OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS PROJECT OVERVIEW.

Slides:



Advertisements
Similar presentations
Objectives to improve citizens awareness and comfort industrial competitiveness efficiency of public administrations by enhancing and supporting the use,
Advertisements

Corridors Herald Ruijters, Head of Unit for Trans European Network, DG Mobility and Transport Brussels, 29 November 2012.
Epractice Communities PIKE Workshop, Brussels, 24 September 2009
DELOS Highlights COSTANTINO THANOS ITALIAN NATIONAL RESEARCH COUNCIL.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Large-scale integrating projects (IPs)
A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission WP 1: Specification and evaluation.
CIRAS PROJECT OVERVIEW
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS OPTIRAIL: “Project Overview” Technical meeting information. 1.What it was thought to exist 2.What it really.
1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS WP1: “In depth analysis of maintenance requirements for a Smart maintenance system”
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Click to add title Elygrid Project ( Grant Agreement nº ) Pablo Marcuello Foundation for the Development of New Hydrogen Technologies in Aragon.
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS WP5: “Integration and Usability validation of models”
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS Overview of WP3: “Tool conceptual design” Task 3.1: Analysis of ICT systems regarding railways domain.
1 23/05/2015 Networking Research Infrastructure NCPs National Hellenic Research Foundation (EKT/NHRF) Project Monitoring & Coordination Unit EuroRIs-NET.
Secure European Common Information Space for the Interoperability of First Responders and Police Authorities This project has received funding from the.
EU efforts aimed to facilitate and accelerate the adoption of Advanced Manufacturing in Europe Dr Nikos Pantalos, European Commission ENTR-B3 Innovation.
Robust and affordable process control technologies for improving standards and optimising industrial operations Pau Puigdollers Project Coordinator.
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS Overview of WP2: “Analysis of the transferability of tools”
Linked2Safety Project (FP7-ICT – 5.3) A NEXT-GENERATION, SECURE LINKED DATA MEDICAL INFORMATION SPACE FOR SEMANTICALLY-INTERCONNECTING ELECTRONIC.
EFRTC welcome & presentation EC project, AUTOMAIN workshop, Paris, 4 th October 2012 Imrich Korpanec, EFRTC Secretary General.
1 Prof. Dr. Albert Veenstra Scientific director Dinalog (NL)
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
Project Presentation.
Project ManagementDay 1 in the pm Project Management (PM) Structures.
Andrea Ricci - ISIS Brussels, 12 April 2012 Smart Grids: Overview of the study and main challenges 1.
NCP Infoday, Brussels, 23 June 2010 NCP Infoday ICT for Mobility Future ICT Work Programmes Helen Köpman ICT for Transport European Commission Directorate-General.
JEMMA: an open platform for a connected Smart Grid Gateway GRUPPO TELECOM ITALIA MAS2TERING Smart Grid Workshop Brussels, September Strategy &
CAST Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework Programme.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
Transport Enhancing TEN-T funding Pawel Stelmaszczyk Special Envoy for European Mobility Network DG MOVE Warsaw, 18 December 2013.
Network of Excellence in Internet Science Network of Excellence in Internet Science (EINS) 1 st REVIEW Brussels, 12th April 2013 FP7-ICT
Regional Dimension of the 7th Framework Programme « RESEARCH POTENTIAL » « CAPACITIES » SPECIFIC PROGRAMME Louis BELLEMIN.
Warszawa 18 luty th Framework Programme NMP - 2nd Calls Integrated Projects for SMEs Hervé Péro, Christophe Lesniak DG Research.
SocialCar a Horizon 2020 project
EUROPEAN COMMISSION EUROPEAN UNION IPA 2010 National Programme Bosnia and Herzegovina EU Delegation to Bosnia and Herzegovina Donor Coordination Forum.
TMALL 0141 Presentation v 1.0 Asset Management Bo Olsson Bucharest October 7th, 2015.
ERINHA: Framework for the biological high containment research infrastructure STOA – AVIESAN Workshop June 19th 2012, European Parliament, Brussels.
WP4 – Cloud Platform & Provisioning Technical Review Period 1 This document produced by Members of the Helix Nebula consortium is licensed under a Creative.
1FK/WSMAY2000 European Commission Information Society DG FROM THE 4TH TO THE 5TH FP Fotis Karamitsos European Commission DG INFSO/B/5.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
FOSTERING INDUSTRIAL SYMBIOSIS FOR A SUSTAINABLE RESOURCE INTENSIVE INDUSTRY ACROSS THE EXTENDED CONSTRUCTION VALUE CHAIN This project has received funding.
1 6/11/2016 INSTITUTE OF INFORMATION AND COMMUNICATION TECHNOLOGIES BULGARIAN ACADEMY OF SCIENCE AComIn: Advanced Computing.
FLEX - FIRE LTE TESTBEDS FOR OPEN EXPERIMENTATION PROJECT OVERVIEW Nikos Makris, University of Thessaly (UTH) Contract number: Starting date: 1/1/2014.
Eric Peirano, Ph.D., TECHNOFI, COO
OrbEEt Project Introduction <Location>, <Date> Presenter
FISSAC Project Françoise Bonnet Secretary General, ACR+
Eric Peirano, Ph.D., TECHNOFI, COO
UNISEC Universal Influenza Vaccines Secured
Regional Research-driven clusters as a tool for strenghthening regional economic development: the FP7 Regions of Knowledge Programme and its synergies.
Enabling multi-modality and efficient freight logistics
Secure European Common Information Space for the Interoperability of First Responders and Police Authorities This project has received funding from the.
HOLISDER Integrating Real-Intelligence in Energy Management Systems enabling Holistic Demand Response Optimization in Buildings and Districts Project presentation.
Aim - Methodology - Results
Coordination : DECHEMA
Research & Innovation Action Overview of the Project
ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
Strategy for statistical cooperation with the enlargement countries 2014 – 2020 MGSC March 2014 Point 3.1 of the Agenda Ferenc Gálik.
The quintessence of the Resilience Assessment Methodology in the SmartResilience project Meeting with Project Officer Brussels, March 9, 2017 A. Jovanović,
AMICI WP1 – Management, coordination and dissemination
ESS.VIP ADMIN Sorina Vâju.
Assessment of Quality in Statistics GLOBAL ASSESSMENTS, PEER REVIEWS AND SECTOR REVIEWS IN THE ENLARGEMENT AND ENP COUNTRIES Mirela Kadic, Project Manager.
Security for Safety: Enabling Digitalization of Railway Systems
Directorate General Information Society & Media
CIS progress June-November 2011: main highlights
Conclusions The Western Balkans are committed to continuing the work of the Steering Platform for aligning policies and exchanging best practices at regional.
EURELECTRIC transparency requirements
Juan Gonzalez eGovernment & CIP operations
Harmoni-CA initiative
KICK-OFF Overview and thematic approach 19th of June 2017
Presentation transcript:

OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS PROJECT OVERVIEW

OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS PROJECT NUMBER: Project Acronym: OPTIRAIL. GRANT AGREEMENT Nº: SCP2-GA OPTIRAIL. PROJECT TITLE: “DEVELOPMENT OF A SMART FRAMEWORK BASED ON KNOWLEDGE TO SUPPORT INFRASTRUCTURE MAINTENANCE DECISIONS IN RAILWAY CORRIDORS”. Starting date: 01/10/2012. Duration in months: 36. Call (part) identifier: FP7-SST-2012-RTD-1. Estimated costs: 3,916, € Requested EU contribution: 2,700, € PROJECT NUMBER: Project Acronym: OPTIRAIL. GRANT AGREEMENT Nº: SCP2-GA OPTIRAIL. PROJECT TITLE: “DEVELOPMENT OF A SMART FRAMEWORK BASED ON KNOWLEDGE TO SUPPORT INFRASTRUCTURE MAINTENANCE DECISIONS IN RAILWAY CORRIDORS”. Starting date: 01/10/2012. Duration in months: 36. Call (part) identifier: FP7-SST-2012-RTD-1. Estimated costs: 3,916, € Requested EU contribution: 2,700, €

OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS The general objective of Optiral project is to develop new smart tools, based on Fuzzy and Computational Intelligent techniques, that will help to optimize railway maintenance operation ensuring higher railway availability, better cross-border coordination and improved efficiency, obtaining higher levels of safety and service in railway infrastructures.

OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS

SPECIFIC OBJETIVES Analyses the specification and requirements Analyses the transferability from other sectors Fuzzy logic Integration in existing maintenance platforms and ICT systems Lab Validate Pilot test. Synergies between the cross-border and disseminate. OPERATIONAL OBJETIVES Generation of bases of knowledge on regulations, ICT technologies. Characterization of the main maintenance tasks and their impact from different points of view. Development of models of behaviour and evolution of individual components and the whole infrastructure. Development of models of detection and classification of events that affect the infrastructure. Development of computational models of decision making for railway maintenance Development of multi-criteria optimal planning mode. Achievements In progress

OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS Achievements. Deeper knowledge about the European railtracks and their maintenance. Knowledge about how the maintenence is done in other critical sector. Which are and how are the ICT systems used by the Railway Managers. Open new altenatives for using, differents and new techniques applied to rail domain (CI, Fuzzy logic,…..). New method to resolve alignment problems. Development of models of behavior. To highlight how are the data stored and how are their quality.

OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS