Alessandro Italiano INFN – CNAF 26/09/2003 1/5 Status of the INFN - EDG testbeds Alessandro Italiano 7th DataGrid Conference.

Slides:



Advertisements
Similar presentations
WP1 Grid Workload Management Massimo Sgaravatto INFN Padova
Advertisements

– n° 1 Review resources access policy, procedures, rules and challenges: The Italian experience and future challenges Antonia Ghiselli INFN-CNAF Workshop.
SPGrid Activities in Italy Daniele Andreotti - Enrica Antonioli - Paolo Veronesi BaBarGrid Workshop Padova, Nov 2003.
INFN & Globus activities Massimo Sgaravatto INFN Padova.
CHEP 2000, Roberto Barbera NA3, NA4, and NA5 activities Milano, Università di Catania and INFN Catania - Italy ALICE Collaboration.
CHEP 2000, Roberto Barbera Roberto Barbera (*) GENIUS: a Web Portal for the GRID Meeting Grid.it, Bologna, (*) work in collaboration.
DataTAG WP4 Meeting CNAF Jan 14, 2003 Interfacing AliEn and EDG 1/13 Stefano Bagnasco, INFN Torino Interfacing AliEn to EDG Stefano Bagnasco, INFN Torino.
LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
Workload Management David Colling Imperial College London.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Presenter Name Facility Name EDG Testbed Status Moving to Testbed Two.
INFN Testbed1 status L. Gaido, A. Ghiselli WP6 meeting CERN, 11 December 2001.
CHEP 2000, Roberto Barbera The AliEn GENIUS interface ALICE Offline Week, CERN, Università di Catania and INFN Catania - Italy ALICE.
Deployment Team. Deployment –Central Management Team Takes care of the deployment of the release, certificates the sites and manages the grid services.
EU 2nd Year Review – Jan – Title – n° 1 WP1 Speaker name (Speaker function and WP ) Presentation address e.g.
– n° 1 VO Magic – Planck – Compchem in the production infrastructure.
INFN - Ferrara BaBarGrid Meeting SPGrid Efforts in Italy BaBar Collaboration Meeting - SLAC December 11, 2002 Enrica Antonioli - Paolo Veronesi.
E. Ronchieri – n° 1 EDG release 2 Elisabetta Ronchieri INFN CNAF - DataGrid WP1 – Workload Management System
Status of Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
INFN Testbed status report L. Gaido WP6 meeting CERN - October 30th, 2002.
C. Loomis – Testbed: Status… – Sep. 5, 2002 – 1 Testbed: Status & Plans Charles Loomis (CNRS) Sept. 5, th Project Conference (Budapest)
The EDG Testbed Deployment Details The European DataGrid Project
EDG - WP1 (Grid Work Scheduling) Status and plans Massimo Sgaravatto - INFN Padova Francesco Prelz – INFN Milano.
“Grey areas” of the new architecture Massimo Sgaravatto INFN Padova.
C. Loomis – Testbed Status – 28/01/2002 – n° 1 Future WP6 Tasks Charles Loomis January 28, 2002
INFSO-RI Enabling Grids for E-sciencE Logging and Bookkeeping and Job Provenance Services Ludek Matyska (CESNET) on behalf of the.
DataGrid is a project funded by the European Union CHEP 2003 – March 2003 – M. Sgaravatto – n° 1 The EU DataGrid Workload Management System: towards.
DataGrid WP1 Massimo Sgaravatto INFN Padova. WP1 (Grid Workload Management) Objective of the first DataGrid workpackage is (according to the project "Technical.
WP8 Status – Stephen Burke – 30th January 2003 WP8 Status Stephen Burke (RAL) (with thanks to Frank Harris)
CMS Stress Test Report Marco Verlato (INFN-Padova) INFN-GRID Testbed Meeting 17 Gennaio 2003.
C. Arnault – ATLAS RPMs- 14/03/ n° 1 ATLAS RPMs from CMT C. Arnault & C. Loomis
WNoDeS – Worker Nodes on Demand Service on EMI2 WNoDeS – Worker Nodes on Demand Service on EMI2 Local batch jobs can be run on both real and virtual execution.
DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 1 DataGrid Workshop INFN Testbed status report L. Gaido Oxford July,
Budapest, September 5th, 2002 DataGrid Accounting System DGAS Current status & plans Stefano Barale INFN Budapest, September.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks CREAM and ICE Massimo Sgaravatto – INFN Padova.
Prototyping production and analysis frameworks for LHC experiments based on LCG, EGEE and INFN-Grid middleware CDF: DAG and Parametric Jobs ALICE: Evolution.
30/07/2005Symmetries and Spin - Praha 051 MonteCarlo simulations in a GRID environment for the COMPASS experiment Antonio Amoroso for the COMPASS Coll.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Site Architecture Resource Center Deployment Considerations MIMOS EGEE Tutorial.
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
SAM Sensors & Tests Judit Novak CERN IT/GD SAM Review I. 21. May 2007, CERN.
Certification and test activity ROC/CIC Deployment Team EGEE-SA1 Conference, CNAF – Bologna 05 Oct
Ariel Garcia DataGrid WP6, Heidelberg, 26 th September 2003 Ariel García CrossGrid testbed status Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft.
Summary from WP 1 Parallel Section Massimo Sgaravatto INFN Padova.
EDG - WP1 (Grid Work Scheduling) Status and plans Massimo Sgaravatto INFN Padova.
Summary of the EDG review Some info for the next future of the WP1 software Massimo Sgaravatto INFN Padova.
Automatic testing and certification procedure for IGI products in the EMI era and beyond Sara Bertocco INFN Padova on behalf of IGI Release Team EGI Community.
M. Cristina Vistoli EGEE SA1 Organization Meeting EGEE is proposed as a project funded by the European Union under contract IST Regional Operations.
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
INFN GRID Production Infrastructure Status and operation organization Cristina Vistoli Cnaf GDB Bologna, 11/10/2005.
CERN Certification & Testing LCG Certification & Testing Team (C&T Team) Marco Serra - CERN / INFN Zdenek Sekera - CERN.
Probes Requirement Review OTAG-08 03/05/ Requirements that can be directly passed to EMI ● Changes to the MPI test (NGI_IT)
II EGEE conference Den Haag November, ROC-CIC status in Italy
– n° 1 Grid di produzione INFN – GRID Cristina Vistoli INFN-CNAF Bologna Workshop di INFN-Grid ottobre 2004 Bari.
1/3/2006 Grid operations: structure and organization Cristina Vistoli INFN CNAF – Bologna - Italy.
INFN/IGI contributions Federated Clouds Task Force F2F meeting November 24, 2011, Amsterdam.
CERN LCG1 to LCG2 Transition Markus Schulz LCG Workshop March 2004.
INFSO-RI Enabling Grids for E-sciencE Padova site report Massimo Sgaravatto On behalf of the JRA1 IT-CZ Padova group.
BaBar & Grid Eleonora Luppi for the BaBarGrid Group TB GRID Bologna 15 febbraio 2005.
Quattor installation and use feedback from CNAF/T1 LCG Operation Workshop 25 may 2005 Andrea Chierici – INFN CNAF
– n° 1 The Grid Production infrastructure Cristina Vistoli INFN CNAF.
Massimo Sgaravatto INFN Padova
BaBar-Grid Status and Prospects
The EDG Testbed Deployment Details
Presenter (on behalf of the authors): Cristina Vistoli
INFN – GRID status and activities
Report on GLUE activities 5th EU-DataGRID Conference
MonteCarlo production for the BaBar experiment on the Italian grid
Presentation transcript:

Alessandro Italiano INFN – CNAF 26/09/2003 1/5 Status of the INFN - EDG testbeds Alessandro Italiano 7th DataGrid Conference Heidelberg 26/9 – 1/10/2003

Alessandro Italiano INFN – CNAF 26/09/2003 2/5 INFN’s testbeds EDG Application testbed –CNAF and Padova INFN/EDG Development testbed focused on WP1 software –CNAF, Milano, Catania, Cagliari and Ferrara –Goals: Stress testing of the WP1 services and interface with the other WPs services Test the WP1 rpms before their release to speed up the integration process –Experiment’s applications used

Alessandro Italiano INFN – CNAF 26/09/2003 3/5 Resources in EDG Application testbed EDG 2.0.5: –CE, SE, UI, 2WNs, NE and MonBox EDG 2.0.5: –CE, SE, UI, 5WNs, NE and MonBox No core services

Alessandro Italiano INFN – CNAF 26/09/2003 4/5 INFN/EDG Development testbed Resources and Organization Resources: CNAF: –RB, BDII, TopMDS, RLS, MyProxy, CE, SE, UI, WNs Milano: –RB Catania: –RB, CE, SE, UI, WNs Cagliari: –CE, SE, UI, WNs Ferrara: –CE, SE, UI, WNs Organization Elisabetta Ronchieri as member both of Iteam and WP1 decides: –What development tag deployed by Iteam must be installed on the testbed –When only WP1 rpms must be upgraded WP1 members suggest what kind of tests to do The INFN testing group checks the new features and reports problems NOTEs: Information System: MDS RLS server configured

Alessandro Italiano INFN – CNAF 26/09/2003 5/5 INFN/EDG Development Testbed Results Several bugs have been found out and fixed Tested the interaction between WP1 and WP2 for data management –Jobs with the InputData and the OutputData attributes work The Babar Simulation Production Software has been tested on the testbed infrastructure. Jobs have been successfully executed using the standard EDG mechanisms as well as by means of the Genius portal Incoming tests –MPI jobs (they will start as soon as possible) –Interaction with VOMS (once the WP1 changes have been deployed) Future tests –DAG (job partitioning) –DGAS (in Torino) (Accounting)