalf of Carlo Artioli – Work Package 2 leader UTFISSM-PRONOC ENEA LEADER PCC meeting Bologna,
Kapton module ass. Spacers for pins 3.6 m m 1.25 mm.
Working Drawing.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
KIT TOWN OFFICE OSTENDORFHAUS Karlsruhe, 21 st November 2012 CIRTEN Consorzio universitario per la ricerca tecnologica nucleare Antonio Cammi, Stefano.
Apr 29, 2003SSWG - CDR Comments1 PFIS Critical Design Review Comments Detailed response available in document SALT- 3100BP0011 (PFIS web site) Responses.
Module 4 Unit 17 – Springs and Fasteners in Industrial Prints.
AMS TRD GAS SUPPLY SYSTEM BOX_S Mechanical Structure Corrado Gargiulo* Robert Becker** *INFN Roma1 **MIT CERN, July AMS TRD GAS SUPPLY SYSTEM.
Fundamentals of Machine Component Design, 4/E by Robert C. Juvinall and Kurt M. Marshek Copyright © 2006 by John Wiley & Sons, Inc. All rights reserved.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
Engineering Analysis & Updated Layout Drawings SofaKing 9 March 2005.
Chapter 31 Solid-State Welding Processes
Endcap shielding senarios:
LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary
FRESCA2 Update on the dipole design and new calculations
Load Balancing: List Scheduling
New Design for Beam Test Structure
1.6 Allowable Stress Allowable Load < Failure Load
Effect of preload in mechanical systems
Duct Insulation Attachment Team
Assembly instructions for M-K all bolt together hoppercone kit.
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
4D-100, 4D-600 2½”- 10”.
Sugar Brick: Charcoal Briquette Compactor
Gattini Detector Installation
Bunker Wall Design Wall
Load Balancing: List Scheduling
GENERAL MOULD CONSTRUCTION CONCEPT
Bunker Wall Design Wall ESS
AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING
State Scientific Center– Research Institute of Atomic Reactors
State Scientific Center– Research Institute of Atomic Reactors
Presentation transcript:

Fp7 - LEADER Slide 1 ALFRED C&S rods mechanical design FA_ ppt Task 2.4 – Mechanical Design & Drawings of LFR and ETDR Fuel Assemblies (mech. Design) F. Manni (S.R.S.) D. Vitale Di Maio (S.R.S.) The LEADER project ALFRED vs. LFR F/A concept ( ALFRED F/A shown ) Layout & Parts Status [Loading/Unloading Machine] [Tungsten cost estimate] TOC LEADER Technical Meeting November , 2012 Karlsruhe Institut of Technology

Fp7 - LEADER Slide 2 ALFRED C&S rods mechanical design FA_ ppt ALFRED vs. LFR ALFRED core layoutLFR core layout Fuel Assembly Control Rods Safety Rods Dummy Element = 427 y x ( × 2.5 ) ( × 1.5 ) ( × 1.2) ( × 2)

Fp7 - LEADER Slide 3 ALFRED C&S rods mechanical design FA_ ppt 127 PINS 169 PINS ALFRED core layout ELFR core layout F/A pitch ( +22% ) pin pitch ( +8% ) same pin OD ALFRED vs. LFR

Fp7 - LEADER Slide 4 ALFRED C&S rods mechanical design FA_ ppt Drag Ballast Weight Buoyancy ±20% 151 kg 312 kg 386 kg 77 kg Refueling 303 kg 253 kg 50 kg Operation Preloaded Spring Force balance (ALFRED) ±20% UP DOWN Ballast Preloaded Springs Lead Free Level (during refueling) Top Grid Diagrid Concept

Fp7 - LEADER Slide 5 ALFRED C&S rods mechanical design FA_ ppt Mixing zone level Lead free level (refueling) Concept

Fp7 - LEADER Slide 6 ALFRED C&S rods mechanical design FA_ ppt SpikeBottom ShroudFunnelUpper Shroud Ballast Head Layout

Fp7 - LEADER Slide 7 ALFRED C&S rods mechanical design FA_ ppt Spike Core Funnel Ballast Funnel Core Spike empty sections Layout

Fp7 - LEADER Slide 8 ALFRED C&S rods mechanical design FA_ ppt Ø80 Ø Ø100 Gagging device could be allocated here Spike

Fp7 - LEADER Slide 9 ALFRED C&S rods mechanical design FA_ ppt Pin Support Grid Spacers Lower Shroud

Fp7 - LEADER Slide 10 ALFRED C&S rods mechanical design FA_ ppt 1430 (overall length) 600 (60 pellets) (cladding) Pin

Fp7 - LEADER Slide 11 ALFRED C&S rods mechanical design FA_ ppt Support beam Spacer 1.5 Ø4 Pin Support Grid geometry Ø8 Sol. A Sol. B !

Fp7 - LEADER Slide 12 ALFRED C&S rods mechanical design FA_ ppt Grid Assembly Rakes Crimped Ring (crimped geometry shown) Locking Pin Pin foot Rake Sol. A Sol. B Pin Support Grid geometry

Fp7 - LEADER Slide 13 ALFRED C&S rods mechanical design FA_ ppt Thickness 0.25 mm Laser or Electron Beam welding (no Spot-welding) Obstruction: 14% Pin Spacer (grid)

Fp7 - LEADER Slide 14 ALFRED C&S rods mechanical design FA_ ppt 1 2 Thickness 0.25 mm Pin Spacer (grid)

Fp7 - LEADER Slide 15 ALFRED C&S rods mechanical design FA_ ppt “Nose”Probe leads Ø80 Funnel

Fp7 - LEADER Slide 16 ALFRED C&S rods mechanical design FA_ ppt Ballast Unit (6.9 kg, Tungsten) 6.9 x 22 = 151 kg Belleville Spring Pack Spacer (top) Head Bottom head Ballast

Fp7 - LEADER Slide 17 ALFRED C&S rods mechanical design FA_ ppt Ø100 Ø40 40 Ø30 Head & Spring Press Top grid (lower plate) Belleville washers Reference New

Fp7 - LEADER Slide 18 ALFRED C&S rods mechanical design FA_ ppt Type A disposition Type B disposition Core anti-compaction devices (plaquettes)

Fp7 - LEADER Slide 19 ALFRED C&S rods mechanical design FA_ ppt Status LFR & ALFRED F/A mechanical design reports and drawings (some amendments needed) unify F/A and C&S rods press design plaquettes implementation done to do 1 month completion time

Fp7 - LEADER Slide 20 ALFRED C&S rods mechanical design FA_ ppt thanks

Fp7 - LEADER Slide 21 ALFRED C&S rods mechanical design FA_ ppt Loading-Unloading Machine End Effector

Fp7 - LEADER Slide 22 ALFRED C&S rods mechanical design FA_ ppt Loading-Unloading Machine !? F/A Hold-down jig

Fp7 - LEADER Slide 23 ALFRED C&S rods mechanical design FA_ ppt Tungsten cost estimate