Deliverable documents planned status 1/2 Del. no. Deliverable name WP no. Responsibilit y Reviewer Nature/disse mination Level Delivery date from Annex.

Slides:



Advertisements
Similar presentations
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europea dentro del Sexto Programa Marco 1 technical session WP0 State of.
Advertisements

RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europea dentro del Sexto Programa Marco 1 PSG meeting & minutes, Friday.
CMDH Refinement Contribution: oneM2M-ARC-0397
Portable and Predictable Performance on Heterogeneous Embedded Manycores (ARTEMIS ) ARTEMIS Project Review October 2014 WP1 “Management and IPR”
1 FP7SESAMFORCE Reporting Tools Access through the Participant Portal Reporting Tools Access.
EMODNet Lot 4 - Chemistry Overview, management and administrative issues Alessandra Giorgetti (OGS) with the contribution of Altenburger Alessandro, Brosich.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT Progress / objectives (WP and project level) Progress / milestones (WP and project level) Progress / deliverables.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 1 Technical seminar (WP0.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
SCAMPI Review WP6: Project Management 3r d Annual Review of Project CNET-ICT Beaulieu, Brussels, Belgium 26 November, 2013.
Requirements Verification & Validation Requirements Engineering & Project Management.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Peggy McCoey, M.S. (215)
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
Annual review ROME 2012 WP4 - Network. Work package - objectives – Task 4.1 Smart SPD driven transmission SE; SG; THYIA; TUC; UNIGE – Task 4.2 Distributed.
MODERN 1 st Year Review ENIAC MODERN Ref. Technical Annex MODERN_PartB Rev2 v2.4 WP1: Giuliana GangemiWP2: André Juge WP3: Wilmar HeuvelmanWP4:
12-13 July 2011, University of Rome "La Sapienza" Rome, Italy pSHIELD Consortium Meeting Przemyslaw Osocha, SESM,
TESTING SERVICES Overview Testing Accommodations is a collaborative process between the DRC student, the Professor, and DRC. COMMUNICATION IS ESSENTIAL.
Green Partnerships Local Partnerships for Greener Cities and Regions Study visit and 3 rd Steering Committee meeting Freiburg, 14 – 18 October 2013.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
PROJECT LIFECYCLE.
Large Generator Interconnection Procedures Reform 2 nd Stakeholder Meeting May 5, 2009.
NSHIELD – TA Amendments TMC Call Conference. 2 TMC Members Gordana Mijic Paolo Azzoni - Antonio AbramoPaolo Azzoni Marco Cesena Andrea Morgagni Elisabetta.
Plenary Meeting Crete, 3-4 September, RURAL WINGS IP RURAL WINGS WP8 Status.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
1 Role of National Contacts - Diffusion of information in your community - Consortium status - Overhead - Threshold for partnership - Reimbursement rules.
Sprint Plans and Burndown Charts David Millard | davidmillard.org.
5b. ESA & WP9: effort and recovery plan ESA DataGrid Review Frascati, 10 June Welcome and introduction (15m) 2.WP9 – Earth Observation Applications.
INGAS - Integrated GAS Powertrain 18 months Meeting, Paris GdF Suez May, 2010 Project number: May 2010 Project number:
Type of funding scheme: STREP Work programme topics addressed: PHC 30 – 2015 Digital representation of health data to improve disease diagnosis and treatment.
Phoneconf u-2010 June 5 th, 2009 Harold Linke / HITEC Luxembourg.
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf.
ERASMUS+ EMREX – Field trial on the impact of enabling easy mobility on recognition of external studies Title and date.
Doc.: IEEE /263r0 Submission José A. Gutierrez July-2002 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
Как се подава проектно предложение по 7РП Емилия Домусчиева г., София.
TECHNICAL QUALITY MANAGEMENT Technical Quality Management Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related.
Review Preparation Meeting of the FP7 Project J-AGE Vienna 25th March 2015.
Hoeilaart, 19 February 2009 Slide 1 CITE tests for and HMA-T Phase 2 Progress Meeting 19 February 2009, Hoeilaart Nicolas Lesage, IGN.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Brussels, January 16th, Overview and status of the project.
Chapter 16 Overview: Writing Proposals
Royal College of Physicians of Edinburgh Scottish Stroke Collaboration Meeting 22nd September 2010 Queen Mother Conference Centre.
WP3 - Evaluation and proposal selection
WP8: Demonstrators (UniCam – Regione Marche)
4th. Plenary Meeting, Edinburgh, May 2010
Oct 22 Group Leaders Planning meeting
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
EMI Project Processes and Tools
Reports Activities since last meeting in Lund #1
Preparing for Capstones Analytics Computer Information Science
Quality Workshop The Local Council Award Scheme is a great guide for good practice in our sector and a way for councils to build confidence in their.
SKADS Controller’s Meeting Timeline Annual Financial Report
Eggs for consumption Item 8.1
WP1 Vidyo Meeting 16 October 2018
January 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4d Closing Report for Orlando March 2008,
DSG Governance Group Recommendations.
May 2000 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3 Selection Process Flow Chart] Date Submitted:
Presentation transcript:

