1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 WP1 “Service monitoring the energy patterns of processes:

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET WP2: Implementation of the System and Preparation of Services and Product Generation Structure and deliverables.
Advertisements

The Euronet-PBL Project: Overview of the Work Plan Pekka Kämäräinen University of Bremen, ITB, Presented at the 1st International Meeting of the Euronet-PBL.
1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Data Capturing Infrastructure Stathis Plitsos, AUEB-RC.
IT Strategic Planning Project – Hamilton Campus FY2005.
SAMT - Sustainability assessment methods and tools to support decision-making in the process industries Introducing SAMT project Hanna Pihkola, VTT Introducing.
Digital Scheme Inspection. Android Based Application for Regular inspection accomplishment and reporting. It can be utilized by different Departments.
Tuesday, 8 th June 2004 Introduction Margaret Hanley Business Analyst/Senior Information Architect BBC Worked on three continents – Australia, USA and.
Development plan and quality plan for your Project
Planning Evaluation 1 Planning evaluation An example - ERDF Berlin Dr. Oliver Schwab IfS Institut für Stadtforschung und Strukturpolitik.
What is Business Analysis Planning & Monitoring?
Qatar Planning Council 1 Best Statistical Information to Support Qatar’s Progress Statistical Capacity Building for Information Society in Qatar.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP6 Communication and dissemination 10-11/07/2012COGEN Europe.
INCOME PROJECT TEMPUS SCM MEDA Scope Management Case Study: IPR Helpdesk Project.
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Energy Consumption Reduction Tool Angelo Frascella, Marco.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Overview of activities of the first six months and of the.
1 Bonham, chapter 8 Knowledge Management. 2  8.1 Success Levels  8.2 Externally Focused KM  8.3 Internally Focused KM  8.4 PMO-Supported KM
Requirements for the Course
UE Approach towards AUBI Design Patterns Adesh Singh 28 May 2008.
Ubiquitous Process Modelling Tool (Template and examples for usage) provided by: Dr. Thomas Richter, TELIT, University of Duisburg-Essen for usage of particular.
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 WP2 “Design and implementation of infrastructure capturing.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 Work Package 1 Title: ‘Analysis of the State of the Art and Development.
NCHRP Project 8-49 Procedures for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction Draft Guidebook.
Clara Puech European Projects Coordinator EGNATIA EPIRUS Foundation INTERREG III B CADSES Neighbourhood Programm “HERITOUR” November 2005.
MODA-TEL An IST project on Model Driven Architectures for Telecommunications System Development and Operation.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
BlogForever Project Presentation Vangelis Banos, Project Manager, ALTEC Software Stratos Arampatzis, Dissemination Manager, Tero Dr. Alexandra Cristea,
COFRET Delft Meeting 6./ WP 2.4: Future technologies and innovations relating to freight transport which are relevant for carbon footprint calculation.
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
RTQII Indicator Reporting
EU BON Meeting, Joensuu, March 2015 WP2 Task 2.3: Data sharing tools – Action Point MS232 : Technical workshop, review of documents, test versions of data.
1 MKUKUTA REVIEW AND EMERGING ISSUES FOR MKUKUTA II ANNUAL NATIONAL POLICY DIALOGUE Nov. 2009: Day 2: Friday 20 th Nov Ms. A. Mwasha/Prof.
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
Quality Assurance Procedure Virtual Meeting with QA experts.
Supported by The sole responsibility for the content of this presentation lies with the authors. It does not represent the opinion of the Community. The.
The Final Section: An Overview
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
Strategies for Knowledge Management Success SCP Best Practices Showcase March 18, 2004.
Company Confidential 1 AS9104/2A Oversight Standard Revision Report Tim Lee Project Chair September 11, 2012.
Regional Programme of Statistics in the Mediterranean Region MEDSTAT Phase II This project is funded by the European Union 1 Workshop on Data Compilation.
ANALYSIS FINDINGS AND CONCLUSIONS
Work Package 6 2nd Consortium meeting, Provincia di Reggio Emilia, 3rd May.2011 Blaz Jemensek, PIL Klemen Gostic, PIL.
MAP-IT! Review Meeting 5 March Brussels Project Next Steps Cybion Srl.
1 Information Day FP INNOV-6 Call for Proposals Entrepreneurial innovation: networking key players and users Action Networking innovation.
This research has received funding from the European Community’s Seventh Framework Programme (FP7/ ) under grant agreement No WP3 update.
Developments in Denmark and looking ahead Taskforce on Road Freight Statistics, 2 nd meeting, January 28, 2016 Peter Ottosen.
CARPE DIEM 4 th meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
TM 720: Statistical Process Control DMAIC Problem Solving
Task 4.2 Grid Coordination & DR Activation Module
UNIDO-GEF Industrial Energy Efficiency Project in Macedonia
WP8 - System controls and integration
EMI Project Processes and Tools
Dr Sally Priest, Flood Hazard Research Centre
Project Management Status
Hiring and Onboarding: Process Overview
BenchCan Core Group Meeting
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou


ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
Update Interim implementation report and financial statement (December 2006) request from the Commission for additional documents in February –
PLUG-N-HARVEST ID: H2020-EU
WP 1 Management and Coordination

CIM Cooperative Work Program (COOP)
WG 03 IoT Identifier Task Force Status 11/2017
LEARNING & DEVELOPMENT STRATEGY: PROCESS OVERVIEW
Presentation transcript:

1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 WP1 “Service monitoring the energy patterns of processes: design and implementation” State of advancement Dr. Jürgen Seibold, Frank Drews DITF-Denkendorf

2 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 WP1 Tasks and Deliverables DITF ENEA Domina AUEB D1.2 M9 D1.3 M9 D1.4 M20 D1.1 M6

3 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Overview of activities (1/2) 3 Task Activity / Leader, Contributors StatusComments T1.1 Interviews with participating companies and external companies / DITF, ENEA, Marc Cain, Piacenza  T1.1 Identification and description of use-cases and first draft of related data structures and services / DITF  T1.1 Setup of an questionaire used for validation user requirements / DITF, Euratex  T1.1 Setup of an IIG and validation of user requirements / Euratex ongoing

4 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Overview of activities (2/2) 4 Task Activity / Leader, Contributors StatusComments T1.2 Literature review for discovery, collection and analysis of existing indices/ ENEA T1.2 Execution of energy audits for PIACENZA / ENEA, Piacenza  T1.2 Execution of energy audits at Marc Cain / DITF, Marc Cain  T1. 2 Discussion of results with the IIG (Industrial Interest Group) to validate them and to try an extension to the Textile Sector / ENEA, Euratex T1.3 Mapping of Enterprise Data / DOMINA  First deliverable D1.1 in M6 T1.4. ARTISAN Services and Tools Definition, AUEB-RC ongoing Draft of D1.3 already available

5 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Final validation of the user requirements Submission of D1.1 ? Development of Key Performance Indicators D1.2 in month 9 D1.3 in month 9 Pending Tasks

6 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Six months planning Task / Leader / Activity April12Jul 12 T1.1 / Euratex + DITF validation of user requirements  T1.1 / DITF Writing the associated parts of D1.2  T1.1 / Euratex Writing the associated parts of D1.2  T1.2 / ENEA Development of Key Performance Indicators D1.2  T1.2 / DITF Description Energy Audit at Marc Cain for D1.2  T1.2 / ENEA Description Energy Audi at Piacenza for D1.2 T1.2 / ENEA Writing the associated parts of D1.2  T1.3 / Domina more Details on Information available in Enterprise Systems if needed for other tasks/service implemantation T1.4 / AUEB ARTISAN service list  T1.4 / Finialisation of D1.3 