once the Team has Completed the 4th Why

Slides:



Advertisements
Similar presentations
P roblem S olving I nnovator Solving Tomorrows Problems Today IS - IS NOT / COMPARITIVE ANALYSIS motivates deliberate thinking about the Boundaries of.
Advertisements

RCM-Tool v1.0 Demo Performing Welcome to the RCM-Tool RCM-Tool
P roblem S olving I nnovator Solving Tomorrows Problems Today The 1 st Why can be formed once the Team has Brainstormed for Potential Causes The 1 st.
P roblem S olving I nnovator Solving Tomorrows Problems Today Electronic Brainstorm Database Electronic Brainstorm Database Brainstorming stimulates new.
P roblem S olving I nnovator Solving Tomorrows Problems Today 4 th Why / Root Cause Cause & Effect (Fishbone) 4 th Why / Root Cause Cause & Effect (Fishbone)
P roblem S olving I nnovator Solving Tomorrows Problems Today Primary function is to identify and organize possible causes of a specific effect and then.
P roblem S olving I nnovator Solving Tomorrows Problems Today To prevent any potential defects reaching the customer, define and implement containment.
P roblem S olving I nnovator Team problem solving in a production Environment.
P roblem S olving I nnovator Solving Tomorrows Problems Today Overview of how the 5 why automatically generates an FMEA & Control Plans 5 Why - FMEA Relationship.
P roblem S olving I nnovator Solving Tomorrows Problems Today Manual Prioritisation of 1 st Why / Functions. Manual Prioritisation of 1 st Why / Functions.
P roblem S olving I nnovator Solving Tomorrows Problems Today User Help The help feature is found through out the PSI.This enables the user to gain a.
P roblem S olving I nnovator Solving Tomorrows Problems Today 3 rd Why / Failure Effect Development 3 rd Why / Failure Effect Development 3 rd Why / Failure.
P roblem S olving I nnovator Solving Tomorrows Problems Today Warnings Clear All prepares the PSI for the next problem. Clearing of D1-D3.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Failure Mode DBS & Chart Root Cause DBS Reviewing/Updating the Databases and Analysing.
Step – by – step Tutorial.  Enter Username  Enter Password  Select OK.
Building Systems Design, Inc. Editing in BSD SpecLink Edit by selecting, instead of deleting Easier and faster Makes linking both practical and useful.
Process Analysis 102 Quality: The Basic Tool Kit.
P roblem S olving I nnovator Solving Tomorrows Problems Today Identify the need and reason for the PSI. Clearly document the Opportunity Description Identify.
WebVERS Introduction The Visitor Estimation and Reporting System (VERS) program was developed as a DOS program. Several years ago the meter reading and.
P roblem S olving I nnovator Solving Tomorrows Problems Today 2 nd Why/Voting Techniques Automatic Ranking 2 nd Why/Voting Techniques Automatic Ranking.
P roblem S olving I nnovator Solving Tomorrows Problems Today 1 st Why / Function Pareto Chart 1 st Why / Function Pareto Chart Overview of Percentage.
P roblem S olving I nnovator Solving Tomorrows Problems Today 2 nd Why / Requirements Cause & Effect (Fishbone) 2 nd Why / Requirements Cause & Effect.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Benefit Description Force Field Analysis will identify the viability of Recommended.
P roblem S olving I nnovator Solving Tomorrows Problems Today The Team should Accept the PSI Innovation and develop the Team Structure & Logistics The.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Causes of a Problem can be Arranged into Independent Groups and each Group can.
ASENT_MTTR.PPT Maintainability Predictions Last revised 8/11/2005.
XP New Perspectives on Microsoft Office Access 2003, Second Edition- Tutorial 2 1 Microsoft Office Access 2003 Tutorial 2 – Creating And Maintaining A.
Popcorn Sample PFMEA: Process Flow
Creating And Maintaining A Database. 2 Learn the guidelines for designing databases When designing a database, first try to think of all the fields of.
ASENT_FMECA.PPT Failure Mode, Effects, and Criticality Analysis (FMECA) Last revised 08/14/2014.
Updating Your Profile Press F5 to begin the slide show. Slides will automatically advance. February
P roblem S olving I nnovator Solving Tomorrows Problems Today Once the Problem Profile is determined, the Process Control can be implemented correctly.
P roblem S olving I nnovator Solving Tomorrows Problems Today Problem / Improvement Confirmation Problem / Improvement Confirmation Management should.
8D Report provides a summary of the PSI
P roblem S olving I nnovator Solving Tomorrows Problems Today The Fault Tree will automatically be generated once the Team has Completed the 5 th Why.
BLC Training for Instructors Presented By: Banner Health Learning & Development Team.
P roblem S olving I nnovator Solving Tomorrows Problems Today Databases for Improvements Prevention/ Lessons Learned Prevention/ Lessons Learned Potential.
P roblem S olving I nnovator Solving Tomorrows Problems Today Before beginning, establish the parameters of the opportunity. Do this by completing the.
P roblem S olving I nnovator Solving Tomorrows Problems Today Current Situation Prevention / Detection Current Situation Prevention / Detection Analyzing.
Lesson 2 Access Lesson 2 Lesson Plans Michele Smith – North Buncombe High School, Weaverville, NC
XP New Perspectives on Microsoft Access 2002 Tutorial 21 Microsoft Access Tutorial 2 – Creating And Maintaining A Database.
Adding Documents to OnCourse. Add a Document Look for the Documents tab and click it.
P roblem S olving I nnovator Solving Tomorrows Problems Today Analysis to minimize all future negative unforeseen effects of stated PSI subject Risk Analysis.
Access Lesson 2 Lesson Plans Michele Smith – North Buncombe High School, Weaverville, NC
YLM Calendar Feed Updated 6/6/ Sign in at YLM Homepage: 2.From the horizontal menu above the YLM logo, navigate.
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
Internal Auditing and Root Cause Analysis
Click to Continue. This is the Database Start Page (The Switchboard) To turn on ‘Pop Up Help’ click the option button.
How to Use Your Committee Workspace. Click Here AFPMB Homepage.
P roblem S olving I nnovator Solving Tomorrows Problems Today Saving with a Backup insures that the work that has been done in the PSI can be recovered.
P roblem S olving I nnovator Solving Tomorrows Problems Today Actions taken refers to the actual action taken as described in the FMEA Prevention & Detection.
Log into Log into the SPORT NGIN site or create an account if this is your first time in.
SIGMA Requestor Training In this presentation we will cover : How to log a Sigma ticket How to update a ticket via the notification function How.
How do I access the disclosure form? Go to Office of Research Compliance website Click on the eCOI link under Conflict.
ASENT_RCM.PPT Reliability Centered Maintenance (RCM) Analysis Last revised 01/14/2011.
Six Sigma Greenbelt Training
Fault Trees.
Manage Call Handling Profiles
FMEA PROCESS FLOW Determine Causes/ mechanisms failure
Examples of Poor Primary Keys
Examples of Poor Primary Keys
Supplier Performance Management (SPM): Scoring and Grading
How to complete a Referral Form via “Student” tab
Editing your Video Clips with Windows Movie Maker.
Microsoft Office Access 2003
Creating and Sending Message Links
Course Competencies Tab (cont’d)
Potential Failure Mode Analysis 4th Edition
Creating and Sending Saved Messages
Presentation transcript:

