Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.

Slides:



Advertisements
Similar presentations
Liquid Hydrogen Absorber
Advertisements

Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
MICE LH2 Absorber Instrumentation - What is necessary/ desirable? (physics calibration) Temperature inside the the absorber Temperature inside the absorber.
MuCool Test Facility Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 12/13 August 2002.
Internal Seismic Isolation (ISC) Overview Report for the August CDS meeting Ben Abbott Caltech.
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
1. Commissioning of cryogenic crates using Mobile Test Bench 1. The Mobile Test Bench 2. Cryogenics crates and equipment – types of transducers and actuators.
Midterm Review MBS 2006 MP Electronics, Basic Concept  Two modules:  Probe module  Surface module  The surface module is replaced by the.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
LabView Users Group Meeting June 20 th, 2006 Process Control Using Compact Field Point/Labview Real-time Michael Tockstein Microelectronics Technology.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
DESIGN OF THE HATCH OF THE INSTRUMENT BOOTH OF EUSO-BALLOON version v1.2 Writer : SYLVIE DAGORET- CAMPAGNE Final tests and Health tests1
1 ATF2 - IP Chamber Design and manufacturing of Chamber with high precision piezo actuators for high resolution BPMs Status / progress report – 26 June.
7526A Precision Temperature/Pressure Process Calibrator
V-Series Panel Hardware, Installation & maintenance.
Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002.
Readout Electronics: SIDECAR ASIC Hardware
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Raymond Giron, Adam Bahr, George Asbeck.  Originally developed by HP in the 1960’s  Wanted an easier way to interface the instruments and controllers.
New IP chamber for ATF2 goal 2 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4.
Absorber Production Status Contents (1)MICE absorber design/status (2)MICE absorber instrumentation (3)Schedule (4)Summary Sasanqua at KEK on 13-DEC,’09.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
CLEX TBM T0 Cooling system Progress Report 1 V. Soldatov, A. Vamvakas, BE-RF
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Ports and Connectors By Karina Hackett Overview: Ports are also known as sockets, and are located at the back of a system unit. Connectors are the parts.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
CAPS FID Interface Board Midterm Presentation I Odai Ali James Owens Joshua Roybal.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Logging and Alarms Apparatus monitored through GPIB – LakeShore temperatures – Agilent power supplies – AMI liquid level monitor Apparatus monitored through.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
NEW RMC Rack Multi Control.
ProtoDUNE SP – Slow control temperature gradient monitor
National Centre for Nuclear Research, Poland
Brooks Expert Support Tool (BEST) Software
Installation of the T600 at Fermilab
He Plant, LN2 Systems and Commissioing
IT-4189 Supply and installation of a cryogenic distribution system
ECAL Front-end development
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
ProtoDUNE SP – Slow control temperature readout setup test
Teleconference ACS – FREIA 18th April 2017
Christian Veelken last updated 11/09/06
Teleconference ACS – FREIA 10th May 2017
LSG Capabilities LSG nomenclature: WV - Work Volume AL - Air Lock
INSTRUMENT CONTROLLER OVERVIEW
MuCool Test Facility Instrumentation Update
SNS PPU Cryomodule Instrumentation
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Command and Data Handling
Single Detector Design
Requirements Overview
SNS PPU Cryomodule Instrumentation
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical wiring for piezo movers

Overview : the way to connect from IP chamber to control room : - piezo movers (power supply and strain gages readout), - temperature probes. Overview by flange : the wiring on the flange : - inside the IP chamber, - outside. Detail for the 2 flanges : an example of a equipped flange : - vacuum connectors, - equipped flange with feedthroughs, - external connectors and cables. Overview of the existing at LAL : LAL wiring uses to perform tests of piezo movers : - piezo movers, - movers command box, - inputs / outputs electronics, - laptop with NI Labview software. Existing ADC / DAC : equipment bought and used by LAL : - National Instruments (NI) modules, The LAL need at KEK : necessary equipment to connect LAL electronics to KEK control room : - an example given by National Instruments (NI) modules. Conclusion 2 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Summary Electrical wiring for piezo movers

