Bulk Electric System John D. Martinsen, P.E.

Slides:



Advertisements
Similar presentations
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
Advertisements

NAESB Coordinate Interchange
NAESB Smart Grid Task Force PAP 03 Update Robert B. Burke – NAESB Task Force Co-Chair Jim Northey.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Copyright © 2009 The Brattle Group, Inc. Antitrust/Competition Commercial Damages Environmental Litigation and Regulation Forensic Economics Intellectual.
Antitrust/Competition Commercial Damages Environmental Litigation and Regulation Forensic Economics Intellectual Property International Arbitration International.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
PER
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
COM Operating Personnel Communications Protocols
Steve Rueckert Director of Standards Standards Update June 5, 2014 Joint Guidance Committee Meeting Salt Lake City, UT.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
Acquisition of partial interest EASEMENTS. Does USPAP require a definition of the rights being appraised? Std Rule 1-2(e) Identify the characteristics.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
Organization of the electricity supply industry © 2012 D. Kirschen & University of Washington 0.
Pricing the Components of Electric Service in Illinois Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Entity Registration Under EPAct 2005 Public Power Council April 6, 2006 Louise McCarren Chief Executive Officer WECC.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Draft SAWG/RAWG Agenda Survey A Presentation to the MISO Supply Adequacy Working Group by the OMS Resource Adequacy Working Group August 16, 2004.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Distributed Generation Benefits and Planning Challenges CREPC/SPSC Resource Planners’ Forum October 3, 2012 Arne Olson.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Overview of WECC and Regulatory Structure
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Using a Dispersed Strategy in Your Region By Mike Michaud Matrix Energy Solutions Edited and Presented By Brian Antonich Windustry.
Status Report for Critical Infrastructure Protection Advisory Group
Bulk Power Transmission System
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
NARUC Energy Regulatory Partnership Program The Georgian National Energy Regulatory Commission and The Vermont Public Service Board by John D. Burke, Board.
Project (COM-001-3) Interpersonal Communications Capabilities Michael Cruz-Montes, CenterPoint Energy Senior Consultant, Policy & Compliance, SDT.
Enhancing Reliability of the North American Transmission Grid Enhancing Reliability of the North American Transmission Grid Presented By Dejan J Sobajic.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
Standards Review Subcommittee Update August 17, 2010.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
How the Transmission System Works Really William F. Reinke.
Overview of the Grid Clean Power Plan and Tribes October 15, 2015 webinar.
AEP PRESENTATION TO SPP MULTI-OWNER COMPENSATION TASK FORCE Presented July 8, 2004 Dallas, Texas.
Overview of the Grid Randy Manion, Western Area Power Admin. EPA Clean Power Plan Workshops Farmington, NM, December 7 and 8, 2015 Tuba City, AZ, December.
Distributed Generation Registration June 30, 2008.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
RTO WEST Summary of RTO West 9/18/02 Declaratory Order Presentation to The Committee on Regional Electrical Power Cooperation (CREPC) by John Carr 10/1/02.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
Massachusetts Electric Restructuring Roundtable
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
NERC Congestion Management
Presentation transcript:

Bulk Electric System John D. Martinsen, P.E. Snohomish County Public Utility District (SNPD)

4/11/2017 Summary Part 1 “Performance Based” Bulk Electric System (“BES”) definition BES definition(s) NERC, WECC, and electric industry efforts in defining the BES Part 2 Examples of BPA Transmission and Distribution systems

“Performance Based” BES Definition What function does the facility serve? local distribution service? support a WECC transfer path? If the facilities fail, do they impact other transmission owners and operators?

Bulk Electric System Definition Task Force (“BESDTF”) 4/11/2017 Bulk Electric System Definition Task Force (“BESDTF”) Western Interconnection development of a “performance based” standard FERC support of WECC effort in Order 743-A BPA comments on the revision of the ERO definition of the BES (Docket No. RM09-18-000) “…Western Interconnection, utilities must use higher voltage facilities, i.e., 115 kV, to accomplish what is effectively a distribution function with in the utility. Where demonstrated, these facilities should be categorized as distribution network components, not as bulk electric system facilities…” “… Bonneville urges the Commission to provide an additional option for the ERO to submit a Regional Entities material impact methodology for Commission approval…” “…Agrees with the need to exempt FAC that have low impact on the BES…” “…Bonneville believes many facilities in the Western Interconnection rated at 100kV and above should not be included in the BES because they have no material impact on the bulk power system reliability…”

Historic BES Definition 4/11/2017 Historic BES Definition NERC Bulk Electric System Glossary of Terms approved by both the EC and OC at the July 16, 1996 Joint EC/OC Meeting: “A term commonly applied to the portion of an electric utility system that encompasses the electrical generation resources and bulk transmission system” “Transmission — An interconnected group of lines and associated equipment for the movement or transfer of electric energy between points of supply and points at which it is transformed for delivery to customers or is delivered to other electric systems” “Bulk Transmission — A functional or voltage classification relating to the higher voltage portion of the transmission system” “Subtransmission — A functional or voltage classification relating to the lower voltage portion of the transmission system.”