Deliverable documents planned status 1/2 Del. no. Deliverable name WP no. Responsibilit y Reviewer Nature/disse mination Level Delivery date from Annex I (proj month) Delivered Yes/No Actual status Actual / Forecast delivery date D1.2 Quality Control Guidelines 1SES (Cecilia) SES/MAS (Elisab/Jos) R/PP3 Issue 1 Rejected New draft has been sent to WP1 partner 31/07/2013 D8.4 Build Secure Embedded Systems with nSHIELD v1 8MGEPMASR/PU12NoDraft on Wiki 15/07/2013 D1.6 Quality Control Report 1 1SES (Cecilia) SES/MAS (Elisab/Jos) R/PU15NoTo be started 30/09/2013 D1.7 Periodic Management Report 1SES (Cecilia)SESR/PP18No Draft on Wiki (waiting for JN contribution) 30/06/2013 D3.2 Preliminary SPD node technologies prototype 3 ISD (Dramitinos) SESP,O/RE18YesWaiting for reviewer 30/9/2013 D3.3 Preliminary SPD node technologies prototype report 3 ISD (Dramitinos) SESR/PU18YesWaiting for reviewer 30/9/2013 D4.2 Preliminary SPD network technologies prototype 4 SES (Cesena- Kresimir) ETHP,O/RE18NoAvailable on Wiki 31/07/2013 D4.3 Preliminary SPD network technologies prototype report 4 SES (Cesena- Kresimir) ETHR/PU18No Available on Wiki 31/07/2013 D5.2 Preliminary SPD middleware and overlay technologies prototype 5 UNIROMA1 (Suraci- Fiaschetti) P,O/RE18No On Wiki (80%) 31/07/2013 D5.3 Preliminary SPD middleware and overlay technologies prototype report 5 SES (Morgagni) UNIROMA1R/PU18NoOn Wiki (95%) 31/07/2013 D6.1 Lifecycle and SPD Support Plan 6 TECNALIA (Inaki) R/CO18NoAvailable on Wiki 30/06/2013

Deliverable documents planned status 2/2 Del. no. Deliverable nameWP no.ResponsibilityReviewer Nature/dissemi nation Level Delivery date from Annex I (proj month) Delivered Yes/No Actual status Actual / Forecast delivery date D6.2 Prototype validation and verification 6 SES (Morgagni) R/RE20 NoAvailable on Wiki (30%) 31/08/2013 D6.3 Prototype integration report 6 HAI (Nikolaos) R/RE22 No31/08/2013 D7.1 Railways security demonstrator - integration and validation plan 7 ASTS (Flammini) R/CO22 NoAvailable on Wiki 30/06/2013 D7.2 Voice/Facial Recognition demonstrator - integration and validation plan 7 ETH (Paolo) R/CO22 No15/07/2013 D7.3 Dependable Avionic Systems demonstrator - integration and validation plan 7 SES (Traversone Larghi) SESM R/CO22 No15/07/2013 D7.4 Social Mobility and Networking integration and validation plan 7 MAS (Josef) R/CO22 NoWhat kind of document? D1.8Periodic Annual Report 2 1 SES (Cecilia)SES R/PP24 No30/09/2013 D2.6 Final System Requirements and Specifications 2 TECNALIA (With SES- ASTS-ETH- Mas support) SES R/PU24 No30/09/2013 D8.5 Preliminary Exploitation Plan 8 INDRA (Vasquez- Inasi) R/PP24 No30/09/2013 D8.6 Build Secure Embedded Systems with nSHIELD v2 8 MGEP (Roberto) MAS R/PU24 No30/09/2013

Summary and Actions Action D8.4(M12) and D8.6(M24): Lorena (AT), Elisabetta (SES) and Paolo (ETH) agreed with the opportunity to deliver two separate documents, as in the TA. Cecilia (SES) will ask to Josef (MAS) and Roberto (MGEP) to deliver D8.4 as soon as possible, also if in a preliminary stage. D1.6Cecilia (SES) will prepare a draft copy of the deliverable D1.6Elisabetta (SES) and Lorena (SES) will support and review the document D3.2 and D3.3Cecilia (SES) will ask to M. Cesena (SES) to review the deliverables, before the updating on NEF. D4.2 and D4.3Paolo (ETH) will be the reviewer for the D4.2 and D4.3 D6.2 and D6.3The deliverables are on delay because the number of prototypes is higher than expected or previously documented (35 instead 12). The real number of prototypes is one of the results of the meeting of Stockholm. D7.1-D7.2-D7.3 (M22) A common «Table of contests» (partially derived from the D7.1 draft) will be proposed by SES by Friday 28th and then uploaded on Wiki. The same format could be used for the feasibility study. Mariana (ASTS) and Paolo (ETH) will adapt their deliverables to the format proposed by SES D2.6: Elisabetta (SES) and Andrea (SES) told that this deliverable is strictly connected with the D2.2 and that the only activity to be done is asking to each demonstrator leader to verify that the D2.2 includes all the requirements related to each demonstrator and, if is the case, to integrate additional requirements. Consequently the D2.6 leader should just coordinate the activities of each demonstrator leader. They suggested to ask to Inaki to accept the leadership of D2.6 Cecilia will contact Inaki by the middle of the coming week TACecilia (SES) will contact Josef (MAS) for T7.4 short description -Participants: Elisabetta Campaiola (SES), Andrea Morgagni(SES), Lucio Marcenaro (Unige), Mariana Esposito (ASTS), Paolo Azzoni (ETH), George Dramitinos (ISD) -The first part of the meeting has been held on Webex, the second part continued on teleconference, because Lucio and Paolo were neither able to hear nor to be heard.