NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-1 MAJOR MAINTENANCE FY 14 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS DP1 A LEGEND – (TYPICAL FOR ALL PHOTO SHEETS AND LAYOUT PLAN) INSTALL WATERPLUG HYDRAULIC CEMENT – (SEE DETAIL ‘A’ ON SHEET C-3). PROVIDE PIPE SLEEVE REPAIR – (SEE DETAIL ‘B’ ON SHEET C-3) PROVIDE STRUCTURAL REPAIR (SEE DETAIL ‘C’ ON SHEET C-3) DESIGNATES PHOTO # (SEE LAYOUT DRAWINGS C-1 & C-2 FOR LOCATIONS IN TUNNEL) B C P1 PROVIDE FLOOR TO CEILING REPAIR PER DETAIL ‘D’ REQUIREMENTS DATE: 05/31/13 D P1-1 NO PHOTO – CRACK REPAIR REQUIRED SIMILAR TO P1 PROVIDE CRACK INJECTION REPAIR (SEE DETAIL ‘D’ ON SHEET C-5) D PROVIDE CONSTRUCTION JOINT SEALING SYSTEM (DETAIL ‘D1’ SHT. C-5) D1 Addendum #1 06/06/13
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-2 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS CP2 PROVIDE STRUCTURAL REPAIR ALONG ENTIRE LENGTH OF CONCRETE BEAME AT CEILING - REPAIR PER DETAIL ‘C’ REQUIREMENTS DATE: 05/31/13
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-3 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS BP3 PROVIDE REPAIR AROUND ENTIRE PERIMETER OF CONDUIT BANK - REPAIR PER DETAIL ‘B’ REQUIREMENTS CAREFULLY REMOVE ALL EXPANDING FOAM PRIOR TO REPAIR. MAINTAIN INTEGRITY OF SLEEVES / CABLES. DATE: 05/31/13
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-4 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS DP4 PROVIDE FLOOR TO CEILING REPAIR PER DETAIL ‘D’ REQUIREMENTS DATE: 05/31/13 Addendum #1 06/06/13
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-5 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS DP5 PROVIDE FLOOR TO CEILING REPAIRS PER DETAIL ‘D’ REQUIREMENTS DATE: 05/31/13 Addendum #1 06/06/13
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-6 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS BP6 D1P7 PROVIDE REPAIR AROUND ENTIRE PERIMETER OF PIPE - REPAIR PER DETAIL ‘B’ REQUIREMENTS PROVIDE FLOOR TO CEILING REPAIRS PER DETAIL ‘D1’ REQUIREMENTS DATE: 05/31/13 Addendum #1 06/06/13
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-7 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS AP8 D1P9 PROVIDE FLOOR TO CEILING REPAIRS PER DETAIL ‘D1’ REQUIREMENTS PROVIDE FLOOR SLAB TO WALL REPAIRS PER DETAIL ‘A’ REQUIREMENTS DATE: 05/31/13 D P8A P8A – NO PHOTO AVAILABLE. LOCATION OF CRACK IS 3 FORM JOINT LINES SOUTH OF THE P9 CONTROL JOINT. Addendum #1 06/06/13
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-8 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS D1 P10 PROVIDE FLOOR TO CEILING & ALONG ENTIRE CEILING REPAIRS PER DETAIL ‘D1’ REQUIREMENTS DATE: 05/31/13 Addendum #1 06/06/13
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-9 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS A P11 PROVIDE REPAIRS PER DETAIL ‘A’ REQUIREMENTS DATE: 05/31/13
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-10 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS C P12 PROVIDE STRUCTURAL REPAIR ALONG ENTIRE LENGTH OF SPALLED AND DELAMINATED AREA. SOUND-OUT ENTIRE AREA TO ENSURE ALL FAILED SECTIONS ARE REPAIRED - REPAIR PER DETAIL ‘C’ REQUIREMENTS. REMOVE & RE-INSTALL LIGHTING SUPPORT STRUTS AS REQUIRED TO COMPLETE THE WORK DATE: 05/31/13
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-11 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS B P13 PROVIDE REPAIR AROUND ENTIRE PERIMETER OF PIPE - REPAIR PER DETAIL ‘B’ REQUIREMENTS DATE: 05/31/13
PHOTO. NO.DATE: 05/31/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-12 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS B P14 PROVIDE REPAIR AROUND ENTIRE PERIMETER OF PIPES IN ITS DATA CLOSET - REPAIR PER DETAIL ‘B’ REQUIREMENTS