once the Team has Completed the 4th Why The 5th Why can be formed once the Team has Completed the 4th Why 5th Why / Detection Development 5th Why / Detection Examples 5th Why / Detection FMEA 5th Why / Detection Cause & Effect (Fishbone)

Developing the 5th Why / Detection 5th Why / Detection Control Development Developing the 5th Why / Detection Enter the Detection Control as well as the Detection Weakness for each of the 3rd Why / Failure Modes Enter a Detection directly into the cell/select from the drop down list if previously entered. Detection Controls are automatically added to the database. To Update/Edit/View the Database: Select ‘Add-Ins’, ‘Database Rankings’ , ‘Prevention Control DBS’. With additional Pop up Aids

D4 - Developing the 5th Why / Detection …Options Examples D4 - Developing the 5th Why / Detection …Options The 5th Why defines the Detection Method of the 3rd Why / Failure Mode Option 1: The Process Sequence Example ‘VALVE MANUFACTURING’ RAW MATERIAL MACHINING TAPPING ASSEMBLY/ TEST DESIGN/ APPLICATION

D4 - Developing the 5th Why / Detection …Options Examples D4 - Developing the 5th Why / Detection …Options The 5th Why defines the Detection Method of the 3rd Why / Failure Mode Option 2: Any other logical method or sequence Example ‘BACK ACHE’ POSTURE SPINAL COLUMN MUSCLES NERVES ASSOCIATED ORGANS

Will automatically be updated 5th Why / Detection FMEA D4 – 5th Why = the Detection Will automatically be updated 5th Why / Detection RAW MATERIAL MACHINING TAPPING ASSEMBLY/ TEST DESIGN/ APPLICATION VALVE BODY ADAPTOR CUTTING FLUID SETTINGS FOREIGN MATTER VISCOSITY SWARF DIRTY CASTINGS SAND IN CASTINGS VISUAL APPEARANCE

D4 - The 5th Why / Detection will be forwarded to C&E (Fishbone) D4 - The 5th Why / Detection will be forwarded to the Cause & Effect Diagram. It will appear on the left, according to the Failure Mode you have selected. RAW MATERIAL MACHINING TAPPING ASSEMBLY/ TEST DESIGN/ APPLICATION

This completes the D4 5th Why / Detection Now start the D4 Fault Tree Analysis