Current BES Definition 4/11/2017 Current BES Definition BES definition, NERC approved 2/8/2005, FERC approved 3/16/2007: “As defined by the Regional Reliability Organization, the electrical generation resources, transmission lines, interconnections with neighboring systems, and associated equipment, generally operated at voltages of 100 kV or higher. Radial transmission facilities serving only load with one transmission source are generally not included in this definition”

Revised BES Definition at FERC 4/11/2017 Revised BES Definition at FERC “Unless modified by the lists shown below, all Transmission Elements operated at 100 kV or higher and Real Power and Reactive Power resources connected at 100 kV or higher. This does not include facilities used in the local distribution of electric energy” With inclusions & exclusions listed Approved by the electric industry’s NERC ballot body and the NERC Board of Trustees

Load Service Exclusions 4/11/2017 Load Service Exclusions Radial systems: A group of contiguous transmission Elements that emanates from a single point of connection of 100 kV or higher and: a) Only serves Load. Or.. Note - A normally open switching device between radial systems, as depicted on prints or one-line diagrams for example, does not affect this exclusion

4/11/2017 Radial System

Load Service Exclusions 4/11/2017 Load Service Exclusions “Local Networks (LN): A group of contiguous transmission Elements operated at or above 100 kV but less than 300 kV that distribute power to Load rather than transfer bulk power across the interconnected system. LN’s emanate from multiple points of connection at 100 kV or higher to improve the level of service to retail customer Load and not to accommodate bulk power transfer across the interconnected system”

LN Characteristics The LN is characterized by all of the following: 4/11/2017 LN Characteristics The LN is characterized by all of the following: b) Power flows only into the LN and the LN does not transfer energy originating outside the LN for delivery through the LN; and c) Not part of a Flowgate or transfer path: The LN does not contain a monitored Facility of a permanent Flowgate in the Eastern Interconnection, a major transfer path within the Western Interconnection, or a comparable monitored Facility in the ERCOT or Quebec Interconnections, and is not a monitored Facility included in an Interconnection Reliability Operating Limit (IROL).

4/11/2017 Local Network

FERC’s Seven-Factor Test Presented by: Philip Hanser June 13, 2012

Agenda Overview of FERC’s Seven-Factor Test Application of the Test by State Commissions Application of the Test by FERC Takeaways

FERC’s Seven-Factor Test for Local Distribution Facilities In Order 888, the FERC set out a seven-factor test to distinguish distribution facilities from transmission facilities when establishing whether the delivery component of an unbundled retail power sale was transmission or distribution: local distribution facilities are normally in close proximity to retail customers local distribution facilities are primarily radial in character power flows into local distribution systems, and rarely, if ever flows out when power enters a local distribution system, it is not reconsigned or transported on to some other market power entering a local distribution system is consumed in a comparatively restricted geographic area meters are based at the transmission/local distribution interface to measure flow into the local distribution system local distribution systems will be of reduced voltage

State Case 1 (Iowa Utilities Board): MidAmerican Energy Co State Case 1 (Iowa Utilities Board): MidAmerican Energy Co. Order Issued April 30, 1999 In November 1998, MidAmerican filed a petition for an Iowa Utilities Board order recommending delineation of local distribution facilities (subject to Board’s jurisdiction) and transmission facilities (subject to FERC jurisdiction). MidAmerican proposed to classify all lines 69 kV and below as well as certain 161 kV lines as distribution Classification of 69 kV and 161 kV lines was contested The Board noted that: In accordance with Order 888, FERC will defer to states’ determinations of which facilities are transmission vs. distribution. Such delineation is only needed when states unbundle retail rates—FERC has said that the delineation is not required when states only implement retail access programs of short length (deemed “pilots” or “experiments”). In administering the Test, “some lines or facilities classified as distribution may not meet all the indicators of distribution lines.” No single factor is determinative and all factors should be evaluated and weighted in establishing the delineation.

