Quality Control and Improvement Here we will use some statistical techniques. 1.

Slides:



Advertisements
Similar presentations
Chapter 6 - Statistical Process Control
Advertisements

Control Charts for Variables
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Operations Management Statistical Process Control Supplement 6
Chapter 9A Process Capability and Statistical Quality Control
Quality Assurance (Quality Control)
Chapter 9A. Process Capability & Statistical Quality Control
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
BMM 3633 Industrial Engineering
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render Principles.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter Seventeen Statistical Quality Control GOALS When.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
Other Inventory Models 1. Continuous Review or Q System 2 The EOQ model is based on several assumptions, one being that there is a constant demand. This.
1 One Tailed Tests Here we study the hypothesis test for the mean of a population when the alternative hypothesis is an inequality.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
1 Analysis of Variance This technique is designed to test the null hypothesis that three or more group means are equal.
© 2008 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
An Inference Procedure
1 Confidence Interval for the Population Proportion.
1 Hypothesis Testing In this section I want to review a few things and then introduce hypothesis testing.
1 More about the Confidence Interval of the Population Mean.
1 Confidence Interval for the Population Mean. 2 What a way to start a section of notes – but anyway. Imagine you are at the ground level in front of.
B a c kn e x t h o m e Classification of Variables Discrete Numerical Variable A variable that produces a response that comes from a counting process.
1 The Sample Mean rule Recall we learned a variable could have a normal distribution? This was useful because then we could say approximately.
1 Confidence Interval for Population Mean The case when the population standard deviation is unknown (the more common case).
X-bar and R Control Charts
An Inference Procedure
Statistical Process Control
Elec471 Embedded Computer Systems Chapter 4, Probability and Statistics By Prof. Tim Johnson, PE Wentworth Institute of Technology Boston, MA Theory and.
Quality Control.
Operations Management
Statistical Quality Control/Statistical Process Control
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 17-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 8 Process Capability and Statistical Quality Control.
Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.
Process Capability and SPC
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 17-1 Business Statistics: A Decision-Making Approach 6 th Edition Chapter.
Process Capability and Statistical Process Control.
 Frequency Distribution is a statistical technique to explore the underlying patterns of raw data.  Preparing frequency distribution tables, we can.
Chapter 2 Describing Data.
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna 17-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
Chapter 10 Quality Control.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Statistical Process Control (SPC)
Chapter 36 Quality Engineering (Part 2) EIN 3390 Manufacturing Processes Summer A, 2012.
Irwin/McGraw-Hill © Andrew F. Siegel, 1997 and l Chapter 18 l Quality Control: Recognizing and Managing Variation.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
Inspection- “back-end quality control” BUT, Start by designing quality into the front end of the process- the design QFD (Quality Function Deployment)
Quality Control  Statistical Process Control (SPC)
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
Measurements and Their Analysis. Introduction Note that in this chapter, we are talking about multiple measurements of the same quantity Numerical analysis.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Process Capability and Statistical Quality Control.
Welcome to MM305 Unit 8 Seminar Prof. Dan Statistical Quality Control.
Describing Data Week 1 The W’s (Where do the Numbers come from?) Who: Who was measured? By Whom: Who did the measuring What: What was measured? Where:
OPSM301 Operations Management Spring 2012
Operations Management
COMPLETE BUSINESS STATISTICS
Statistical Process Control
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Statistical Process Control
Statistical Process Control (SPC)
Statistical Process Control
Statistical Process Control
Process Capability.
Basic Practice of Statistics - 3rd Edition
Basic Practice of Statistics - 3rd Edition
Presentation transcript:

Quality Control and Improvement Here we will use some statistical techniques. 1

Process Quality Control 2 Process quality control is the inspecting or testing of the product or service while it is being produced. Implementation: 1) Take a sample of output (more than 1 unit), 2) Do some figuring (we see more later), 3) If the figures are good, keep producing as you have been. If figures are bad, stop process and search for an assignable cause (the reason for the bad figures), 4) If figures are bad and an assignable cause is found – fix it and start the production process again. (It is beyond the scope of the course to not be able to find the source of the problem.)

