CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.

Slides:



Advertisements
Similar presentations
ENGINEERING DESIGN OF RF STRUCTURES
Advertisements

CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Design of Standing-Wave Accelerator Structure
TMM of the CLIC Two-Beam Module T0 in the LAB – Proceedings to structural FEA Riku Raatikainen
Influence of the Gravity, Vacuum and RF on CLIC Module T0 Behavior R. Raatikainen.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
2nd CLIC Advisory Committee (CLIC-ACE), CERN January 2008 Introduction to the CLIC Power Extraction and Transfer Structure (PETS) Design. I. Syratchev.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Agenda : CLIC Civil Engineering and Services (CES) WG.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
Cost Model including Civil Engineering and Conventional Facilities Hans-H. Braun, CLIC ACE, June 20, 2007  Cost model goals  Methodology  Scaling assumptions.
CTC, Outcome from Two-beam Module Review on15/ G. Riddone,
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
TBTS Test Program & Schedule G. Riddone
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
CLIC meeting CLIC module status G. Riddone on behalf of the CLIC Module WG,
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
Risto Nousiainen, CLIC workshop ” Technical Issues, Integration & Cost ” working group Progress on Study of Module Cooling Risto Nousiainen.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
FP7: EuCARD after a year of preparation… A.Jeremie.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
LCWS11 WG4 Fully featured accelerating structure engineering design
CLIC Parameter Working Group Two Beam Module Design
Update on the DB Girders FE Analyses
CLIC Civil Engineering & Infrastructure Working Group Meeting
CLIC module working group
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Thermal-Structural Finite Element Analysis of CLIC module T0#2
CLEX* Status and Plans CTF3 complex CLEX
The path to a new CLIC main-linac module
Have a chance to operate your own beam at CERN
12 GHz High Power RF components requirements for CEA activities
List of changes and improvements for the next generation CLIC module
Installation plan for LAB modules
LCWS 2017 – 26th October C. Rossi
Advanced Research Electron Accelerator Laboratory
Thermal test (lab modules)
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on behalf of the CMWG,

Content  Introduction  Module layout and types  Main requirements  Baseline design  System integration and critical issues  Module milestones  Conclusions G. Riddone, ACE09, 27/05/2009 2

3 CLIC 3TeV Per linac: Module: Accelerating structures: 71406PETS: MB quadrupoles: 1996DB quadrupoles: Per linac: Module: Accelerating structures: 71406PETS: MB quadrupoles: 1996DB quadrupoles: 20920

What is the two-beam module? G. Riddone, ACE09, 27/05/20094 Two-beam module (main + drive beams) Two-beam module (main + drive beams) Strong interaction with: - Beam physics WG (stabilization/alignment) - CES WG (tunnel integration) - MPO WG (cooling system) - C&S WG (major cost driver) Strong interaction with: - Beam physics WG (stabilization/alignment) - CES WG (tunnel integration) - MPO WG (cooling system) - C&S WG (major cost driver) Vacuum system RF system Beam instrumentation system Magnet system Magnet power system Supporting system Stabilization system Alignment system Beam feedback system Cooling system Assembly, Transport and Installation Accelerating structures PETS BPM WFM MB quadrupoles DB quadrupoles A fundamental element of the CLIC concept is two-beam acceleration, where RF power is extracted from a high-current and low- energy beam in order to accelerate the low- current main beam to high energy.

Module Baseline Definition G. Riddone, ACE09, 27/05/ filling factor optimization  higher efficiency RF constraints and beam dynamics constraints Definition of technical requirements and design (also based on validation). Module design and system integration Baseline for each of the technical system Alternatives are also studied with the aim of improving performance and/or reduce cost Alternatives

Module types and numbers G. Riddone, ACE09, 27/05/20096 Type 0 Total per module 8 accelerating structures 8 wakefield monitors 4 PETS 2 DB quadrupoles 2 DB BPM Total per linac 8374 standard modules Total per module 8 accelerating structures 8 wakefield monitors 4 PETS 2 DB quadrupoles 2 DB BPM Total per linac 8374 standard modules DB MB

Module types and numbers G. Riddone, ACE09, 27/05/2009 Total per linac Quadrupole type 1: 154 Quadrupole type 2: 634 Quadrupole type 3: 477 Quadrupole type 4: 731 Other modules - modules in the damping region (no structures) - modules with dedicated instrumentation - modules with dedicated vacuum equipment - … Total per linac Quadrupole type 1: 154 Quadrupole type 2: 634 Quadrupole type 3: 477 Quadrupole type 4: 731 Other modules - modules in the damping region (no structures) - modules with dedicated instrumentation - modules with dedicated vacuum equipment - … 7 Type 3 Type 1 Type 2 Type 4

