SWARP: Ships and Waves Reaching Polar regions

Slides:



Advertisements
Similar presentations
FP7-SPACE: Albert Klein Tank, KNMI EURO4M European Reanalysis and Observations for Monitoring.
Advertisements

Meteorologisk Institutt met.no OPNet, Oslo, May 2011 Do we need fine scale ocean prediction ?!... and if so, do we have the right tools ? Lars-Anders Breivik.
MyOcean2 First Annual Meeting – April 2013 WP 5 MONITORING & FORECASTING CENTRE for the Global Ocean (GLO MFC) MyOcean2 First Annual Meeting – Cork.
Marine Core Service MY OCEAN The Baltic Sea Monitoring and Forecasting Centre in MyOcean Presentation by: Frank Jannsen Priidik Lagemaa.
Mercator Ocean activity
WP4 Task T4.2 WP4-T4.2 : Establishment of validation criteria of multidisciplinary information products
EMECO-NOOS Planning Meeting June Background and Rationale Dave Mills Cefas.
Robbie Hood NOAA UAS Program Director 20 June 2013.
TOPAZ monitoring and forecasting system Laurent BERTINO, Knut Arild LISÆTER, Nina WINTHER, François COUNILLON, Hanne SAGEN, Cecilie HANSEN, Intissar KEGHOUCHE.
Marine Core Service MY OCEAN WP18.3 – Assessment and Users Requirements for “Marine Safety” Task : Assessment and requirements for “Marine Safety”
ICEMON Presentation at IICWG-IV by Helge Tangen. Norwegian Meteorological Institute met.no Contents of presentation The ICEMON Consortium Objectives and.
NansenCloud – framework for synergistic remote sensing in the Nansen Group Anton Korosov, Morten W. Hansen Nansen Environmental and Remote Sensing Center.
Page 1© Crown copyright 2005 ECOOP WP5 overview “Forecast Production and Information Systems” ECOOP Consensus and planning meeting March 2005.
Upstream Engineering Centre Ocean predictions and the oil and gas industry - room for improvement? Colin Grant Metocean Technical Authority.
SWARP KO Bergen, 4 Feb WP4 : Satellite remote sensing of wave in ice
ECOOP Consensus Meeting, Erdemli, March 2005 ECOOP WP13: Demonstration & Evaluation of ECOOP Monitoring Forecasting and Information System  Goals:  Demonstration.
WP 7 SWARP Kickoff Meeting, 4-5 February 2014 WP7 Dissemination and exploitation Torill Hamre, Aleksander Vines and Laurent Bertino SWARP KickOff Meeting.
Large-Scale Integrating Project SEVENTH FRAMEWORK PROGRAMME THEME 1: HEALTH Optimization of Treatment and Management of Schizophrenia in Europe General.
EuroGOOS Arctic Task Team Workshop September 2006 Summary of the Arctic GOOS planning meeting Hosted jointly by Nansen Environmental and Remote.
TOPAZ4: development and plan Counillon Francois & Bertino Laurent.
NAVTOR in SWARP-project
MERSEA Remote – Sensing Ocean Portal Brest Nov 2005 WP2.6 - DIP2 Project Status < Observing Systems < Remote Sensing.
GMES - MyOcean: operational oceanography, a source of new economic and environmental services Nadia Pinardi University of Bologna and Istituto Nazionale.
Marine Core Service MyOcean WP18 & CUG Meeting September 2009, Athens, Greece Welcome Day 2.
Dr. Frank Herr Ocean Battlespace Sensing S&T Department Head Dr. Scott L. Harper Program Officer Team Lead, 322AGP Dr. Martin O. Jeffries Program Officer.
MERSEA Integrated System Exeter Nov 2005 IGST (F. Blanc) Brief Overview of Mersea
Overview and current status of the Mersea project and system Eric Dombrowsky - Mercator Océan.
The GEOSS Portfolio for Science and Technology Produced by ST Featuring: Climate: Capacity Building of Operational Oceanography and Climate Adaptation.
Marine Core Service MY OCEAN Potential contribution of Observatories to GMES Marine Core Service, MyOcean Fabrice HERNANDEZ IRD/Mercator Ocean, France.
Ocean and sea-ice data assimilation and forecasting in the TOPAZ system L. Bertino, K.A. Lisæter, I. Kegouche, S. Sandven NERSC, Bergen, Norway Arctic.
Main components of monitoring and forecasting in Arctic and sub-Arctic regions Modelling and Forecasting capacity From MERSEA IP to the Marine Core Service.
Meteorologisk Institutt met.no Operational ocean forecasting in the Arctic (met.no) Øyvind Saetra Norwegian Meteorological Institute Presented at the ArcticGOOS.
WP5: Integration & Validation IFREMER, NERSC, NIERSC, ODL, NAVTOR, NERC.
