Transparent Re-alignment of the Diamond Storage Ring M. Apollonio – Diamond Light Source Ltd ESLS – XXII Workshop, ESRF Grenoble, November 25 th 2014 25/11/2014M.

Slides:



Advertisements
Similar presentations
Low Emittance Tuning (LET). Through Dispersion Free Steering.
Advertisements

XXII ESLS, Grenoble Basic approach to managing transverse coupling in Elettra: strategy and simulations S. Di Mitri S.
Author - Title (Footer)1 LINEAR LATTICE ERRORS AT THE ESRF: MODELING AND CORRECTION A. Franchi, L. Farvacque, T. Perron.
Ultra Low Vertical Emittance at the Australian Light Source Mark Boland on behalf of Rohan Dowd 1.
Dr. Zafer Nergiz Nigde University THE STATUS OF TURKISH LIGHT SOURCE.
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
Beam Based Survey and Alignment of Ring Magnets David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Experimental Plan for Achieving Low Emittance in CesrTA David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Girder Re-alignment using Survey and Beam Data M. Apollonio – Diamond Light Source Ltd. Low Emittance Design Workshop, ALBA (Barcelona), April 24 th 2015.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
Alignment and Beam Stability
Optimization of dynamic aperture for the ESRF upgrade Andrea Franchi on behalf of the ASD Beam Dynamics Group Workshop on Accelerator R&D for Ultimate.
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
Y. Ohnishi / KEK KEKB LER for ILC Damping Ring Study Lattice simulation of lattice errors and optics corrections. November 1, 2007 Y. Ohnishi / KEK.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
6. betatron coupling sources: skew quadrupoles, solenoid fields concerns: reduction in dynamic (& effective physical) aperture; increase of intrinsic &
Studies on Lattice Calibration With Frequency Analysis of Betatron Motion R. Bartolini DIAMOND Light Source Ltd FMA workshop, Orsay, LURE, 1 st and 2 nd.
FLS2006 Workshop, HamburgEduard Prat, DESY DISPERSION MEASUREMENT AND CORRECTION IN THE VUV-FEL (FLASH) Winni Decking, Torsten Limberg, Eduard Prat 37th.
Dynamic Aperture Study for the Ion Ring Lattice Options Min-Huey Wang, Yuri Nosochkov MEIC Collaboration Meeting Fall 2015 Jefferson Lab, Newport News,
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Methods for reaching ultra-low vertical emittance: the SLS experience Masamitsu Aiba, Michael Böge, Natalia Milas, Andreas Streun, PSI 1. Vertical emittance.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
1 Dynamic aperture studies in e+e- factories with crab waist IR’07, November 9, 2007 E.Levichev Budker Institute of Nuclear Physics, Novosibirsk.
An ultra-low emittance lattices for Iranian Light Source Facility storage ring Esmaeil Ahmadi On behalf of beam dynamics group Iranian Light Source Facility.
Emittance Tuning Simulations in the ILC Damping Rings James Jones ASTeC, Daresbury Laboratory.
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
1 BROOKHAVEN SCIENCE ASSOCIATES Impact of Errors and Damping Wigglers on the Lattice W. Guo 02/26/2009 NSLS-II ASAC Meeting Acknowledgement: M. Borland.
LCWS, UTA, Reaching ultra-low emittance at SLS through (systematic and) random optimization LCWS 2012 Joint CLIC/ILC Working Group – Damping.
Machine Operation and Studies at SSRF Wenzhi ZHANG Dec. 16, 2013 Spain.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Beam based alignment in storage rings Beam dynamics meet magnets II 02 December 2014 R. Bartolini Diamond Light Source and John Adams Institute, University.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
Diamond-II upgrade toward ultra-low emittance T. Pulampong University of Oxford Octoberfest October 2014 Royal Holloway, London.
Damping rings, Linear Collider School Low vertical emittance tuning Yannis PAPAPHILIPPOU Accelerator and Beam Physics group Beams Department CERN.
Off-axis injection lattice design studies of HEPS storage ring
Orbit Response Matrix Analysis
Diamond Light Source Status and Future Challanges
Sextupole calibrations via measurements of off-energy orbit response matrix and high order dispersion Nicola Carmignani.
Orbit Control For Diamond Light Source
Vertical Emittance at the Quantum Limit
Andrea Franchi (ESRF, Grenoble)
Low Emittance Tuning Tests at the Diamond Light Source (Rutherford Labs) Dec R. Bartolini, S. Liuzzo, P. Raimondi SuperB XV Meeting Caltech, CA,
Lecture A3: Damping Rings
Coupling Correction at the Australian Synchrotron
FCC-ee Lattice with Misalignments
3rd ATF2 Project Meeting, December 18-20, 2006
Low Emittance Tuning in CESR TA
H. Ghasem1,2 Y. PapaPhilippou2
Energy Calibration of the SPS with Proton and Lead Ion Beams
Status of Low Emittance Tuning at CESR TA
Simulation of the FCC-ee lattice with quadrupole and sextupole misalignments Sergey Sinyatkin.
Optics Measurements in the PSB
Ion Collider Ring Chromatic Compensation and Dynamic Aperture
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Multipole Limit Survey of FFQ and Large-beta Dipole
Compensation of Detector Solenoids
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
Multipole Limit Survey of Large-beta Dipoles
Integration of Detector Solenoid into the JLEIC ion collider ring
Upgrade on Compensation of Detector Solenoid effects
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
Error Sensitivity in MEIC
100th FCC-ee Optics Design Meeting
Presentation transcript:

Transparent Re-alignment of the Diamond Storage Ring M. Apollonio – Diamond Light Source Ltd ESLS – XXII Workshop, ESRF Grenoble, November 25 th /11/2014M. Apollonio – ESLS XXII - Grenoble M1 M2 1/15

-Motivations -Low Coupling -Alignment & Tests -Transparent Re-alignment (TR) -Conclusions 25/11/2014M. Apollonio – ESLS XXII - Grenoble Outline 2/15

25/11/2014M. Apollonio – ESLS XXII - Grenoble Why aligning the machine? - perfectly aligned machine ensures - nominal performance - nominal photon beam properties - misalignments minimized via orbit corrections - CMs (dipoles) correct orbit but introduce dispersion in both planes - CMs correct the orbit at BPMs - orbit can be ≠ 0 anywhere else - off axis orbit at quadrupoles - dipole kicks  more corrector strength  more dispersion - H dispersion errors  H emittance errors - V dispersion  V emittance (> quantum limit ~0.6 pm) - off axis orbit at sextupoles - dipole kicks - tune shift (H offset at sextupoles makes a normal quad) -  -beating - betatron coupling (V offset at sextupoles makes a skew quad) - dynamic aperture reduction - lifetime increase - … these distortions can become relevant especially at low coupling... Motivations Coupling Alignment Tests TR Conclusions 3/15

In response to request from Science Division, vertical emittance has been reduced from 27 pm.rad to 8 pm.rad for user operation (1% to 0.3% coupling)  Initially confined to machine development periods  Two week period from 17 th October to 1 st November 2012  Standard operational mode since 6 th March 2013 Benefits include increased brightness / transverse coherence, smaller spot size 1% coupling 0.3% coupling Reduced Vertical Emittance 25/11/2014M. Apollonio – ESLS XXII - Grenoble Motivations Coupling Alignment Tests TR Conclusions 4/15

25/11/2014M. Apollonio – ESLS XXII - Grenoble dR S Survey Data dZ S H-plane V-plane > 1mm sway Survey March 2014 Survey August 2014 Motivations Coupling Alignment Tests TR Conclusions > 600um heave 5/15 best fit plane MOPRO099, IPAC um

- AT model - MATLAB functions change magnet positions according to survey - girder  (sway,yaw, heave,pitch) - quadrupoles/sextupoles magnetic centres moved w.r.t. to girder according to data - residuals <50um - BPM positions in the model defined accordingly - primary fixed to floor - secondary anchored to girder DX YAW QUAD SEXT BM Girder moves – model 25/11/2014M. Apollonio – ESLS XXII - Grenoble primary BPM secondary BPM Motivations Coupling Alignment Tests TR Conclusions 6/15

25/11/2014M. Apollonio – ESLS XXII - Grenoble Girder moves – initial tests (2013) - 5-cam axis motor (u,v,  ) - rack in-tunnel: local control - single girder moves - temporary protection system limit excessive strain on bellows - preliminary to program of full SR re-alignment - reinforce confidence in model - gain confidence in control system GirderHeave/Sway (um)Yaw/Pitch (urad)Date HC3G VC20G VC8G VC2G VC13G VC3G VC3G VC4G VC3G Motivations Coupling Alignment Tests TR Conclusions - model highly predictive VC8G2 heave=+197um - CM variation correctly reproduced when BBA corrections are introduced in the model (as done in the machine) 7/15

25/11/2014M. Apollonio – ESLS XXII - Grenoble Girder moves – transparent re-alignment (TR) Motivations Coupling Alignment Tests TR Conclusions - leading idea: re-align the machine with no impact on operating beamlines - orbit variations compensated by introducing Golden Offsets at primary BPMs - initial single girder tests (I03)  TR project: Cell-4, 5, 6: (I05) MOPRO101, IPAC2014 8/15

25/11/2014M. Apollonio – ESLS XXII - Grenoble CELL move – control system 2013 – single girder move - local rack (inside tunnel) - temporary LVDT sensors (on girder bellows) - local PC 2014 – cell (multi-girder) move - CIA rack (outside tunnel) - 8 permanent LVDT sensors per cell - EPICS with PC from control room Motivations Coupling Alignment Tests TR Conclusions PLC LVDTs 9/15

25/11/2014M. Apollonio – ESLS XXII - Grenoble LVDT motion sensors G2 – G3 CAM motors View of cell-4 LVDT motion sensors G3 end Motivations Coupling Alignment Tests TR Conclusions CELL move – control system 10/15