Module type 1 G. Riddone, ACE09, 27/05/20098 All 3D models made by A. Samoshkin

Module type 1 views G. Riddone, ACE09, 27/05/20099

Requirements and baseline G. Riddone, ACE09, 27/05/ Some requirements  accelerating structure pre-alignment transverse tolerance 14 um at 1  (shape accuracy for acc. structures: 5 um)  PETS pre-alignment transverse tolerance 30 um at 1  (shape accuracy for PETS: 15 um)  Main beam quadrupole:  Pre-alignment transverse tolerance 17 um at 1   Stabilization (values at 1  ):  1 nm > 1 Hz in vertical direction  5 nm > 1 Hz in horizontal direction  Module power dissipation : 7.7 kW (average) (~ 600 W per ac. structure)  Vacuum requirement: few nTorr Temperature stabilization for any operation mode is an important issue

Requirements and baseline G. Riddone, ACE09, 27/05/ Baseline  Accelerating structure: CLIC G (100 mV/m, L = 230 mm, aperture ~ 5 mm)  PETS: CLIC note 764 (6.5 MV/m, L=310 mm, aperture 23 mm)  1 PETS powering 2 accelerating structures  Accelerating structures and PETS + DB Q on girders  Girder end supports  cradles mechanically attached to a girder and linked by rods to the adjacent one: snake-system adopted (DB: 100 A, MB: minimization of wakefields, validation at 30 GHz in CTF2)  Separate girders for main and drive beam  possibility to align DB quadrupole separate from accelerating structures  Separate support for MB Q and its BPM  MB Q and BPM rigidly mechanically connected  Common actuators/devices for stabilization and beam-based feedback systems

Interaction among technical systems G. Riddone, ACE09, 27/05/  Technical system design is not an isolated activity, as boundary conditions shall be defined together with other systems and module integration Some examples  supporting system  to be compatible with cooling, alignment and stabilization systems  compatibility of MB Q supporting system design with stabilization and alignment  coupling between girders, coupling of stabilization with beam-based feedback,…  quadrupople design  to be compatible with stabilization system (stabilization of the magnetic axis) and BPM design  cooling system  to be compatible with RF requirements as well as supporting and stabilization system (cooling induced vibrations)  vacuum system  to be compatible with RF requirements

Integration of supporting, alignment and stabilization G. Riddone, ACE09, 27/05/ Continuity between girders All MB girders have the same length MB Q support passes over the MB girder MB Q beam pipe and AS beam pipe are coupled via bellows CTF2

Quadrupole support (alternative) G. Riddone, ACE09, 27/05/ No full continuity between MB girders (increasing of align. cost) MB girder length changes as function of module type Beam height lowered MB Q beam pipe and AS beam pipe are coupled via bellows No girder underneath MB Q MBQ support simplified

PETS and accelerating structures G. Riddone, ACE09, 27/05/  PETS (CLIC note 764)  Structure (8 octants) with “compact” couplers  Minitank for structure  On-off mechanism (20 msec OFF, 20 sec ON)  Cooling circuits (size for 1% beam loss)  Vacuum system  Interconnection to BPM  Minitank support MINI-TANK SUPPORT COOLING TUBE ON-OFF MECHANISM SPACE RESERVED FOR VACUUM SYSTEM WAVEGUIDE TO AS PETS - BPM INTERCONNECTION

PETS and accelerating structures G. Riddone, ACE09, 27/05/  Acc. structure (CLIC G, D: 140 mm)  Structure (brazed disks) with “compact” coupler  Wakefield monitor (1 per AS)  Cooling circuits  Vacuum system  Interconnection to MB Q  Structure support  Output waveguide with RF components (eg. loads) WFM SUPPORT VAC ION PUMP SPACE RESERVED FOR VAC SYSTEM WAVEGUIDE TO AS COOLING TUBE LOAD CMF SPLITTER A S

RF distribution network (from PETS to AS) G. Riddone, ACE09, 27/05/2009  Beam axis: 650 mm  PETS and accelerating structures are connected via waveguides and choke mode flanges to guarantee flexibility  choke mode flanges allows the power transmission without electrical contact between waveguides. This device shall be flexible in order to permit independent alignment of two waveguides.  PETS on-off mechanism and RF components to be integrated  Waveguide length optimization and routing based on losses, phase advance and RF to beam timing considerations 17

Tunnel integration G. Riddone, ACE09, 27/05/ The principle of overhead lifting and vertical lowering fits with the tunnel integration (including survey space reservation) Clear interconnection plane requirement is being included in module integration design work  space for inter-girder connection: 30 mm Transport restraints and lift points have started to be considered in module integration design work Transport and installation have to be considered in the early stage of the design Study in collaboration with CES WG Module design has a strong impact on tunnel dimensions