TOPAZ evaluation L. Bertino, F. Counillon, P. Sakov Mohn-Sverdrup Center/NERSC GODAE workshop, Toulouse, June 2009.
Title: Climate change impacts on Arctic economy and society Acronym: CLIMARES Coordinator: Ola M. Johannessen, Deputy Coordinator: Stein Sandven Project.
NACLIM CT1/CT3 1 st CT workshop April 2013 Hamburg (DE) Johann Jungclaus.
IICWG 5 th Science Workshop, April Sea ice modelling and data assimilation in the TOPAZ system Knut A. Lisæter and Laurent Bertino.
Introduction of the ‘SDI-EDU for regional and urban planning‘ project Karel JANECKA 1 1 University of West Bohemia, Faculty of Applied Sciences Department.
Status and plans for assimilation of satellite data in coupled ocean-ice models Jon Albretsen and Lars-Anders Breivik.
RISK AWARE TITLE : RISK – Advanced Weather forecast system to Advise on Risk Events and management ACRONYM : RISK AWARE Duration: 36 months Status: Running.
Marine Core Service MY OCEAN WP 14 Thematic Assemby Center Sea Ice and Wind.
Marine Core Service MY OCEAN WP 05 Monitoring & Forecasting Center for Arctic MFC Laurent Bertino, NERSC, Bergen, Norway.
Marine Core Service MY OCEAN Joel Dorandeu - Frederique Blanc (CLS) MyOcean System Engineering - MyOcean Information System.
Steffen M Olsen, Polar Oceanography, DMI, Copenhagen DK CT3 Hamburg 22-23/ GEOMAR (6) Mojib Latif (CT/WP lead) Wonsun Park Thomas Martin MPG (2)
Use of Unmanned Aircraft Systems (UAS) For Environmental Applications Robbie Hood, NOAA UAS Program Director NOAA Office of Oceanic and Atmospheric Research.
Henning Wehde I IMR I 5 to / Oslo / Norway 2 nd General Assembly – NIVA HQ WP 2 Strengthening regional.
The impact of the extreme Arctic sea ice conditions on weather and climate in Europe CT1/CT3 Meeting April 2013 Hamburg Lingling Suo; Yongqi Gao.
MyOcean2 WP4.4 ACTIVITIES UPDATE MyO2 ANNUAL REVIEW,CORK, 16 APRIL 2013.
Experience with ROMS for Downscaling IPCC Climate Models 2008 ROMS/TOMS European Workshop, Grenoble, 6-8 October Bjørn Ådlandsvik, Paul Budgell, Vidar.
GODAE IGST X Exeter, Nov Mercator Status 1. The system 2. Some users 3. The consortium 4. Mersea & plans
MERCATOR OCEAN French Global Ocean Monitoring and Forecasting Contribution to Arctic GOOS Pierre BAHUREL & Gilles GARRIC MERCATOR OCEAN 12 September 2006,
Sea ice modeling at met.no Keguang Wang Norwegian Meteorological Institute.
Location Erdemli Viewof the campus from the sea.
MyOcean2 First Annual Meeting – April 2013 WP 06 MONITORING & FORECASTING CENTRE for ARCTIC Laurent Bertino, NERSC MyOcean2 First Annual Meeting.
The review for 2007 and how to address it in annual report for 2008 EU FP6 Integrated Project CARBOOCEAN ”Marine carbon sources and sinks assessment” 4.
EuroGOOS Arctic Task Team Workshop September 2006 Satellite data portals for Arctic monitoring Stein Sandven Nansen Environmental and Remote Sensing.
1 Marine EnviRonment and Security for Europe Area MERSEA FP VI Integrated Project (SPACE) Contribution to GMES, GODAE, INSPIRE SeaSearch – Limassol May.
Mohn-Sverdrup Inauguration, Bergen, October 20, 2004 Development of a European system for operational monitoring and forecasting.
The Mohn-Sverdrup Center’s planned scientific program by Ola M. Johannessen, Laurent Bertino and Geir Evensen Opening 20th of October 2004.
Mohn-Sverdrup Inauguration Seminar, 20 October 2004 Copyright 20©02, NERSC/lhp Monitoring the Norwegian Coastal Zone Environment by Johnny A. Johannessen.
European Coastal-Shelf Sea Operational Monitoring and Forecasting System WP8 Model validation and inter-comparison.
Ocean Monitoring and Forecasting A Commercial Perspective Dr Ralph Rayner Ocean Numerics/Fugro GEOS.
Monitoring of Sea Ice in the Arctic (ICEMON) Stein Sandven Research director Polar and Environmental Remote Sensing Group 20 October.
In order to accurately estimate polar air/sea fluxes, sea ice drift and then ocean circulation, global ocean models should make use of ice edge, sea ice.
Norwegian Marine Data Centre contributions from Nansen Environmental and Remote Sensing Center Lasse H. Pettersson.
INTAROS – Integrated Arctic Observation System
TOPAZ monitoring and forecasting system
Ships and Waves Reaching Polar regions
ESS.VIP ADMIN Sorina Vâju.
Presentation transcript:

SWARP: Ships and Waves Reaching Polar regions Laurent Bertino, Timothy Williams

 Nansen Environment and Remote Sensing Center, Bergen, Norway Contract number 607476

Objectives As of today, there is no forecasting service in GMES that is valid for the gray zone where waves-in-ice processes dominate. Aim: Filling the gaps existing in the GMES services with respect to waves in sea ice 1) extending the validity of wave and sea ice forecasting systems in the marginal ice zone, 2) developing remote sensing methods for routine monitoring of combined risks of waves and ice

SWARP Partnership

Work Packages NERSC IFREMER NERC ODL NERSC NAVTOR NERSC

TOPAZ - North Atlantic and Arctic Oceans 11 – 16 km resolution (800 × 880) 28 hybrid vertical levels Fram Strait 3.5 km resolution (410 × 320) Barents and Kara Sea 5.0 km resolution (510 × 450) TOPAZ is the official European system for monitoring and forecasting the Arctic. It is exploited operationally at met.no http://www.myocean.eu.org

OceanDataLab, NIERSC, Ifremer, NERSC Model setup Tides (FES2004) Topaz4 NA & AO Nesting: Ocean and Ice myocean.met.no Boundary Conditions Ocean and Sea Ice Model (EVP + MIZ) 2-3 days Sea Ice Forecast (3 days EVP+MIZ web) (2 days WIM wave data) Rivers (ERAI + TRIP05) Atmosphere (ECMWFR) NB! Today only EVP+MIZ on 3 day forecast on webpage, WIM module only 2 days wave data WIM module (Waves-in-Ice) Validation OceanDataLab, NIERSC, Ifremer, NERSC WW3 Ifremer.fr Nesting Forcing Forecast Models Validation

Project schedule at a glance Mo 1-12: Developments Models Remote sensing methods Mo 13-24: Validation Integration in NAVTOR’s NavPlanner Mo 25-36: Demonstration to users Mo 30: Service launch Mo 36: Final project meeting

Dissemination plan (WP7) Web sites Data service http://swarp.nersc.no http://bit.ly/15k2FDW Short movie Interviews this week Animations Scenes from (previous) research cruises

Practical information Soon: a SWARP website with internal area Sharing presentations Events, news … A SWARP logo (suggestions?) How to acknowledge the project EU FP7 logo on the first slide of your presentations Grant number 607476 acknowledged in publication Consortium agreement: status Inputs from NERC, UO, NIERSC, ODL, NERSC Waiting for IFREMER, ISMER, NAVTOR Issues about the text? (IPR, …)

Finances SWARP has 3 reporting periods End of January 2015, 2016 and 2017 Use of EU online reporting tools (Emdesk, Force)