25/11/2014M. Apollonio – ESLS XXII - Grenoble 1 st test of transparent re-alignment at BL-I03: BBA and orbit restoration via Golden Offset (1) (2) 22/10/2013 VC3G1 heave = -245 um pitch = urad GO =191 um model data (A)BPM offset after BBA cell-3 (A)Orbit after move (B)Effect of BBA (C)Effect of GO(3,1) = 181um XBPM-measured tilt: -28.7urad / AT prediction: -28. urad VC3G1 - 22/10/2013 heave = -245 um pitch = urad MOPRO101, IPAC2014 Motivations Coupling Alignment Tests TR Conclusions (SP,  ) = (-95um,-28urad) 11/15

25/11/2014M. Apollonio – ESLS XXII - Grenoble Motivations Coupling Alignment Tests TR Conclusions getting ready for TR at BL-I05 (1) (2) VC4G2+G3 heave G2= -275 um G3 = -250 um pitch G2 = 15 urad G3 = -17 urad ID um C2 C3 C4 C5 C6  SP=-150um  a = 27urad 12/15

25/11/2014M. Apollonio – ESLS XXII - Grenoble getting ready for TR at BL-I05: BBA (1) and orbit restoration via Golden Offset (2) (1) (2) ID um Motivations Coupling Alignment Tests TR Conclusions  SP= 0um  a = 0urad GO=239 um VC4G2+G3 heave G2= -275 um G3 = -250 um pitch G2 = 15 urad G3 = -17 urad (SP,  ) = (-150um,27urad) (SP,  ) = (0um, 0urad) 13/15

25/11/2014M. Apollonio – ESLS XXII - Grenoble getting ready for TR at BL-I05: effect of orbit tilt on I05 energy peaks (SHADOW simulation) Motivations Coupling Alignment Tests TR Conclusions (He-photo ionization peaks, data from BL-I05) 14/15

25/11/2014M. Apollonio – ESLS XXII - Grenoble Conclusions - aligning the Diamond Storage Ring represents a benefit in terms of reduced vertical emittance - increase stability on feedback for present low coupling system - model of girder moves available (AT) - very precise when determining local effects (girder moves) - a campaign of survey-based girder moves has been completed - using a 5-axis control system - 1-H and 8-V moves actuated so far - gained great knowledge both of the control system and of the model - 1 st test of TR done (Oct 2013, vC3G1, I03) - now extended to multi-girder moves, possibly distributed on the entire machine - cell 4, 5 and 6 equipped with new control system and commissioned - cell-4 scheduled for move: Dec 19 th - preliminary tests to assess effects on nearby BL-I05 - aim at completing cell-5, cell-6 before May Motivations Coupling Alignment Tests TR Conclusions 15/15

25/11/2014M. Apollonio – ESLS XXII - Grenoble Thanks for your attention...

25/11/2014M. Apollonio – ESLS XXII - Grenoble Spares Camshaft Axes of rotation Bearing Range of motion Beam Direction Mover 1 Mover 2Mover 3 Mover 4 Mover 5 GIRDER CELL move – control system: CAM-axes

25/11/2014M. Apollonio – ESLS XXII - Grenoble CELL move – control system: CAM-axes PLC interface – LVDT readings All cams in their neutral position,: u=0, v=0, χ =0, η =0, σ =0. Pitch of 4.16 mrad: u=0, v=0, χ = , η =0, σ =0. Spares

25/11/2014M. Apollonio – ESLS XXII - Grenoble Spares Summer 2012 uncontrolled girder motion “CELL-25” test Importance of LVDT limiting sensors

25/11/2014M. Apollonio – ESLS XXII - Grenoble Girder moves – initial tests - model highly predictive when describing changes - orbit variation correctly reproduced - CM variation correctly reproduced - local reduction in total CM kick angle reasonably reproduced original position new position C03 G1 G2 G3 HC3G2 sway=+324um Spares

25/11/2014M. Apollonio – ESLS XXII - Grenoble Girder Moves explain 2/3 of the H-orbit. In V-orbit there is phase agreement, amplitude is not reproduced. Girder moves – effect on orbit Spares

couplinglifetimecurrent Coupling feedback started 25/11/2014M. Apollonio – ESLS XXII - Grenoble Reduced Vertical Emittance Spares

25/11/2014M. Apollonio – ESLS XXII - Grenoble Reduced Vertical Emittance Setting the vertical emittance: LOCO correction during start-up Apply correction to all skews Add offset to set desired ε y value Use feedback to stabilise during user time Issues: Coupling correction only optimal for a particular configuration of ID gaps Quality of correction drifts over days / weeks  pLOCO measurement and fit: 15m!  Begun girder re-alignment campaign to increase margin between minimum and desired ε y values MOPEA071, IPAC2013 Spares

25/11/2014M. Apollonio – ESLS XXII - Grenoble Survey August 2013 H-plane Survey January - August 2013 V-plane SR shrinking:  RF C SR = c h / RF measured circumference Motivations Coupling Alignment Tests TR Conclusions best fit plane MOPRO099, IPAC um