US CMS DOE/NSF Review: May 8-10, 20011 US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.

Slides:



Advertisements
Similar presentations
COST CONTROL - EARNED VALUE 1.0. EARNED VALUE - INTRODUCTION
Advertisements

Project Management Concepts
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
1 What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
Mark Reichanadter LCLS FAC October 29-31, 2007 Report to the LCLS Facilities Advisory Committee Project Management Project.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Gantt Charts Trisha Cummings. The History Henry Laurence Gantt's legacy to management is the Gantt chart. Henry Laurence Gantt ( ) was a mechanical.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Earned Value Management
Cost Management Week 6-7 Learning Objectives
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Office of Project Management Metrics Report Presentation
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Software Project Management (SPM)
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
Earned Value management This presentation is just a short introduction to a few terms and concepts. I am sure there will be training sessions in the next.
Chapter 9 Project Development. What to manager Client experience  Clients are very important  Happy or not is largely dependent on their expectations.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
1 Lecture 4.3b: Earned Value as the Cost and Schedule Metric (SEF Ch 14) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
1 Alternative EVM Applications Not a One-Size-Fits-All.
DOE/NSF Review May 8-10, US CMS US CMS Detector Project Overview Dan Green US CMS Project Manager DOE/NSF Lehman Review, May 8-10, 2001.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
Module 11 Session 11.1 Visual 1 Module 11 Executing and Controlling the Work Session 11.1 Managing Execution: Executing and Controlling the Work.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
Project Cost Management
Project Management Methodology
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
UEC User’s Meeting - June 11, US CMS Status Dan Green US CMS PM June 11, 2002.
Where Module 04 : Knowing Where the Project Is 1.
Project Management Information System What?? Objective: –Record & report relevant information and status of various components of project –Highlight the.
SOFTWARE PROJECT MANAGEMENT
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Lukens - 1 Contingency Reduction Review – 27 May 2005 The Run IIb CDF Detector Project Contingency Reduction Discussion Patrick T. Lukens Fermilab 27 May.
PROJECT MANAGEMENT AND CONTROL
Establishing and Managing a Schedule Baseline
Project Cost Management
Earned Value - What is it
LSST Project EVMS Performance Overview Kevin E
Monitoring and Reporting Project Progress
Earned Value Management
MS Project Add-on for Earned Value Analysis Reporting
Presentation transcript:

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001

US CMS DOE/NSF Review: May 8-10, OutlineOutline Overview Status and Performance US CMS Cost Performance Report Work Scheduled, Work Performed, Obligations, Actuals Cost and Schedule Variances and Indices Cost Experience L2 CPR’s, M&S and Labor Performance Schedule Performance L2 Schedule Variances L1, L2, L3 Milestone Performance Schedules and Critical Paths (CMS, EMU, HCAL, ECAL) Contingency Assessment Base vs Scope Issues & Summary

US CMS DOE/NSF Review: May 8-10, US CMS C&S (Philosophy) The US CMS Project is organized into 9 separate L2 subsystem files (MS Project) where cost and schedule estimates and progress are maintained and reported against. The L2 MS Project files are used as the sole source of cost and schedule information, and changes are approved through change control. In an effort to actively manage each L2 subsystem and maintain the most accurate planning model, changing the project file to better reflect current knowledge is encouraged. Provides the earliest possible warning of weak spots A stale plan is a less useful management tool “Plan the Work - Work the Plan” Each month, 9 updated L2 files are submitted to the PO, with % complete progress and possible ~45-50 changes to the US CMS ‘approved’ plan.

US CMS DOE/NSF Review: May 8-10, US CMS C&S (Philosophy) US CMS believes that revising the plan when the previous model is no longer relevant is essential to US CMS communication and coordination, and also promotes active management. Tracking and reporting are more challenging. Assessing performance is more difficult since traditional reference points are often reset. US CMS has a fixed TPC = $167.25M, a defined set of deliverables, and is matched to the global CMS schedule. Because US CMS is now in the later phases of the project (54% complete), more emphasis is placed on performance and less on cost estimates. US CMS uses an ‘Earned Value’ system to report and assess our cost and schedule performance. BCWS (Budgeted Cost of Work Scheduled-What did you plan to do?) BCWP (Budgeted Cost of Work Performed-What did you do?) ACWP (Actual Cost of Work Performed.-What did it cost?)

US CMS DOE/NSF Review: May 8-10, US CMS Performance Mar01 (AY$) Ignoring CP & PO, BCWP/BCWS still about 88%.

US CMS DOE/NSF Review: May 8-10, BCWS, BCWP, Obl. & Actuals Work scheduled attempts to saturate BA. Some early problems with accounting of Est. Actuals. 34 months of reporting. Trends are fairly linear. US CMS is technically limited.

US CMS DOE/NSF Review: May 8-10, Cost and Schedule Variance Cost Variance (P-A) Can be misleading when rolled up to a high level. A cost overrun (-) can be cancelled out by invoice lag (+). Schedule Variance (P-S) Fairly constant in recent months.

US CMS DOE/NSF Review: May 8-10, Cost and Schedule Performance Indicators SPI (BCWP/BCWS) fairly consistent at ~85-88%. Ignoring CP & PO, BCWP/BCWS ~88%. Trends indicate slightly behind on planned work, and under- running cost (invoice lags and large multi-year contracts).

