8621 Georgia Avenue Silver Spring, MD

Slides:



Advertisements
Similar presentations
ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Advertisements

Overview Waffle Slab.
Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
CTC 422 Design of Steel Structures
The Pennsylvania State University Architectural Engineering Structural Emphasis Advisor: Dr. Andres Lepage Steven Stein ROOSEVELT ISLAND SOUTHTOWN BUILDING.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
University Health Building Thesis Final Presentation
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
George Read Hall The University of Delaware
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
BWI Hilton Hotel Thomas Sabol The Pennsylvania State University
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Mathew Nirenberg AE Senior Thesis Structural Option.
1776 WILSON BOULEVARD ARLINGTON VIRGINIA Penn State University Senior Thesis 2012 Faculty Advisor: Thomas Boothby Joshua Urban Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Christopher Simmons l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Dr. Ali M. Memari Baltimore Hilton Convention Center Baltimore.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Computer Associates International, Regional Office
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
AE Senior Thesis 2009 U.S. Pharmacopeia Headquarters Consolidation Rockville, MD Analysis and Design of a Mild Reinforced One way slab with Post Tensioned.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Agricultural Hall and Annex Easting Lansing, MI
Lecture 39 - Design of Two-Way Floor Slab System
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

8621 Georgia Avenue Silver Spring, MD By: Nick Dastalfo Structural Option Advisor: Dr. Boothby

Site Conditions Location Existing Site

General Building Information Owner: Foulger-Pratt Development, LLC Number of Stories: 17 stories, 161 ft. Size: 347,009 ft.² Cost: $51 Million Structural Engineer: Holbert Apple Associates Construction: Beginning in 2015 Unique Features: Green Roof, Rooftop Pool

Existing Structural System Gravity System: Columns vary in concrete strength Mild-reinforced two way slab with drop panels Post-tensioned two way flat slab 7.25” depth, banded and distributed tendons Lateral System: Concrete shear walls Concrete Moment frames Foundation: Spread Footings

Typical Bay

Typical Bay 7.25” post-tensioned slab Columns: 16” x 24” Banded and distributed tendons 24’-0” 20’-0”

Gravity Spot Checks -Punching Shear Punching Shear - Int. Column C6 ΦVc117.65k > Vu=93.1k Punching Shear – Ext. Column C1 ΦVc103.04k > Vu=55.2k

Gravity Spot Checks -One Way Shear 22’-0” Direction H=7.25” ΦVc = 152.3k > Vu = 78.5k 20’-2” Direction ΦVc = 139.5k > Vu = 79.8k 20’-2” C6 22’-0”

Gravity Spot Checks -Moment Capacity Deflection Control 0.317” < 0.8” Load balancing

Design Alternates Alternate #1: Two Way Flat Plate Slab Alternate #2: Composite Steel Alternate #3: Non-Composite Steel

Two Way Flat Plate Slab Notes: Thickness = 9” Rebar fy=60ksi, Concrete f’c= 5ksi No drop panels

Two Way Flat Plate Slab Cost Depth Fire Lateral Options Conclusion Slight increase from 7.25” to 9” Fire Meets at least 2 hr requirement No additional fire-proofing Weight = 115 psf Cost $19.84/SF $0.32 savings per SF Lateral Options Concrete SW and MF Conclusion Heaviest Limited depth Viable Option

Composite Steel Notes: Deck= 2VLI18, 5in. NW Concrete topping Shoring Required 24’-0” 20’-0”

Composite Steel Depth Fire Weight = 75 psf Cost Lateral Options Increase from 7.25” to 21” Fire Meets 2 hr requirement with 3.5” topping Fire-proofing needed on beams and deck Weight = 75 psf Cost $18.48/SF Cheapest Lateral Options Concrete SW or Steel MF Conclusion Very Deep Shoring Viable but not efficient

Non-Composite Steel Notes: Deck= 1.5C18 3.5” NW Concrete Topping 24’-0” 20’-0”

Non-Composite Steel Cost Depth Fire Lateral Options Conclusion Increase from 7.25” to 21.5” Fire Meets 2 hr requirement with 5” topping Fire-proofing needed on beams and deck Weight = 60 psf Cost $27.60/SF Most expensive Lateral Options Concrete SW and MF Conclusion Lightest Very Deep Viable Option

Final Comparison

Thank You! Questions?