1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.

Slides:



Advertisements
Similar presentations
05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
Advertisements

09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
1 CCSDS Security Working Group Fall 2008 Meeting October 2008 Berlin Germany.
CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
PS 1 16 June 2006 SEA CESG SUMMARY Rome, Italy, 16 June 2006.
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 CCSDS Engineering Steering Group: Report to the CCSDS Management Council (CMC) and Interagency Operations Advisory Group (IOAG): Fall 2010 BSI,
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
16 th – 19 th April 2012 Spring 2012 Meeting Agenda Darmstadt, Germany SOIS Application Support Services WG.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October, 2009 ESTEC, The Netherlands Takahiro Yamada, JAXA/ISAS.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
1 ROAD MAP OF THE CCSDS ARCHITECTURE WORKING GROUP (AWG) Draft, Issue March 2003 Takahiro Yamada, Chair, AWG.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/PARSONS November 2014 BSI, London.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Security WG: Report of the Spring 2005 Meeting April 14, 2004 Howard Weiss.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2012 Clevaland, Ohio, U.S.A. Takahiro Yamada, JAXA/ISAS.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
1 CCSDS 2007 Fall Meeting SOIS Plenary Chris Taylor Estec (27/09/2007.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Status of SSI Architecture Green Book Scott Burleigh, JPL Lena Braatz, Booz Allen Hamilton 2 November 2011.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
SEA-1 20 Nov 2014 CCSDS System Engineering Area (SEA): System Architecture WG (SAWG) Restart Peter Shames, SEA AD 20 Nov 2014.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
PS -0 System Architecture Working Group RASDS Status 14 June 2006 Peter Shames NASA / JPL
Overview of Space Communication Cross Support Architecture April 2013 Takahiro Yamada (JAXA/ISAS) 1.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
1 CCSDS Security Working Group Spring 2014 Meeting 31 March – 1 April 2014 Noordwijkerhout, The Netherlands Howard Weiss NASA/JPL/PARSONS* Identity crisis:
1 Document Status CCSDS Security Working Group March 2008.
1 CCSDS Security Working Group January 25 Telecon.
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
Security WG: Status Briefing BSI, London UK 10 November 2014 Howard Weiss NASA/JPL/PARSONS
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
1 Space Communications Cross Support Architecture WG: Charter and Work Plan April, 2009 Colorado Springs, CO, USA Takahiro Yamada, JAXA/ISAS.
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
Spacecraft Onboard Interface Services Application Support Services Working Group (SOIS-APP WG) CCSDS Spring 2013 Meeting.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
1 CCSDS Architectures: Issues and Proposals October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan May 2010 Portsmouth, Virginia, USA Takahiro Yamada, JAXA/ISAS.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACE INTERNETWORKING SERVICES (SIS) AREA
Space Communication Cross Support Architecture WG
Systems Architecture WG: Charter and Work Plan
Cross Support Architecture WG: Charter and Work Plan
Joint IPR/DAI Workshop
DER Growth Scenarios and Load Forecasts Working Group
Presentation transcript:

1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA

2 Objective (Present) Create a CCSDS Recommended Practice and a CCSDS Informational Report for Space Communication Cross Support Service Architecture. WORKING GROUP OVERVIEW Space Communication Cross Support Architecture Requirements Document Reference Architecture for Space Data Systems (RASDS) IOAG Cross Support Service Architecture IOAG Solar System Internetwork Architecture Description Document (SSI ADD) Space Communication Cross Support Architecture Description Document

3 STATUS Documents Green Book - The final draft Green Book was distributed for CESG review(March 2013). - Some comments were received and the book needs to be revised. - The revised book will be distributed for another CESG review after this meeting. Magenta Book - A draft is being produced.

4 GOALS FOR CLEVELAND MEETING Work on the received comments and agree on how to revise the book. Space Communication Cross Support Architecture Requirements Document Space Communication Cross Support Architecture Description Document Review the draft material.

5 CSAWG AGENDA Monday, 15 April 15:00Joint Session on Enterprise Model + Functional Resources 16:30CSA WG Introduction (Yamada) 17:00Discussion on RIDs against the Architecture GB (Shames and all) 18:00Adjourn Tuesday, 16 April 08:45Discussion on RIDs against the Architecture GB (Shames and all) 12:30Lunch 13:30Discussion on the Architecture MB (Shames and all) 17:00Meeting Summary (Yamada) 18:00Adjourn