Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.

Slides:



Advertisements
Similar presentations
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Advertisements

MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
ADTX Threshold Scan RIKEN/RBRC Itaru Nakagawa 1. Run13 ADTX Threshold Scan March 3, 2013 MUID1D HV=Run12 Nominal Setting MuTrig e-Log entry=#
AR3BL2 Measurements at Penn 3 rd Assembled board November 9 04 FMN.
AR3BS1 #3 November 19, 2004 Mitch and Anton. Measurements DLL Lock works in all positions Timing scan shows expected ranges of BX and DX operation Voltage.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
South Arm FEE Performance Prior to Au run, all FEMs installed and working. Currently, 157 of 168 FEMs read out useful data. = 93.5% operational FEM losses:
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
PROBE CARD INTEGRATION IN pALPIDEfs TEST SYSTEM ALICE | ITS-MFT Mini-Week | | Markus Keil.
MuTr Recap Status and Plan. Plan We are shooting for North Station-1 for post Run10 shutdown installation. Best scenario is to mount portable “clamp”
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
Performance of PHENIX High Momentum Muon Trigger 1.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
South SG1 Trigger High Rate Sanghwa Park, Katsuro Nakamura, Yoshimitsu Imazu, and Itaru Nakagawa 1.
South SG1 Trigger High Rate Sanghwa Park, Katsuro Nakamura, Yoshimitsu Imazu, and Itaru Nakagawa 1.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
9/25/08J. Lajoie - Muon Trigger Upgrade Review1 Muon Trigger Upgrade LL1 Electronics Iowa State University John Lajoie Cesar Luiz daSilva Todd Kempel Andy.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
1 The PHENIX Muon Identifier Front End Electronics Andrew Glenn (University of Tennessee), for the PHENIX collaboration Andrew Glenn 5/1/01 April APS Meeting.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
Performance of PHENIX High Momentum Muon Trigger.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
R&D for Muon Trigger Upgrade Naohito Saito (Kyoto/RIKEN/RBRC)
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Performance of PHENIX High Momentum Muon Trigger.
Ordinal Number. RightLeft 1st animal from the left. 1st.
Onsite Status RIKEN/RBRC Itaru Nakagawa. OASys Light Source Spacer.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
In the (rare) normal operation mode main actions for editing the settings of the muon system and for checking the configuration and the noise level of.
MuTRG Channel map summary June 30, 2008 Tsutomu Mibe KEK 1.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Run11 MuTrig Performance RIKEN/RBRC Itaru Nakagawa 1.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
06/22/04J. Lajoie – Santa Fe Muon Workshop1 Level-1 Triggers for Run-5 Outline –Vertex Triggers : BBC, ZDC (not discussed here) BBC will have ability.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
MuTrg/Mutr Optimization Yoshi-mitsu Imazu. ● Mutr Lv1 timing scan Adjustment of Lv1 timing Online/Offline shape cut values ● Mutrg threshold scan → Better.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
RPCs for the W measurement in PHENIX Chong Kim Korea University Japan-Korea PHENIX collaboration workshop, Nov. 27, 2012 for the PHENIX collaboration.
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
Non-aligned code P1.0 is toggled at program start and used for scope trigger to indicate program start P1.0 toggles 4 times during for loop with 0,5s delay.
Seyoung Han / Ewha Woman’s Univeristy
RPC FEE The discriminator boards TDC boards Cost schedule.
East West Move to Table 2 N/S
BUCKEYE has internal shift register which controls calibration
Progress on the 40 MHz SEU Test System based on DE2 Board
Presentation transcript:

Post Run13 MuTR/MuTrig Maintenance 1

Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2

High Noise Rate in South St-1 Oct-3 Gap-2 3

North Station-3 Octant-1 North Station-3 Octant-1 stands outSee next page for gap decomposition 4

North Station-3 Octant-1 Gap-2 <-Gap-1 is OK 5

South HV 6 Been bad from the past. Attempted to fix during Run12 shutdown. But couldn’t fix. Cause may be inside.

MuTr HV Trip History Run13 North South * HV trip due to communication failure are excluded Lost HV module 90days N311 N331 N351

North Arm WestEast Station-1 Noisy ADTX Check grounding & trippy HV Noisy ADTX Check grounding & trippy HV Station-2,3 8 Need to change FEE boards S3 O2 C S3 O7 C S1 Q3 C3 HV St-3 Oct4 N341-0 Oct-3 Anode Trippy HV Oct-5 Anode Trippy HV

South Arm West East Noisy ADTX Check Grounding Noisy ADTX Check Grounding Station-2, ,11138 S3 O5 C S2 O3 C S3 O4 C5 HV St3, Oct1 S311-0 (couldn’t fix) HV St3, Oct7 S371-6 (couldn’t fix)

MuTr RX Card Debugging (1) RX card transmits electrical signal to optical. We have only 3 spare good boards and 7 spare boards to be debugged. To be tested at John Haggerty’s test bench. 10 MUTR FEE RX card DCM opticalelectrical

MuTr RX Card Debugging (2) 11

MuTr fiber labeling Redo MuTr fiber labeling at DCM. The new label suppose to have Module# and dsp# as well. 12

Debugging MRG FPGA Symptom South Octant-1Constant Rates (Threshold dependent) South Octant-3Excursion w/ time constant of ~20minutes North South Run12 Octant-1 Cosmic SG1~50kHz Run12 Octant-1 Physcs SG1~1kHz Plot by Dahee (Ewha University) South Octant-3 Above two octants are running with older version of MRG FPGA in Run13. Both are observable with cosmic circumstances FPGA: verilog HDL 13

BACKUPS 14

Numbering Skeme 15

Summary So far high rates in both Oct-1 and Oct-3 are both disappears with down graded MRG FPGA code. Whether we run with mixed two FPGA code? Down grade all octants? Confirm stability using cosmic as long as possible. 16

When did this started? 17 FPGA Upgrade (Mar. 28, 2012) FPGA Upgrade (Mar. 28, 2012) - runtype: CALIBRATION data - triggerconfig: PP510Run12_Cosmic - run time > 10 min - MUIDLL1_N1D||S_1D trigger enabled. 40kHz S_SG1 rate Octant-3 Threshold=20mV for Cosmic Runs. Run Rate[kHz]

Run13 Threshold Response of Octant-1 North South Run12 Octant-1 Cosmic SG1~50kHz Run12 Octant-1 Physcs SG1~1kHz Plot by Dahee (Ewha University) 18 Run12 Cosmic Rate ~40kHz is consistent with present measurement. Physics run was operated at 30mV and likely to be operated around 1kHz.

Time dependent rate in Run12 Cosmic 19 mrg_prom021 mrg_prom036 S_SG1 Rate No indication of Oct-3 High rate excursion. Hidden under Oct-1 40kHz? Need Time dependent LL1SG1 rate Oct-by-Oct -> Josh developed in the past?

Long Time Monitoring Excursion 20

Octant-1 Diagnosis Station-1, Station-2 Mask Station-3b (done) Chip scope measurement using LL1 fire as trigger of chip scope Check the communication between MRG and LL1. How we know the communication error? Check the timing alignment error. Play with delay scan level-1 internal clock.(require LL1 FPGA modification) Perform MRG (process) delay scan (all stations at once) more precisely (to find the timing when LL1 started to fail align), 21

North Arm WestEast Station-1 Noisy ADTX Check grounding Noisy ADTX Check grounding Station-2,3 22 Need to change FEE boards S3 O2 C6

South Arm West East Noisy ADTX Check Grounding Noisy ADTX Check Grounding Station-2,3 23