Some milestones G. Riddone, ACE09, 27/05/  Module review scheduled in sep 2009:  Present the integration issues  Review the baseline design for technical systems  Stimulate work on alternative design for selected technical systems  Identify the necessary R&D and engineering efforts for the completion of the CDR possibly prepare milestone, cost estimate, manpower requirements  CLIC workshop (oct 2009): recommendations from the module review will be reported together with the action plan  Module baseline design: ready for CDR (mid 2010)  Test modules in CLEX ( ) [includes FP7 activities]: design, procurement and testing of “quasi” CLIC Modules: first module ready in 2011

Conclusions G. Riddone, ACE09, 27/05/2009  The Module WG is a forum where technical experts meet and exchange their requirements and technical solutions  Interaction with several other working groups is mandatory (such as beam physics, CES, cost and schedule)  Module design and integration evolves in parallel to the definition of technical system (some of them being part of the list of critical items, such as high-power rf structure) and specifies their boundary conditions and some of basic parameters  The Module allows for identifying areas needing dedicated study and design  For each technical system, a baseline is being defined and will be reviewed at the module review.  Some integration issues:  Supporting/alignment/stabilisation systems  Structures with all technical systems  Interconnections (beam-beam, inter-girder, intra-girder)  Module thermo-mechanical behavior under all operation conditions has to be simulated (expected first results for the module review)   21 km x 2 are filled with modules  major cost driver  We are really confident we will have the baseline module design ready or the CDR 20

EXTRA SLIDES

Module type 0 G. Riddone, ACE09, 27/05/200922

Module with tank configuration G. Riddone, ACE09, 27/05/200923

Integration of alignment, stabilisation and feedback systems G. Riddone, ACE09, 27/05/200924

G. Riddone, ACE09, 27/05/ cern.ch Stabilization (present config.) A possible solution for MB quad fine alignment and stabilization. Integration of MB Quad support. Integration of MB Quad support. 10

CLIC module relevant parameters G. Riddone, ACE09, 27/05/2009 Module design based on latest CLIC parameters Total per linac Modules: Accelerating structures: PETS: MB quadrupoles: 1996 DB quadrupoles: BPM: WFM: Total per linac Modules: Accelerating structures: PETS: MB quadrupoles: 1996 DB quadrupoles: BPM: WFM:

Vacuum system G. Riddone, ACE09, 27/05/2009 Requirements: 5·10 -9 mbar  Several configurations have been studied depending on structure technologies and design  Accelerating structures made in quadrant or in disks  Structure sealed or mounted inside a vacuum tank 27  Two configurations have been studied  In configuration #2, the ACS are made of discs all brazed together forming a sealed structure, and the PETS are made of octants and “mini-tanks” around the bars  adopted as baseline  In configuration #1, the accelerating structures are formed by four high- speed milled bars which are then clamped together, and the PETS bars and couplers are all clamped and housed in a vacuum tank.  alternative

WFM G. Riddone, ACE09, 27/05/ WFM integrated in acc. structure: RMS position error 5 μ m (~ WFM) WFM integrated in acc. structure: RMS position error 5 μ m (~ WFM)

BPM G. Riddone, ACE09, 27/05/ Limited space for BPM integration: 60 to 100 mm -1 BPM per Q Drive beam: ~ devices Main beam: ~ devices Limited space for BPM integration: 60 to 100 mm -1 BPM per Q Drive beam: ~ devices Main beam: ~ devices

Main objectives of the test module  Accelerating structure (ACS) alignment on girder using probe beam  Wakefield monitor (WFM) performance in low and high power conditions (and after a breakdown)  Integration of different sub-systems:, i.e. to simultaneously satisfy requirements of highest possible gradient, power handling, tight mechanical tolerances and heavy HOM damping  Alignment and stabilization systems in a dynamic accelerator environment  RF network phase stability especially independent alignment of linacs  Vacuum system performance especially dynamics with rf  Cooling system especially dynamics due to beam loss and power flow changes  Validation of assembly, transport, activation, maintenance etc. 30

Task 2: Normal Conducting High Gradient Cavities  Building on the success of CTF3 and complementing it, the goal of this task is to optimize CTF3 and its use towards  cost- and performance optimized accelerating structures and their integration in CLIC modules. Together with all subsystems (vacuum, cooling, alignment,..). This also requires  better modeling of breakdown and  better suppression of HOM’s,  experimental verification  Partners: CIEMAT, University of Manchester (CI), HIP/University Helsinki, Uppsala University, CERN (coordination)  Estimated total: 2.45 M€, 22 FTE  This task is complementary to the “module implementation” which is financed 100% by CERN (and other collaborators) and not part of this proposal  Also note that the CLIC main beam accelerator structures are not explicitly part of this program. GR, BE/RF, 3/27/

STANDARD & TYPE 1 CLIC MODULES IN CLEX (2010 mm mm = 4020 mm) Ph.3: Type 0 Ph.4 : TYPE 1