4 movers command box (Cedrat) Analog inputs & outputs Connecting cable for mover (25 m) DAC ADC 16 bits / +-10 v 24 bits / +-10 v Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, DAC ADC 16 bits / +-10 v 24 bits / +-10 v Linking box 4 movers command box (PI) Analog inputs & outputs PI movers (BPM3) Cedrat movers (BPM1&2) Linking box Overview Electrical wiring for piezo movers temp probe* (BPM3) temp probe* (BPM1&2) T. probe* Connecting cable for Temp probe (25 m) 4 wires * To be defined Link to control room*

Φ252 mm flange* *Not supplied by LAL Inside ip chamber 6 E -8 mbar Outside ip chamber (air pressure) Vacuum removable connectors 4 Electrical feedthroughs* Outside removable connectors 3 Connecting cables (25 m) Analog inputs & outputs Linking box 4 movers command box Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Overview per flange Electrical wiring for piezo movers 4 Temp probe (4 wires) 1 Connecting cable (25 m) 4 movers 1 Temp probe

Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Detail for the 2 flanges Electrical wiring for piezo movers 5 P.Cornebise SERDI-LAL Thanks to 2x4 Connectors subD9 female (Ceramic UHV) Small crimp pins 2x4 Connectors subD9 female 2x4 metal covers subD9 2x1 flange with 4 feedthroughs subD9 male for each flange (feedthoughs position on the flange surface : KEK discretion) Inside ip chamber 6 E -8 mbar Outside ip chamber (air pressure) KEK supply Strain gauges connectors Piezo power supply connectors Temp probe connectors 2x 4x25m ‘7 S/FTP’ cable

4 movers command box (Cedrat) Analog inputs & outputs DAC ADC 16 bits / +-10 v 24 bits / +-10 v Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, DAC ADC 16 bits / +-10 v 24 bits / +-10 v 4 movers command box (PI) Analog inputs & outputs Overview of the existing at LAL Electrical wiring for piezo movers USB link Labview interface PI movers (BPM3) Welding wire to wire Cedrat movers (BPM1&2) 2 wires (piezo power supply) 4 wires (strain gauges readout)

PI mover (x4) 4 wires (strain gauges readout) 2 wires (piezo power supply) Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical wiring for piezo movers 7 Existing ADC / DAC at LAL DAC module 16 bits / +-10V (output x4) NI 9239 NI 9263 ADC module 24 bits / +-10V (input x4) Cedrat mover (x4) 4 wires (strain gauges readout) 2 wires (piezo power supply) DAC module 16 bits / +-10V (output x4) ADC module 24 bits / +-10V (input x4) NI 9239 NI 9263 Rack for 4 modules NI cDAQ 9174 USB link for Labview interface

Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical wiring for piezo movers 8 The LAL need at KEK Ethernet / RS / … link to connect with KEK control room Output : DAC piezo power supply 16 bits / +-10Vc (input x4) Input : ADC strain gauges readout 24 bits / +-10V (input x4) x2 Input : ADC Temp probe readout (PT100 / PT1000) (input x4) x1 These electronic modules must be connected to the control room devices at KEK. No preference for National Instruments (NI), Keyence… For example

Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical wiring for piezo movers 9 Conclusion Distance from IP chamber (warm zone) to movers / temp probes electronics (cold zone) : - 25 m. Temperature probes : - need inside IP chamber ? How many (1 for BPM1&2 / 1 for BPM3) ? - heating wire wound around the chamber to maintain constant the temperature ? KEK ? Flanges supply : - flanges with feedthroughs to be supplied by KEK ? - subD9 male feedthrough as purposed by LAL ? Electronics to connect to control room devices : - LAL supply with NI modules and Labview software ? - or KEK supply with LAL specs ? - USB / RS 485 / ethernet link ?