Random Variability 3 Random variability, or common causes, is (are) going to happen in most every production process. As an example (that is not exactly like production, but has the flavor we want here), consider that I put on a pot of coffee most every day at the office. Do I put in the same amount of coffee particles and water with each pot? No! But, I do a close enough job so that from day to day the java is acceptable. The aim of process control is to find the natural random variation of the process and to make sure the production stays in this range. It is natural that I will not make coffee exactly the same every day. But I am within limits of acceptability.

Special Causes 4 Unnecessary variation, or special causes, is (are) the real problem (and are the assignable errors mentioned before). Lax procedures, untrained workers, or improper machine maintenance are examples that can be lead to too much variation in production. New faculty have to be trained to make coffee because our coffee maker here is a little more sophisticated than an at home model. New faculty may not know how many scoops to put in or not know to turn on the warmer. We straighten them out so the coffee is awesome!

Quality Control Chart 5 UCL Average or CL LCL Time or successive sample observation Quality characteristic being observed

Quality Control Chart 6 On the previous slide I have a graph. On the “x” axis you see time, or more importantly at successive time periods we take a sample and study some characteristic. On the “y” we have various concepts related to the measurement. The CL is the center line, or average will be our average of all observations up to the current sample. UCL is the upper control limit, or the maximum acceptable sample value. LCL is the lower control limit, or the minimum acceptable sample value. What I do not have in the graph, yet, are actual sample values. We will get to that.

Quality Control Chart 7 If we can assume the production process, when under control, has a normal distribution (and we will assume that here) then 99.74% of all sample means or proportions will be within 3 standard deviations from the mean. So, we make the UCL 3 standard deviations above the mean and the LCL 3 standard deviations below the mean. If the sample value obtained in a sample has a value outside the range of ± 3 standard deviations, then the process will be stopped and a search for assignable cause will be conducted.

Attribute Control 8 Sometimes our quality characteristic is measured on what is called a discrete scale. In a sample we will have n observations. On each observation we will note if a defect is present. A defect is a bad thing. In a batch or sample of n we could have anywhere from 0 to n defects. This is the idea of discrete scale. Then we will call p the percent of defects in one sample and will be calculated as (the number of defects/n). In each sample we will calculated p. If we did this t times we would have p1, p2, …, pt. Each of these p’s would be put into the control chart. The CL will be called “p bar” (really in the book this is the letter p with a line over it – it is a pain to type so I have you think p bar) and is calculated as (p1 + p2 + … + pt)/t

Attribute Control 9 In this case the standard deviation is calculated as the square root of [(p bar)(1 – p bar)/n]. Example from page 176 Each sample has n = 200. t = 11 samples are taken. Note.005 is.5%. I prefer to leave the data as a relative frequency and thus p bar = [ ]/11 =.14/11 =.0127 when rounded to 4 decimals. A standard deviation here is sqrt[.0127(.9873)/200] =.0079 Thus UCL = [3(.0079)] =.0364 and LCL = [3(.0079)] = Since LCL is negative and any p can not be negative we make LCL = 0

Example in book on page UCL =.0364 CL =.0127 LCL = 0 Time or successive sample observation Percent of defects The data points again are.005,.01,.015,.02,.015,.01,.015,.005,.01,.015,.02 and all fall with the limits from 0 to.0364 So, we have no special causes, or assignable cause, here! (note I did not plot each value – maybe you should – yea, yea, you do it!)

Variables Control 11 Let’s think about an example. Have you ever purchased Captain Crunch cereal? (I especially like it the day after I have burned the roof of my mouth with hot pizza!) Well, each box probably does not have exactly the amount of ounces as printed on the box. Some have more, some have less. Over time the thinking is your purchases will average out. The variable ounces in a box is an example of a continuous variable. With really precise measurement we can get any value, even fractional amounts, for the actual ounces in the box. When we have a continuous variable we will make two control charts – a central tendency (the average) chart and a variability (we will use the range as the variability measure, where range is largest minus smallest value) chart.