US CMS DOE/NSF Review: May 8-10, US CMS L2 Cost Performance Reports Tracks actual costs vs budgets (in AY$) at lowest WBS for each L2 system. New cost tool for US CMS.

US CMS DOE/NSF Review: May 8-10, Cost Experience - M&S Current cum BCWP is ~74 AYM$. 22 M&S contracts account for ~36 AYM$ or 49% of our BCWP.

US CMS DOE/NSF Review: May 8-10, Cost Experience – Labor HCAL Optics Production-(FNAL L5, L8) Total labor for this task ~ 1.8 M$

US CMS DOE/NSF Review: May 8-10, Cost Experience – Labor EMU CSC Production-(FNAL L8, MP9) Total labor for this task ~ 3.5 M$

US CMS DOE/NSF Review: May 8-10, Major Schedule Variances We actively monitor and discuss US CMS subsystem schedule variances during L1/L2 monthly meetings.

US CMS DOE/NSF Review: May 8-10, CMS Schedule CMS Schedule CMS is currently following the V31 planning schedule Includes a ‘working detector’ w/colliding beam “pilot run” in April Shutdown from May 2006 to July 2006 (pixels, EE-, IT) Ready for full year of LHC operation in July US CMS has adopted the V31 model and has aligned its I&C effort (FY04-FY05) to be in phase with CMS. Draft L1, L2, and L3 milestones consistent with V31 are in development and will be processed through change control when approved by the LHCC and CMS (estimate rebaseline in July 2001). Mostly affects FY04-FY05. LHCC, CMS, and US CMS presently report on milestone progress wrt Aug 99 LHCC baseline (v27).

US CMS DOE/NSF Review: May 8-10, US CMS Schedule US CMS Schedule Currently, the majority of the US CMS effort is in the production of deliverables here in the US. US CMS has assumed responsibilities for major deliverables and its subparts (vertical integration) allowing some autonomy in managing the factories in the US. US CMS takes the approach to go as fast as possible when technically ready. This allows an increase in overall schedule slack and reduced risk wrt V31.

US CMS DOE/NSF Review: May 8-10, CMS SX5 V31 Schedule CMS SX5 V31 Schedule

US CMS DOE/NSF Review: May 8-10, CMS UX5 V31 Schedule CMS UX5 V31 Schedule

US CMS DOE/NSF Review: May 8-10, US CMS L1 & L2 Milestone Performance (V27) Define at EDR Fall 01?

US CMS DOE/NSF Review: May 8-10, US CMS L1 & L2 Milestone Performance (V27) No approved Silicon Tracker milestones Redesign Mechanics + crystal boule Near CP

US CMS DOE/NSF Review: May 8-10, EMU Critical Path (v6)

US CMS DOE/NSF Review: May 8-10, HCAL Critical Path-r11

US CMS DOE/NSF Review: May 8-10, ECAL Critical Path (v6)

US CMS DOE/NSF Review: May 8-10, US CMS Project Contingency Allocation (AY$)

US CMS DOE/NSF Review: May 8-10, US CMS Contingency Allocation Scope increases are modest. Most contingency applied to base to maintain schedule

US CMS DOE/NSF Review: May 8-10, Lehman Review – Oct00 On schedule and on budget Areas in need of improvement Milestone coordination (CMS, US CMS, Agencies, L2 Groups, L3 groups, non-US groups, etc.) Mostly done, continue to work with CMS. Continue effort WBS Tracking System in PO to accurately measure budget/actuals at lower levels. L2 CPR’s, continue to refine/improve EMU (continue to work on coordination) I&C plan is improved HCAL (need a few wins, RBX, HPD, HF) Some solutions are near. ECAL (continue to refine schedule) US has a CP analysis. ECAL is on CMS CP. Installation and commissioning I&C and M&O plans are converging. Cost and Schedule Issues Last Review

US CMS DOE/NSF Review: May 8-10, Cost Performance Summary – May01 How much have you spent? Are you under, over, or on-budget? Total US CMS Cost = $64,554K (Mar01). We are On Cost Historically large M&S purchases and labor experience at two major factories indicate US CMS ~on cost. At a low WBS level, L2 CPR’s shows no significant cost overruns. Actuals lag behind BCWP by ~13%. Lag adds uncertainty but tracks ~linearly with BCWP.

US CMS DOE/NSF Review: May 8-10, Schedule Performance Summary – May01 Are you on schedule? If not, where are you slipping? What are the implications? What are you doing about it? We are On Schedule (matched to V31). US CMS Schedule tools are consistent BCWP/BCWS analysis from % complete. Milestone tracking, Schedule Variance. Critical Path analysis for US CMS tasks, and SX-5/UX5 I&C. L1/L2 monthly meetings (work-arounds).

US CMS DOE/NSF Review: May 8-10, Cost & Schedule Issues May01 Areas to work on in next 6 months; Rebaseline milestones consistent with V31 Change control improvements within CMS being developed Continue to improve L2 CPR’s. Cost performance is key in later stages of project. Implement ‘rolling close out’ of completed WBS#’s. EMU Overall Performance, parts flow, handoff to CERN, I&C HCAL RBX production, HPD production, HF (fiber, PMT’s) SiTrkr Parts flow, coordinate production start. Continue to improve I&C and M&O planning