Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 1 Calibrazioni del calorimetro: esperienze (L3) e prospettive Egidio Longo.

Slides:



Advertisements
Similar presentations
INFN Milano, Universita` degli Studi Milano Bicocca Siena IPRD May Testbeam results of the CMS electromagnetic calorimeter Alessio Ghezzi.
Advertisements

STAR Status of J/  Trigger Simulations for d+Au Running Trigger Board Meeting Dec5, 2002 MC & TU.
1 ALICE EMCal Electronics Outline: PHOS Electronics review Design Specifications –Why PHOS readout is suitable –Necessary differences from PHOS Shaping.
Il Calorimetro Elettromagnetico di CMS Riccardo Paramatti CERN & INFN – Roma1 IFAE 2005 Catania 31/03/2005.
1 AHCAL answers IDAG Erika Garutti On behalf of AHCAL analysis team.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group 10th ICATPP Conference on Astroparticle,
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
1 Hadronic In-Situ Calibration of the ATLAS Detector N. Davidson The University of Melbourne.
ECAL TIMING. 20/04/092 Ratios’ Method Basics Position of pulse maximum parameterized using the ratio of two consecutive samples, i.e., R = A(t)/A(t+1)
FMS review, Sep FPD/FMS: calibrations and offline reconstruction Measurements of inclusive  0 production Reconstruction algorithm - clustering.
Cosmic Rays Data Analysis with CMS-ECAL Mattia Fumagalli (Università di Milano Bicocca) CIAO!
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
Intercalibration of the CMS Electromagnetic Calorimeter Using Neutral Pion Decays 1 M. Gataullin (California Institute of Technology) on behalf of the.
CMS ECAL 2006 Test Beams Effort Caltech HEP Seminar Christopher Rogan California Institute of Technology May 1, 2007.
The Design of Barrel Electromagnetic Calorimeter (BEMC) October Lu Jun-guang.
LCG Meeting, May 14th 2003 V. Daniel Elvira1 G4 (OSCAR_1_4_0) Validation of CMS HCal V. Daniel Elvira Fermilab.
Monitoring system of the LHCb electromagnetic calorimeter NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
ELECTROMAGNETIC CALORIMETER at CMS EVANGELOS XAXIRIS June 2005 Experimental Physics Techniques.
Photodetection EDIT Internal photoelectric effect in Si Band gap (T=300K) = 1.12 eV (~1100 nm) More than 1 photoelectron can be created by light in silicon.
Napoli Doct. School 9 JULY 07 1 DRELL-YAN /Z/Z q q e,e, e+, +e+, +
The CMS Electromagnetic Calorimeter Roger Rusack The University of Minnesota On behalf of the CMS ECAL collaboration.
Event Reconstruction in SiD02 with a Dual Readout Calorimeter Detector Geometry EM Calibration Cerenkov/Scintillator Correction Jet Reconstruction Performance.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
CMS ECAL Laser Monitoring System Christopher S. Rogan, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
Possibility of tan  measurement with in CMS Majid Hashemi CERN, CMS IPM,Tehran,Iran QCD and Hadronic Interactions, March 2005, La Thuile, Italy.
Kati Lassila-Perini/HIP HIP CMS Software and Physics project evaluation1/ Electron/ physics in CMS Kati Lassila-Perini HIP Activities in the.
1 Energy loss correction for a crystal calorimeter He Miao Institute of High Energy Physics Beijing, P.R.China.
Coseners House Forum on LHC Startup 13th April 2007 David Futyan Imperial College 1 David Futyan Imperial College Calibration of the CMS ECAL Using Vector.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
PHOTON RECONSTRUCTION IN CMS APPLICATION TO H   PHOTON RECONSTRUCTION IN CMS APPLICATION TO H   Elizabeth Locci SPP/DAPNIA, Saclay, France Prague.
One,Two pion channels from PE target August 2014 (~10 hours of beam) 50 MLN events (1.2 shift) Day 232/233 Piotr & Witek.
R.S. Orr 2009 TRIUMF Summer Institute
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
1 1 - To test the performance 2 - To optimise the detector 3 – To use the relevant variable Software and jet energy measurement On the importance to understand.
Georgios Daskalakis On behalf of the CMS Collaboration ECAL group CALOR 2006 – Chicago,USA June 5-9, 2006 CMS ECAL Calibration Strategy.
The CMS electromagnetic calorimeter
From the Standard Model to Discoveries - Physics with the CMS Experiment at the Dawn of the LHC Era Dimitri Bourilkov University of Florida CMS Collaboration.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
 0 life time analysis updates, preliminary results from Primex experiment 08/13/2007 I.Larin, Hall-B meeting.
Studies of Electroweak Interactions and Searches for New Physics Using Photonic Events with Missing Energy at the Large Electron-Positron Collider Marat.
Calibration of energies at the photon collider Valery Telnov Budker INP, Novosibirsk TILC09, Tsukuba April 18, 2009.
Test Beam Results on the ATLAS Electromagnetic Calorimeters Lucia Di Ciaccio – LAPP Annecy (on behalf of the ATLAS LAr Group) OUTLINE Description of the.
Calibration of the CMS Electromagnetic Calorimeter with LHC collision data Maria Margherita Obertino on behalf of the CMS Collaboration Introduction The.
Energy Calibration of BESIII EMC  ‘Digi’-calibration Bhabha calibration  0 calibration Radiative Bhabha calibration  ‘Cluster’-calibration.
Régis Lefèvre (LPC Clermont-Ferrand - France)ATLAS Physics Workshop - Lund - September 2001 In situ jet energy calibration General considerations The different.
LHC Symposium 2003 Fermilab 01/05/2003 Ph. Schwemling, LPNHE-Paris for the ATLAS collaboration Electromagnetic Calorimetry and Electron/Photon performance.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
CMS ELECTROMAGNETIC CALORIMETER Jean-Pierre Ernenwein OVERVIEW 6th international conference on advanced technology and particle physics Villa Olmo, Como,
Calibration of the CMS Electromagnetic Calorimeter with LHC collision data Maria Margherita Obertino on behalf of the CMS Collaboration Introduction The.
M.D. Nov 27th 2002M0' workshop1 M0’ linearity study  Contents : Electronic injection Laser injection Beam injection Conclusion.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
Open and Hidden Beauty Production in 920 GeV p-N interactions Presented by Mauro Villa for the Hera-B collaboration 2002/3 data taking:
Ilhan TAPAN* and Fatma KOCAK
Calibration of the Electromagnetic Calorimeter of the CMS detector
Resolution Studies of the CMS ECAL in the 2003 Test Beam
Overview Detector details Crystals Photo-detectors
CLAS12 software workshop
Panagiotis Kokkas Univ. of Ioannina
CMS Preshower: Startup procedures: Reconstruction & calibration
CMS ECAL Calibration and Test Beam Results
Installation, Commissioning and Startup of ATLAS & CMS Experiments
ELECTROMAGNETIC CALORIMETER
Presentation transcript:

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 1 Calibrazioni del calorimetro: esperienze (L3) e prospettive Egidio Longo

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 2 a ~ 2.5%/√E b < 200 MeV c ~ 0.5% and an angular resolution   ~ 50 mrad/  E CMS ECAL benchmark m  = 2 E 1 E 2 (1 - cos  )  H (m H  100 GeV) ~ 2 – 100 MeV  H /m H ≤ target  low mass Higgs discovery:

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 3 resolution: stocastic term a photostatistics contribution, including –LY –light collection efficiency –geometrical efficiency of the photodetector –photocatode quantum efficiency N pe /GeV = 4000 for 0.5 cm 2 APD  1.6% electron current multiplication in APD, contributing a square root of excess noise factor, F =  1.4 = 2.25% Lateral containment (5  5 matrix)  1.5% Total stochastic term a = 2.7 %

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 4 resolution: noise term b 40 ns shaping time, summed over 5x5 channels Serial noise (p.d. capacitance)  1/  t –150 MeV Parallel noise (dark current)   t, mostly radiation induced –negligible at the start of the experiment –30 MeV after one year at low luminosity –100 MeV after one year at high luminosity Physics pile-up (simulated, with big uncertainties) –low luminosity 30 MeV –high luminosity 100 MeV Total contribution –low luminosity 155 MeV –high luminosity 210 MeV

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 5 resolution: constant term c leakage (front, rear, blind material) CMS full shower simulation < 0.2 % system instabilities designed to be at the permill level –temperature stabilization < 0.1 ˚C (  LY = -1.9 % per ˚C) –APD bias stable at 20 mV (dM/dV = 3%/V) light collection uniformity, Specifications to stay < 0.3%  reached by single face depolishing Key issue to have c  0.5 %  intercalibration by monitor and physics signals at 0.5 % including the radiation damage effect

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 6 resolution at test beam on 1999 prototype 30 preproduction crystals and APDs fit as a function of E: (few crystal intercalibration)

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 7 Is it realistic to require a target 0.5 % intercalibration for such a large scale calorimeter? Look at L3 experience intercalibration

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 8 L3 BGO calorimeter 7680 (barrel) (EC) BGO Crystals PIN diode read-out (no gain) 12 bit ADC for 6 gains (1 to 512) noise level around 1 MeV sparse scan (zero suppression) read-out

