NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.

Slides:



Advertisements
Similar presentations
NOTE: REFERENCE PROJECT MANUAL DATED 1/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
Advertisements

PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET OLIN.
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
WESLEYAN P BID PACKAGE #19
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P LAWN AVENUE VINYL SIDING,
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.
PHOTO. NO.DATE: 06/11/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MAJOR MAINTENANCE FY 14.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P AB HOME AVENUE INTERIOR.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P / 169 HIGH STREET VINYL.
Residential Construction Drawings
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
WESLEYAN P JUDD HALL STAIRWELL LIGHTING REPLACEMENT PROJECT
WESLEYAN P-3-1 MAJOR MAINTENANCE FY PINE STREET
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
FIRE ALARM / FIRE SPRINKLER SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-19-1 MAJOR MAINTENANCE FY BRAINERD AVENUE
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
WESLEYAN P C CAPITAL FY 15 OLIN LIBRARY
WESLEYAN P-32-2 MAINTAIN JUT OUT AND PAINT TO MATCH SIDING
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
LONG LANE GROUNDS GARAGE SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P MAJOR MAINTENANCE FY 14 Foss Hill 1-7
SECTION EXISTING CONDITION PHOTOS
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Interior/Exterior Renovation SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-41-1 MAJOR MAINTENANCE FY AB HOME AVENUE
PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-28-1 MAJOR MAINTENANCE FY WASHINGTON STREET
Repair roof rafters / joists, soffit and fascia boards in this area.
SECTION EXISTING CONDITION PHOTOS
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-3-1 MAJOR MAINTENANCE FY 15 FOSS 1 – 18 FOSS HILL DRIVE
WESLEYAN P-13-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-23-1 MAJOR MAINTENANCE FY 16 63AB HOME AVENUE
WESLEYAN P-22-1 MAJOR MAINTENANCE FY 16 23A VINE STREET
WESLEYAN P-FAFS-1 MAJOR MAINTENANCE FY WASHINGTON STREET
FRONT PORCH REPLACEMENT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-40-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-38-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-18-1 MAJOR MAINTENANCE FY COURT STREET
Presentation transcript:

NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-1 MAJOR MAINTENANCE FY 14 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS DP1 A LEGEND – (TYPICAL FOR ALL PHOTO SHEETS AND LAYOUT PLAN) INSTALL WATERPLUG HYDRAULIC CEMENT – (SEE DETAIL ‘A’ ON SHEET C-3). PROVIDE PIPE SLEEVE REPAIR – (SEE DETAIL ‘B’ ON SHEET C-3) PROVIDE STRUCTURAL REPAIR (SEE DETAIL ‘C’ ON SHEET C-3) DESIGNATES PHOTO # (SEE LAYOUT DRAWINGS C-1 & C-2 FOR LOCATIONS IN TUNNEL) B C P1 PROVIDE FLOOR TO CEILING REPAIR PER DETAIL ‘D’ REQUIREMENTS DATE: 05/31/13 D P1-1 NO PHOTO – CRACK REPAIR REQUIRED SIMILAR TO P1 PROVIDE CRACK INJECTION REPAIR (SEE DETAIL ‘D’ ON SHEET C-5) D PROVIDE CONSTRUCTION JOINT SEALING SYSTEM (DETAIL ‘D1’ SHT. C-5) D1 Addendum #1 06/06/13

PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-2 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS CP2 PROVIDE STRUCTURAL REPAIR ALONG ENTIRE LENGTH OF CONCRETE BEAME AT CEILING - REPAIR PER DETAIL ‘C’ REQUIREMENTS DATE: 05/31/13

PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-3 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS BP3 PROVIDE REPAIR AROUND ENTIRE PERIMETER OF CONDUIT BANK - REPAIR PER DETAIL ‘B’ REQUIREMENTS CAREFULLY REMOVE ALL EXPANDING FOAM PRIOR TO REPAIR. MAINTAIN INTEGRITY OF SLEEVES / CABLES. DATE: 05/31/13

PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-4 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS DP4 PROVIDE FLOOR TO CEILING REPAIR PER DETAIL ‘D’ REQUIREMENTS DATE: 05/31/13 Addendum #1 06/06/13

PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-5 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS DP5 PROVIDE FLOOR TO CEILING REPAIRS PER DETAIL ‘D’ REQUIREMENTS DATE: 05/31/13 Addendum #1 06/06/13

PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-6 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS BP6 D1P7 PROVIDE REPAIR AROUND ENTIRE PERIMETER OF PIPE - REPAIR PER DETAIL ‘B’ REQUIREMENTS PROVIDE FLOOR TO CEILING REPAIRS PER DETAIL ‘D1’ REQUIREMENTS DATE: 05/31/13 Addendum #1 06/06/13

PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-7 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS AP8 D1P9 PROVIDE FLOOR TO CEILING REPAIRS PER DETAIL ‘D1’ REQUIREMENTS PROVIDE FLOOR SLAB TO WALL REPAIRS PER DETAIL ‘A’ REQUIREMENTS DATE: 05/31/13 D P8A P8A – NO PHOTO AVAILABLE. LOCATION OF CRACK IS 3 FORM JOINT LINES SOUTH OF THE P9 CONTROL JOINT. Addendum #1 06/06/13

PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-8 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS D1 P10 PROVIDE FLOOR TO CEILING & ALONG ENTIRE CEILING REPAIRS PER DETAIL ‘D1’ REQUIREMENTS DATE: 05/31/13 Addendum #1 06/06/13

PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-9 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS A P11 PROVIDE REPAIRS PER DETAIL ‘A’ REQUIREMENTS DATE: 05/31/13

PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-10 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS C P12 PROVIDE STRUCTURAL REPAIR ALONG ENTIRE LENGTH OF SPALLED AND DELAMINATED AREA. SOUND-OUT ENTIRE AREA TO ENSURE ALL FAILED SECTIONS ARE REPAIRED - REPAIR PER DETAIL ‘C’ REQUIREMENTS. REMOVE & RE-INSTALL LIGHTING SUPPORT STRUTS AS REQUIRED TO COMPLETE THE WORK DATE: 05/31/13

PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-11 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS B P13 PROVIDE REPAIR AROUND ENTIRE PERIMETER OF PIPE - REPAIR PER DETAIL ‘B’ REQUIREMENTS DATE: 05/31/13

PHOTO. NO.DATE: 05/31/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y S-12 CENTER FOR THE ARTS TUNNEL / BASEMENT WATERPROOFING PROJECT SECTION EXISTING CONDITION PHOTOS B P14 PROVIDE REPAIR AROUND ENTIRE PERIMETER OF PIPES IN ITS DATA CLOSET - REPAIR PER DETAIL ‘B’ REQUIREMENTS