WP1 –Project Management and Coordination CROPSUSTAIN KICK OFF MEETING 28 th November 2012, Agricultural Institute of Slovenia, Hacquetova ul. 17, Ljubljana.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

WP3 – Krepitev človeških in raziskovalnih potencialov: sodelovanje za prihodnost, »Mobilnost« WP3 – Reinforcing Human and research potential: collaboration.
EU – ACP PROGRAMME FOR SCIENCE AND TECHNOLOGY INNOVATIONS AND CAPACITY BUILDING (PSTICB) 9 ACP RPR 61.
WP6: Dissemination and exploitation Vladimir Meglič.
High level expert meeting to develop the Near East Regional Action Plan to Implement the Global Strategy to improve Agricultural and Rural Statistics.
THE CARIBBEAN COMMUNITY COUNCIL FOR TEACHING AND TEACHER EDUCATION Assuring Quality in the Teaching Profession Dr. Paula Mark CARICOM Task Force for Teacher.
S3 Project aim The main goal, thus expected result, of the S3 project would be to strengthen tools used for Structural Fund policies (SF), through the.
By Mohamed Al-Aawah Disaster Risk Reduction Programme UNESCO Cairo Office.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Building a Strategic Plan Illinois School Leadership Advisory Council September 11, 2014.
Oficina AproTECH de AETIC: Información y asesoramiento en la preparación de propuestas de I+D+I FP7: Project Management issues, Roles and.
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
In the Name of God, Most Gracious, Most Merciful.
Management structure and procedures KickOff Meeting ICT-AGRI 2 4 th – 5 th Februrary 2014 Niels Gøtke, Iver Thysen Jan Erpenbach, Elke Saggau.
Strengthening Nordic-Baltic educational cooperation in development of module “Supervision in social work” Dr. Jolanta Pivoriene Vice dean for projects.
PRESENTATION TO THE SELECT COMMITTEE ON LOCAL GOVERNMENT AND ADMINISTRATION Budget Briefing BRANCH: MONITORING AND EVALUATION Ms Tumi Mketi 07 May 2007.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Centre for Genetic Resources, the Netherlands Chris Kik, CGN, Wageningen, the Netherlands LEAFY VEGETABLES WP5 Coordination.
By Bankole Ebisemiju At an Intensive & Interactive workshop on Techniques for Effective & Result Oriented Annual Operation Plan November 24th 2010 Annual.
EPOCA – 11. June EPOCAConsortiumOrganisation.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
Institutional structures for Structural Funds assistance Ministry of Finance September 10, 2003.
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Initial plans for WP 4 KickOff Meeting ICT-AGRI 2.
ASA Board Membership Board Members: (vote) Four Paraguayan Citizens Four U.S. Citizens One Third-country National Ex-Officio Members: (voice but no vote)
PHARE TWINNING CONTRACT BG/2004/IB/TR/02/UE Strengthening the capacity of the Ministry of Transport to manage the Sectoral Operational Programme on Transport.
Consortium building PHOENIX Training Course Laulasmaa, Estonia
RARECARENet: how will we work together?. Information network on rare cancers Advisory Board The Coordinator (Project Management Team) Steering Committee.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
Project Procedures Start up Governance Internal Communications – Lists – documents Meeting Schedule Deliverables Cost statements.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
Eurostat/UNSD Conference on International Outreach and Coordination in National Accounts for Sustainable Development and Growth 6-8 May, Luxembourg These.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Structuring of work related competences in Chemical Engineering STRENGTH Leonardo da Vinci ToI Project ES1-LEO RESULT 7 STRENGTH Quality.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Governance.
WP3 Harmonization & Integration J. Lauterjung & WP 3 Group.
Changing the way the New Zealand Aid Programme monitors and evaluates its Aid Ingrid van Aalst Principal Evaluation Manager Development Strategy & Effectiveness.
WP7 –Evaluation. Objectives WP7 aims to assess the overall research quality and capability of KIS in order to: validate the project achievements determine.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Prof. Dr. Bernhard Plattner.
Project title Food Safety - Forming a European platform for protecting consumers against health risks Project coordinator Oddur Mar Gunnarsson Nordic Innovation.
Manfred Horr, Project Coordinator Head of Section Economic Policy and Private Sector Development German Technical Cooperation (GTZ) Kick-off workshop,
STRENGTHENING COMPETENCE IN MAKING PLAN OF SOCIO – ECONOMIC DEVELOPMENT IN PERIOD AT LOCAL LEVEL Presented by Mr. Ngo Sy Bich Vice Director Bac.
> 1 ACP S&T Grant Contract N° FED/2009/ Introducing WP6 Monitoring & Quality control Objectives, actions, procedures Dr Sarah Bracking.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
ICT Smartcities 2013 FP7-SMARTCITIES-2013 WP6 – Project Management OPTIMising the energy USe in cities with smart decision support system (OPTIMUS) Objective.
Consortium Agreement Kari-Jouko Räihä. Characteristics  Origin Basis: UNECA (Unified Network of Excellence Consortium Agreement) Terminology adapted.
FAO NEAR EAST REGIONAL OFFICE. Network definition  Near East Plant Protection Network (NEPP-NET) is a web-based integrated, multilingual regional thematic.
AMICI WP1 – Management, coordination and dissemination
Tempus Programme SHESPSS
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
Project Management M I S S I O N WP1:
AMICI WP1 – Management, coordination and dissemination
Mr. Alper GÜCÜMENGİL Head of Projects Group, TURKSTAT
Workplan and Administrative Management
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
Presentation transcript:

WP1 –Project Management and Coordination CROPSUSTAIN KICK OFF MEETING 28 th November 2012, Agricultural Institute of Slovenia, Hacquetova ul. 17, Ljubljana

Overall strategy of the work plan The strategy will be implemented through the following work packages: WP 1: Project Management and Coordination WP2: Recruitment of Human Resources WP3: Reinforcing Human and research potential: collaboration for the best WP4: Technological Modernization of Research Facilities WP5: Building Networks: ERA WP6: Dissemination and Exploitation WP7: Evaluation

Deliverables List

Management structure The management structure include: Project Coordinator, Project manager, Financial manager, WP leaders, Scientific Theme managers, Steering committee GOALS: ensuring professional and accurate management and coordination of CropSustaIn in order to fulfil all objectives of the proposal to ensure proper communication and good quality control of the work to ensure optimal involvement of all CropSustaIn actors Project Coordinator (PC): takes the overall responsibility of project management and implementation; dr. Gregor Urek

Management structure – PM, FM, WPs Project Manager (PM): is responsible for the technical implementation of the project. He will fully support the PC. PM will be in charge of the day-to-day management of the project, monitoring of work progress, quality control of the reports provided to the EC, communication with the collaborative partners; dr. Saša Širca Financial and Administrative manager (FM): FM will be responsible for the financial management of the project. FM will support PC and collaborate with PM in his reporting tasks, providing the required materials; Meta Čufar Work package leaders: each work package leader is responsible for performing the work scheduled on time and in conformity with the planed work description. The work package leader also insures that deliverables are being produced with the appropriate quality, on time and to budget;

Management structure - WPs WPWP leader WP 1: Project Management and Coordination Dr. Saša Širca WP2: Recruitment of Human Resources Doc. Dr. Gregor Urek WP3: Reinforcing Human and research potential: collaboration for the best Dr. Barbara Gerič Stare WP4: Technological Modernization of Research Facilities Dr. Irena Mavrič Pleško WP5: Building Networks: ERADr. Hans Josef Schroers WP6: Dissemination and ExploitationDoc. Dr. Vladimir Meglič WP7: EvaluationDoc. Dr. Andrej Simončič

Management structure - ST Scientific themeST manager 1: Strengthening capacities for diagnostics of quarantine and other severe plant pest and pathogen species. Doc. Dr. Mojca Viršček Marn 2: Collaboration for establishment of national reference collections for quarantine and other severe plant pests and pathogens Dr. Alenka Munda 3: Investigating methods for dealing with interactions between host plants, vectors, pests and pathogens. Dr. Polona Strajnar 4: Raising research potential on environmentally sound plant protection technologies. Dr. Kristina Uginovič 5: Transfer of knowledge for omics and bioinformatic approaches for sustainable agriculture. Dr. Jelka Šuštar Vozlič 6: Rising research potential to reduce honeybee colonies losses and to ensure sustainable beekeeping. Prof. Dr. Aleš Gregorc

Management structure KIS management team: PC, PM, FM and WP leaders – regular meetings monthly; planning & evaluating the work on the project Advisory board: PC, PM and ST leaders and the leaders of the two Interdisciplinary research programme groups at KIS – 3 meetings in the project lifetime (M12, M24 and M36); evaluation of the scientific matters Project Management Collaborative Workspace At KIS intra-net (with access via username and password only). The collaborative workspace will include the project management guidelines which set out all reporting requirements, deliverable sign-off procedures, templates for all project documents, meeting schedules and partner roles/responsibilities.

Steering Committee NameInstitutionPosition/role in the project Doc. dr. Vladimir Meglič KISKIS research programme group leader Dr. Meta Čandek-Potokar KISKIS research programme group leader Dr. Saša ŠircaKISProject manager Dr. Vivian BlokJHIScientist representing collaborative partner Dr. Per KudskAU-AGROScientist representing collaborative partner Dr. Habil. Johannes Jehle JKIScientist representing collaborative partner Mr. Gorazd Maslo Ljubljana City Hall Representative of the local community Ms. Jana ErjavecMAERepresentative of the Ministry Dr. Pablo Hirschegger Semenarna Ljubljana d.d. Representative of the industry Doc. Dr. Andrej Simončič KISThe director of KIS Doc. Dr. Gregor Urek KISProject Coordinator Four meetings: M1, M12, M24 and M42 SC is chaired by the PC and receives reports on progress The board is responsible for reviewing the research agenda; the strategic aspects of the project; responsible for the global management of the project ensuring that the project meets its objectives and that deliverables are produced on time and to budget

Financial management

PC responsible: Measuring the progress and achievements of the expected project results thru The assessment criteria Deliverables WP1 D1.1 Report on the project meetings (M 1, M6, M12, M18, M24, M36, M42) D1.2 Report from Steering committee meetings and annual conclusions of the Steering Committee (M1, M12, M24, M36) D1.3 Report on Project Management Collaborative Workspace (M 3) D1.4 Report from Advisory board (M12, M24 and M36) D1.5 Report on measuring the progress and achievements of the expected project results (M36) Communication with the Commission PM will support PC in communication on project related matters with the EC to ensure regular implementation in accordance with the contract Achievements