Variables Control 12 You may recall from your statistics training that when the mean is calculated that extreme values pull the mean toward the extreme value. Examples: Data set A: 1, 2 and 3 has mean = 2. Data set B: 1, 2, and 9 has mean = 4. Data set B has extreme value of 9 and thus mean is moved toward the value of 9. If we just watch the average we could get tricked. Think back to our cereal box example. Data set a: boxes have values 19, 20 and 21 ounces for an average = 20. The range here is = 2 Data set b: boxes have 10, 20 and 30 ounces for an average of 20. The range here is 30 – 10 = 20. The mean hasn’t changed but the range sure has. We look at charts for both averages and variability as measured by the range and stop the process if either gets outside its limits.

Variables Control 13 Call x bar the mean of a sample and call R the range of a sample (not to be confused with R squared in regression). The values of interest for the average chart are: CL = x double bar or the average of the averages! UCL = x double bar + [A2 times R bar], LCL = x double bar - [A2 times R bar]. The regular points in the chart will be sample averages. R bar is just the average of the sample ranges. A2 helps us get three standard deviations from the mean. The way to get the value was not even covered in basic stats. We will pick the value to use from the table on page 177 when we know the sample size. For example, if the sample size is 24 A2 =.157.

Variables Control 14 The values of interest for the range chart are CL = R bar, UCL = D4 times R bar, and LCL = D3 times R bar. The regular points in the chart will be sample ranges. D4 and D3 are similar in nature to A2. It is beyond the scope of the course to have you calculate A2, D3, and D4. But, we want you to use them. Example on page 177 A company has a machine that is producing bolts. Each hour a sample of six bolts are taken and the diameter of each bolt is measure. Say in 1 sample we have the values.536,.507,.530,.525,.530 and.520. The average is.525 and the range is ( ) =.029 (the R in the book should not be R bar for this one specific example – this is a typo.)

Example on page Note in this example you only have information on 1 specific example. The sample size of the sample is n = 6. We are told x double bar is.513 and R bar is.02. For the average chart we have values: CL =.513 UCL = (.02) =.523 LCL = (.02) =.503 For the range chart we have values: CL =.02 UCL = 2.004(.02) =.040 LCL = 0(.02) = 0 Again we only had one sample in this example with x bar =.525 and R =.02. Note our sample mean.525 is above the UCL =.523 so we have a problem. (we are okay on the range chart). The process is out of control and should be shut down to find an assignable cause.

Continuous Improvement The aim here is to reduce variability of the product or process.

Pareto Analysis Some guy named Vilfredo Pareto was very busy back around One insight he had is that when you look at a population a few items constitute a significant percentage of the whole group – what might be called the vital few. On page 179 in the book table 9.2 contains an example front end loaders (a tractor of some sort, right?) were inspected. 412 had defects. Let’s reorder what is in the table with highest number of defect category first and so on. We see the updated table on the next slide with an added column, the cumulative percentage. The cumulative percentage just starts in the first row and as you move down the down you accumulate, or add all the separate percentages.

Example Defective itemnumber%Cumulative% Loose Connections Cracked Connectors Fitting burrs Improper torque O-rings missing So, in the population of defects, the vital few are loose connections and cracked connectors. Figure 9.3 page puts some of this info in a graph. Note on the “x” axis we just have the item names listed in “sorted” order. On the left we have the number column and on the right we have the cumulative %.

Cause and Effect (CE) diagram Once the vital few have been decided on, each can be investigate more. Each vital few gets its own CE diagram. In the diagram a “fishbone” structure is built. The main spine identifies which vital few is being considered. Those involved in the process brainstorm possible causes and then each is examined more closely. Pareto charts and CE diagrams aid in reducing problems.