Board’s Discussion of Evidence 161 kV lines (in Waterloo) satisfied all FERC factors except #7: Factors 1 and 5: Lines are in close proximity to retail customers in a comparatively restricted area. Factor 2: Although not radially configured, the lines function and provides service as though they are primarily radial in character. Factor 3 and 4: Power rarely, if ever, flows out of the system and is not transported out to another market. Factor 6: Equipment installed at each interface distinguishes transmission system vs. distribution system power flows. Factor 7: The 161 kV Lines do not appear to meet the reduced voltage test of Factor 7. However, since “the lines meet an overwhelming preponderance of the factors, the Board believes it is most reasonable to classify them as distribution.” 69 kV lines satisfied all FERC factors

FERC Case 1: California Pacific Electric Company (CalPeco) Order Issued October 7, 2010 CalPeco is a California Company formed for the purpose of acquiring the assets and operations of Sierra Pacific Power Company electric distribution system in CA (“California Distribution System”) Due to geographic remoteness of some parts of the service territory, as well as historic interconnections, CalPeco was required to provide “minimal” delivery and reliability services to Sierra to enable Sierra to reliably supply power to its Nevada customers CalPeco made several requests to FERC, including that it declares that all distribution facilities that are acquired by CalPeco are considered to be local distribution facilities. CalPeco argued the application of the seven-factor test confirmed that the California Distribution System should be classified as a local distribution system

CalPeco’s Arguments Test Factors CalPeco’s Claim # 1 local distribution facilities are normally in close proximity to retail customers Customers are concentrated in the South Lake Tahoe and North Lake Tahoe areas, and virtually all customers are served by distribution facilities within 15 miles. 2 local distribution facilities are primarily radial in character Absent an emergency situation, the system is exclusively radial in nature. Power only flows in one direction. The only generation on the system is Kings Beach, which is used for emergency back-up purposes and limited to producing no more than 1,400 MWh/yr. 3 power flows into local distribution systems, and rarely, if ever flows out All power is exclusively consumed by consumers within CalPeco service territory with some exceptions [see next slide] 4 when power enters a local distribution system, it is not reconsigned or transported on to some other market No power entering the system will be transported to electric markets. Power leaving the system will be used by retail customers of other utilities located in close proximity to the system. [see next slide] 5 power entering a local distribution system is consumed in a comparatively restricted geographic area 6 meters are based at the transmission / local distribution interface to measure flow into the local distribution system Perimeter metering will be installed and maintained to measure all flows into and out of the system. 7 local distribution systems will be of reduced voltage 1400 miles of 12.5 kV, 14.4 kV, and 25.9 kV distribution circuits, 75 miles of 60 kV distribution lines, and 19 miles of 120 kV distribution lines. FERC has not established a definition of what constitutes a reduced voltage distribution line. The limited nature of the three 120 kV distribution lines, combined with the fact that the remaining lines are 60kV or below, satisfies Factor 7.

CalPeco’s Arguments (cont’d) FERC found that: The California Distribution System meets factors 1, 2, 5, 6, and 7 The application of factors 3 and 4 is somewhat complicated in this case. CalPeco described four instances, in which power actually flowed out of the California Distribution System However, power flowing out of the California Distribution System would be for: (1) border communities; or, (2) emergency assistance Based on the “totality of circumstances” the California Distribution System met the seven-factor test.

FERC Case 2: City of Pella, Iowa Order Issued February 2, 2011 Pella owns and operates a municipal electric utility in Marion County, IA—the electricity is distributed by Pella to residential, public, and industrial customers with retail boundaries prescribed by the state of Iowa. Pella has been a MISO market participant since 2004 and a network integration transmission service (NITS) MISO customer since Sep. 2009 (when MidAmerican joined MISO)—prior to that, Pella bought point-to-point transmission as needed. Pella requested that the FERC reclassify its 69 kV facilities as transmission facilities FERC noted that, in the late 1990s, MidAmerican asked the Iowa Commission to reclassify all lines 69 kV and below as distribution, including the lines that interconnect with Pella’s 69 kV facilities. The Iowa Commission accepted MidAmerican’s reclassification proposal and the FERC adopted the determination in 2000 [see earlier slides on State Case 1].

Pella’s Arguments in Support of Transmission Classification # Test Factors Pella’s Claim 1 local distribution facilities are normally in close proximity to retail customers Interconnections at the Pella West and Pella East Substations support service to areas served by MidAmerican and CIPCO within a 30 mile radius of Pella. The 69 kV facilities are essential to complete imports and exports of power across a wide region and allow for transmission over a broad region. 2 local distribution facilities are primarily radial in character The 69 kV facilities are looped and are interconnected with “other utility transmission” linking them with multiple sources of power and markets. Each of its 69 kV lines serves a number of transmission functions. The facilities together allow power to flow from the facilities of Pella, MidAmerican, CIPCO, and ITC Midwest to the transmission facilities of these and other utilities. 3 power flows into local distribution systems, and rarely, if ever flows out Power flows across its 69 kV facilities are bidirectional and power flow data establish that power flows into, across, and out of these facilities on a regular basis. 4 when power enters a local distribution system, it is not reconsigned or transported on to some other market Power flows across the 69 kV facilities to other markets, including CIPCO and MISO. The facilities enable the sale and purchase of power as well as interchange. 5 power entering a local distribution system is consumed in a comparatively restricted geographic area While power flows into Pella’s system to serve its load, power also flows through its system to loads connected to the MidAmerican, CIPCO, and MISO systems. 6 meters are based at the transmission / local distribution interface to measure flow into the local distribution system Pella’s meters are configured to measure bilateral flows and used for billing for transmission by the local balancing authority. These meters are used to validate billing for wholesale transactions among utilities and to determine energy and ancillary services with MISO. 7 local distribution systems will be of reduced voltage Local distribution system operate at a reduced voltage (typically 12.47 kV) compared to Pella’s elevated 69 kV transmission facilities.

