CERN, 14 May 2012 8.5.3 Italy D.Boscherini. Budget disponibile CapitolokE Consumo75 M.E.20 Personale25 Totale120.

Slides:



Advertisements
Similar presentations
ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
Advertisements

Project Manager P. Paolucci deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
T1 status and plans INFN Genova November 2014 Collaboration Meeting.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Detector Systems Update MICO April 7, MICE Detector Systems  CKOV u Installed, first signals seen  TOF0/1 u 8 new H6533MOD assembly PMTs have.
ATLAS RPC: Cosmic Ray Teststand at INFN Lecce G. Chiodini, M. Bianco, E. Brambilla, G. Cataldi, R. Coluccia, P. Creti, G. Fiore, R. Gerardi, E. Gorini,
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Susanne Kersten, Wuppertal University November 21/22, 2013.
Erez Etzion, Tel Aviv University
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA H2020 Open Meeting,
FNAL testbeam planning Jan 27, 2014 Alain Bellerive.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
AMS TRD meeting Electronics 17th July 2002, CERN G. Schwering: Overview M. Capell: Crate Mechanics/Arrangement W. Karpinski: Front End – Status C.H. Chung:
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
RPC R&D collaboration meeting, CERN, High Energy Laboratory at INRNE, Sofia and RPC R&D collaboration High energy Physics Laboratory Scientific.
The ATLAS Pixel Detector
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
≈450 mm 50 x 220 mm 2 ≈450 mm 50 x 220 mm 2 Electronics boards Size: 50 x 220 mm 8 VMM chips à 64 ch Total: 512 ch/board Zebra contact Arrangement of electronics.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
Installation of the T600 at Fermilab CSN2, September 22,
Status Michael Moll CERN PH-DT Contents: WP8 – Task overview Status of tasks Status of Milestones and Deliverables AIDA 1 st Annual Meeting, DESY, Hamburg.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Environmental monitoring Continuous in-situ monitoring systems.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
The HyCal Calorimeter from PrimEx A. Gasparian NC A&T State University Greensboro, NC.
Long-term environmental effects on the ARGO-YBJ RPC array studied with the Detector Control System P. CAMARRI 1, R. CARDARELLI 1, L. PALUMMO 1, C. VIGORITO.
L.Vitale INFN and Univ. Trieste
Wander baldini on behalf of the SHIP Muon Group
LAV front-end and readout status
Radiation Monitor: Concepts, Simulation for an Advanced Read Out
Monitoring of radiation and environmental parameters at GIF++
WP8 – Improvement and equipment of irradiation beam lines
INRNE - Sofia AIDA - 1 RADIATION SENSORS for Integrated Dose for GIF++
10/month is the present production rate 2 FTE + sporadic contributions
Cosmic Ray Tracker and Detector Control System at the GIF++
To do list production organization and commitments
Pierluigi Paolucci - I.N.F.N. Naples
GEM-based Digital Hadron Calorimetry for SiD
AIDA 2020 Tel Aviv group.
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Presentation transcript:

CERN, 14 May Italy D.Boscherini

Budget disponibile CapitolokE Consumo75 M.E.20 Personale25 Totale120

AIDA ItemSub-itemInstitute in chargeResponsibleComment Cosmic ray set-up Detector INFN-BO INFN-RM2 G.Aielli Front-end electronicsINFN-RM2R.Cardarelli Power-supplies + cables INFN-NA INRNE S.Buontempo LV -> INFN-NA HV -> INRNE Gas system INFN-BA INFN-LNF S.Bianco DCS INFN-BO INFN-RM2 A.Polini Readout electronics / DAQ??MPI contacted Beam monitor set-up Detector + mechanics + cablesWeizmannG.Mikenberg Front-end electronics Technion Weizmann S.Tarem Gas system Technion Weizmann G.Mikenberg DCSTechnionS.Tarem Readout electronics / DAQ Technion weizmann ? Tel-Aviv to be contacted DCS INFN-BO INFN-RM2 NTUA A.Polini DAQNTUA + ??Need manpower! Environmental sensors INFN-LNF INFN-NA S.Bianco Radiation sensors INFN-BA INRNE P.Iaydjiev

AIDA ItemSub-itemInstitute in chargeResponsibleComment Cosmic ray set-up Detector INFN-BO INFN-RM2 G.Aielli Front-end electronicsINFN-RM2R.Cardarelli Power-supplies + cables INFN-NA INRNE S.Buontempo LV -> INFN-NA HV -> INRNE Gas system INFN-BA INFN-LNF S.Bianco DCS INFN-BO INFN-RM2 A.Polini Readout electronics / DAQ??MPI contacted DCS INFN-BO INFN-RM2 NTUA A.Polini DAQNTUA + ??Need manpower! Environmental sensors INFN-LNF INFN-NA S.Bianco Radiation sensors INFN-BA INRNE P.Iaydjiev INFN-BA: instantaneous rate? Items with INFN involvement