JRA L3 Detector development Progress Report, Oct 2005 Vik Dhillon (Univ. Sheffield) Tom Marsh (Univ. Warwick) Andy Vick (UKATC)

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Andrea Richichi, Puji Irawati, B. Soonthornthum (NARIT) V. Dhillon (Sheffield), T.R. Marsh (Warwick) "Global Observatories and Time- Domain Astrophysics“
Corfu 10/9/07 ( HTRA: ~ 100 ms -- 1μs ) - To develop the most promising technologies for HTRA - Assess relative strengths/areas of application in astronomy.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
The New Passively Biased IFOG. A New Approach to IFOG by TeraEx Eliminating the phase modulator and its driver electronics Utilizing an innovative technique.
Kieran O’Brien ESO, Paranal Science Operations (UCSB, Santa Barbara, California) Vik Dhillon (Sheffield, UK), Tom Marsh (Warwick, UK), Derek Ives (UKATC,
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
Olin Student Projects 2008 Keith Gendreau Code 662 NASA/GSFC
Status of Oxford Setup Matthew Chalk, Erik Devetak, Johan Fopma, Brian Hawes, Ben Jeffery, Nikhil Kundu, Andrei Nomerotski University of Oxford ( 18 August.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Can people meet from 2:40 to 3:30 on Tuesday, September 5?
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Different sources of noise in EM-CCD cameras
DIGITAL ELECTRONICS WHAT IS A DIGITAL CIRCUIT?
1 States report for readout system 1.PHENIX readout system overview 2.High speed data link 3.Digital pilot ASIC 4.Schedule Hiroyuki
High-Time Resolution Astrophysics (HTRA) in FP7 Tom Marsh University of Warwick, UK.
Evaluation of the ARC Controller for the NASA IRTF Anthony Denault, Charles Lockhart, Eric Warmbier, & John Rayner
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Earth Atmosphere.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Detectors for Light Sources Contribution to the eXtreme Data Workshop of Nicola Tartoni Diamond Light Source.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Performance limits of a 55  m pixel CdTe detector G.Pellegrini, M. Lozano, R. Martinez, M. Ullan Centro Nacional de Microelectronica, Barcelona, 08193,
R&D of MPPC for T2K experiment PD07 : Photosensor Workshop /6/28 (Thu) S.Gomi T.Nakaya M.Yokoyama H.Kawamuko ( Kyoto University ) T.Nakadaira.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
1 P. Wilson DAQ Meeting 3/3/99 TDC Full Crate Test l Goal is to test TDCs in environment of full crate of cards äTests at Michigan limited to a few cards/crate.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
A Detector Upgrade for LDSS3 Mike Gladders Jacob Bean (on the phone) with Andreas Seifart, Josh Frieman, John Carlstrom.
Development of Multi-Pixel Photon Counters(MPPC) Makoto Taguchi Kyoto University.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Engineering 4862 Microprocessors Lecture 21
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
1 The Silicon TPC System EUDET Extended SC meeting 31 August 2010 Jan Timmermans NIKHEF/DESY.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
9 Oct, 2001 “High speed” FEB-ROD Testing at BNL Kin Yip Short report for our FEB-ROD system at BNL taking data at ~ 100 kHz: Data Integrity Noise Continuity.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
The InGaAs IR Array of Chunghwa Telecom Laboratory Chueh-Jen Lin and Shiang-Yu Wang, Optics and Infrared Laboratory In 2006, Advanced Technology Laboratory.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 Instrument Control Systems 2014 NGC controller Leander Mehrgan.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
1 Status report 2011/8/12 Atsushi Nukariya. 2 Progress ・ FPGA -> Revision is completed. -> Obtained data from front-end chip. ・ Software.
Brandon Halleran.  The power supply for your personal computer gives your machine all the different voltages it needs to operate properly. It is able.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
Performance of 1600-pixel MPPC for the GLD Calorimeter Readout Jan. 30(Tue.) Korea-Japan Joint Shinshu Univ. Takashi Maeda ( Univ. of Tsukuba)
Work on Muon System TDR - in progress Word -> Latex ?
Instrument Control Systems 2014
Large CMS GEM with APV & SRS electronics
VELO readout On detector electronics Off detector electronics to DAQ
BESIII EMC electronics
Chapter No. 10 General description of electronic units used in radiation measurements. viewpoint of ‘ input-output'-i.e., the input and output signals.
Tagger Microscope Detector & Electronics Status
Optical Receivers 1. Photo Detectors
Eye Movement Tracking Device Senior Design Project: P09004
PHENIX forward trigger review
Presentation transcript:

JRA L3 Detector development Progress Report, Oct 2005 Vik Dhillon (Univ. Sheffield) Tom Marsh (Univ. Warwick) Andy Vick (UKATC)

V2 L3 Driver board ● 2 nd Version of L3 Driver board now fully functional ● Can be added to any Gen III SDSU controller without modification ● Uses standard clock line boosted for L3 voltages ● Computer controlled clock level in 20mV steps ● Good stability

V2 Driver board tests ● Tested with E2V CC87 ● In operation the driver meets our requirements BUT ● We are seeing clock induced charge as per other groups ● There is some feed through of noise to from the DSP circuitry on the SDSU Consequently we are planning to fabricate a third generation of L3 driver.

V3 Driver fabrication ● New driver uses a different voltage source to reduce noise ● New driver will provide more capabilities for “shaping” the clock pulse ● Already designed, awaiting fabrication

L3 Developments ● SDSU has two DSPs, one in the controller and one on a PCI board (via fiber link) ● PCI DSP is relatively unused ● We have added threshold detection code to the PCI DSP ● SDSU transfers raw images to PCI board ● PCI board thresholds, and builds up frame from photon data ● PCI board then transfers frame to PCI ● Fits into existing SDSU system (Ultracam)

JRA Expenditure ● PPARC (UKATC) Submission to Opticon for 2004 was 1523 € – 913 € Direct costs (manpower) – 620 € Indirect costs (travel & equipment) ● Univ. Sheffield Submission to Opticon for 2004 was 0€ ● Univ. Warwick Submission to Opticon for 2004 was 0€

JRA Expenditure ● PPARC (UKATC) Expenditure so far in 2005 is aprox. 1,400 € – 1000 € Direct costs (manpower) – 400 € Indirect costs (travel & equipment) ● Univ of Sheffield Expenditure so far in 2005 is aprox. 32,500 € ● Univ of Warwick Expenditure so far in 2005 is aprox. 700 €

JRA3 2005/2006 Prediction ● PPARC (UKATC) prediction for 1/1/05 to 30/6/06 is 26,000 € at the last estimate – 20,000 € Direct costs (manpower) – 6,000 € Indirect costs (travel & equipment) ● Univ. of Sheffield prediction was 24,000 € – 20,000 € Direct costs (manpower) – 4,000 € Indirect costs (travel & equipment) ● Univ. of Warwick prediction was 6,000 € – 5,000 € Direct costs (manpower) – 1,000 € Indirect costs (travel & equipment)

L3 Spectroscopy tests ● Meeting at ATC 5 th October with ESO staff ● Assumption is that we can use EMMI spectrograph on NTT, La Silla ● ESO are providing drawings for mounting etc ● ESO have said they will loan us an EMMI red cryostat if necessary ● Decision on whether we can use discretionary time, or have to apply for science time, is yet to be resolved

L3 Spectroscopy tests ● Need to develop; – Basic tests for L3 chip on sky – Science tests for spectroscopy in photon counting mode – Science tests for spectroscopy in “low amplification” mode ● We hope to be on sky in mid 2006 ● Time for others to ask for science or instrument tests?

Expenditure to 30/6/2006 ● 15 k€ New cryostat ● 4 k€ New clock driver board fabrication ● 2 k€ Miscellaneous cabling, racking and mechanical parts for EMMI mounting ● 10 k€ Mechanical effort at Sheffield (for cryostat interior, mounting for EMMI, etc) ● 20 k€ Electronics effort at UKATC on L3 ● 15 k€ Shipping and travel to La Silla ● Total 66 k€ between the three institutions