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 9 L3 calibration tools Individual Test beam calibration (2-50 GeV e - ) Xenon monitor of the response once per day Bhabha events at Z pole (45 GeV e  ) at LEP200, RFQ calibration (17 MeV  ) Standard in situ procedure: Individual intercalibration with Xe lamps Absolute calibration with bhabha electrons for groups of crystals sharing the same Xe lamp

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 10 test beam calibrations Individual calibration for 7680 crystals –two half barrels in two years (1987,1988) –first half barrel recalibrated in 1988 –4 energies (2, 10, 20 and 50 GeV) –temperature control (nominal ± 0.5 ºC) –temperature monitor (1300 sensors) at 0.2 ºC –fully automated procedure: sequence, positioning, monitor and quality check

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 11 intercalibration in 1990 after Xe corrections 1.25 % % 0.87 % measured resolution MC predicted intercalibration spread (average response decreased by 5 %, due to ageing of some optical component) 1990 Bhabha spectrum

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo years of follow-up system able to track this response decrease (few %/year) porting of previous year calibration: 1.3% spread after Xe+Bhabha corrections: 0.8%

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 13 follow-up at LEP200 at LEP200 (too few Bhabha) add RFQ gun send protons on Li target, producing 17 MeV photons, million events in few days year after year, algorithms improved –several months of work to get final calibrations every year latest result: 1.06% resolution measured on GeV Bhabha electrons  intercalibration contribution 0.5 %

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 14 conclusions for L3 L3 BGO calibration combined test-beam precalibration, monitor and physics events Porting from test-beam to the experiment was performed at < 1.5% After all corrections, first year intercalibration was known at 0.9% After ten years of improvements, intercalibration known at 0.5%

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 15 CMS-ECAL calibration scheme individual crystal precalibration at beam test at several energies intercalibration porting to the experiment via laser monitor system follow-up of radiation damage by laser monitor system calibration by physics events every few months

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 16 calibration ground rules

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 17 ECAL installation in V31 SM assembly electronics calibration

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 18 precalibration We probably will not be able to precalibrate all ECAL supermodules We may be forced to choose between the “production serial precalibration” of the maximum number of modules, or the precalibration of a smaller number of modules with deeper understanding of a few modules to be recalibrated several times

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 19 intercalibration Issue is crystal intercalibration (the energy scale can be fixed relatively simply reconstructing the Z invariant mass with just a few Z  ee) –Raw intercalibration from lab measurements < 6% –Target test beam pre-calibration < 2% –Target final intercalibration using electrons 0.4 Is precalibration crucial? –Not clear how well HLT system will work with 6 % intercalibration –Much easier to understand what is going on with 2 % intercalibration –Precalibration ultimate system test before LHC data taking (F. Cavallari)

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 20 in situ calibrations Baseline intercalibration uses W electrons measured in tracker Calibration electron selection and its efficiency What efficiency to select ‘good’ (not much brem) electrons that can be well reconstructed in 5x5 crystals? Calibration algorithm How many electrons per crystal needed; what is best algorithm to unscramble the calibration constants? To do: simulate the whole procedure (milestone 3/02): Introduce inter-calibration errors and show how well they can be recovered Use of Z  ee invariant mass 5 times less events “internal” ECAL calibration (minimal tracker information needed) can be combined with monitor for absolute calibration Large samples of W’s and Z’s to study these issues (  P. Meriadiani talk)

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 21 alternative intercalibrations What to do if missing pre-calibration and poor electron capability (tracker) ? look at the energy flow in minimum bias –  dependence,  simmetry (?) –trigger bias study on sample of 500k fully simulated mb events available cut out noise

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 22 energy flow calibration (1) Total energy after truncation cuts (200 MeV). Each entry in histogram represents total energy in a single crystal. 360 crystals at the same  Since MC crystals are perfectly calibrated, the width represents the error on intercalibration achievable with 500k events 2% requires 11 M min-bias events  6.6 M crossings  183 hours (at 10Hz) (< 2 months for 30% duty cycle)  2 hours (at 1kHz —to do in HLT farm)

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 23 energy flow calibration (2) limitations: –intercalibration per  raws only (combine with Z absolute calibration ?) –tracker inhomogeneities needs for realistic tracker services simulation (and a combined tracker-ECAL test beam?) –sentitivity to channel-to-channel noise variations better algorithms? –slope of E T rather than truncated mean

Roma, 22/11/01CMS Software & Computing Workshop - E. Longo 24 conclusioni 0.5% difficili ma possibili baseline calibrazioni in situ con W  milestone per 03/02 Roma partecipa attivamente agli studi di calibrazioni con W e Z precalibrazione completa impossibile; studi su possibili alternative iniziati da poco simulazione realistica del tracker essenziale per le prossime produzioni test beam con sezioni di tracker e calorimetro auspicabili