Pella’s Arguments (cont’d) FERC accepted Pella’s arguments that its 69 kV facilities should be classified as transmission facilities and noted that: The 69 kV facilities are not in close proximity to retail customers, but are used to support service to communities across a wide region. Power that enters Pella's 69 kV facilities is transported across its system to other markets and the facilities are “not primarily radial in character” Average of 30 percent of the energy flowing into Pella's interconnection points between 2007 and 2009 flowed out of Pella's facilities. Power that enters Pella's 69 kV facilities is transported across its system to other markets. Power that enters Pella's system is not consumed in a comparatively restricted geographical area. Pella’s meters are used to measure bilateral flows. Pella’s 69 kV facilities operate at a higher voltage than those facilities that Pella uses to serve retail load.

Takeaways The primary functionality of the system plays a substantial role in the application of the seven-factor test: In CalPeco, power was shown to flow out of the system in several types of situations related to reliability, emergency assistance, and serving border communities—the primary function of the system, however, was determined to satisfy the seven-factor test In MidAmerican, the Board acknowledged that the 161 kV lines do not satisfy factor 7, but ruled that the overwhelming evidence points to a distribution facility classification. In Pella, FERC reclassified MidAmerican’s 69kV lines to transmission on the basis of Pella’s demonstrating they primarily performed transmission functions

PART 2 Examples of BPA Transmission and Distribution systems 4/11/2017 PART 2 Examples of BPA Transmission and Distribution systems BPA Radial System BPA Radial (Open Loop) BPA LN (Radial in Character) BPA BES Network (Part of a Transfer Path) BPA BES Network or Distribution? Methodology for Consideration

BPA Radial System D1=27 miles D2=46 miles D3=19 miles 4/11/2017 BPA Radial System D1=27 miles D2=46 miles D3=19 miles Power flows into the 115 kV system Outages on the radial system do not cause adjacent 230 kV 0r 115kV system voltage or thermal violations

BPA Radial (Open Loop) D1=2 miles D2=2 miles D3=2 miles D4= 2 miles 4/11/2017 BPA Radial (Open Loop) D1=2 miles D2=2 miles D3=2 miles D4= 2 miles D5=1 miles D6=16 miles D7=1 miles Open loop configuration (Normally open switch ) Power always flows into the 115 kV system Outages on the radial system do not cause adjacent 230 kV 0r 115kV system voltage or thermal violations

BPA LN (Radial in Character) 4/11/2017 BPA LN (Radial in Character) D1=11 miles D2=15 miles Closed loop configuration Power flows into the 115 kV system Outages on the Local Network do not cause adjacent 230 kV 0r 115kV system voltage or thermal violations

BPA BES Network (Part of a Transfer Path) 4/11/2017 BPA BES Network (Part of a Transfer Path) D1=28 miles D2=54 miles Closed loop configuration 11 MW flows in and 2 MW flows out of the 115 kV system Part of a major transfer path within the Western Interconnection

BPA BES Network or Distribution? 4/11/2017 BPA BES Network or Distribution? D1=4 miles D2=38 miles D3=4 miles D4=38 miles D5=38 miles Closed loop configuration 60MW flows in and 22 MW flows out of the 115 kV system Not Part of a major transfer path within the Western Interconnection Outages on the Local Network do not cause adjacent 230 kV 0r 115kV system voltage or thermal violations under heavy winter base case condition Requires further “performance based” assessment

Methodology for Consideration 4/11/2017 Methodology for Consideration Consistent methodology for reliability and commercial purposes Can the facilities adversely or favorably impact neighboring systems? Radial systems that do not impact neighboring systems BPA Radial Systems BPA Radial (Open Loop) BPA Local Network (Radial in Character) Networked system that impact neighboring systems BPA BES Network (Part of a Transfer Path) Networked system that may or may not impact neighboring systems Use a “performance based” assessment

Thank You