Super Beast- Three-Phase WYE Application

Slides:



Advertisements
Similar presentations
72V - Recoil, Recoil IS, & Instinct New Vehicle Delivery Tips
Advertisements

Charging System Tests & Voltage information Checking the charging system with just a volt meter.
The D.C. Scout Battery Distribution System Ground Locator
Electricity Lesson II Electrical Symbols EE.
UVM CricketSat Assembly Manual. Getting Started Make a hard copy print out of the following page It will help you identify the proper components Place.
 E4 Electrical Installation #1 Power Distribution.
Chapter 24 Three-Phase Systems.
University of Manitoba A How to Guide for Theatre B & C.
Wiring Color Codes for McLean County 4-H Projects.
MOOD LIGHT PCB ASSEMBLY V By Phil Townshend 2008.
Electrical Wiring Residential
Diagnose the Starting System. Fender Covers ! You must have a strong battery to test the starter.
C AN LEMONS PRODUCE A VOLTAGE A IDAN S CHILLING Lemon Batteries.
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS Charging System tests & Voltage information Checking the charging system with just a volt meter.
Unit 27 Three-Phase Circuits
VAT: Volt Ampere Tester
Purpose Learn how to use basic electronic equipment:
Wiring the Desklamp Basics of Wiring. Types of Wire For this project we will be using two types of wire: 3 wire and standard lamp wire. – 3 wire The wire.
E2 Motors and Motor Starting
Mega Beast Product Demonstration HJ Arnett Industries, LLC Portland, OR Chris Shipley, Sales Manager
Electrical Power Distribution in America % Coal 20.4% Nuclear 20.3% Natural Gas 6% Hydro Electric 3.4% Other
We ground the neutral of our Distribution capacitor banks- Why?
1 Advanced D-TAC Testing. 2 D-TAC testing – Part 2 This presentation is meant to be viewed after the introductory presentation ‘D-TAC testing – Batteries.
Pages  In this PowerPoint, write down everything that is RED!!
FOWLER CHAPTER 9 LECTURE 9 POWER IN AC CIRCUITS. POWER IN RESISTIVE CIRCUITS, CHAP 9 WITH A RESISTIVE LOAD, CURRENT AND VOLTAGE ARE IN PHASE. F.9.1 THIS.
Available at: – maintain VEX rechargeable power pack Maintain VEX Rechargeable Power Packs.
4 Amp Load.500 Hard Line Cable SPSM 2 P/S Setup Configuration RF Signal Supplied by RG-6 RF Signal To TV via RG-6 Remove Central Fuse Move 20A fuse from.
White Knight Tap Locator HJ Arnett Industries, LLC Portland, OR
Using a Multimeter McTigue Junior High Technology Ed. Click Here
Electricity Jeopardy Circuits 1 Circuits 2 Electric Current OhmExtra Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final Jeopardy.
1 Air Conditioning Three Phase Power. 2 Most common in commercial and industrial buildings Three hot legs, one ground, and one neutral L1, L2, L3, N,
With a knowledge of how to connect cells in parallel and series, we can figure out how to arrange batteries to deliver a desired voltage, and in some cases,
© 2002 University of North Carolina at Charlotte, ALL RIGHTS RESERVED Basic DC Circuits Review.
1 Capacitance Measurements Using the Digital Multimeter.
Physics 2225: Working With Electronic Equipment Purpose  Learn how to use basic electronic equipment: Digital multi meter Oscilloscope Function generator.
PRACTICAL ELECTRONICS MASTERCLASS (Mr Bell) (COMPUTERS REQUIRED FOR 1 ST & 2 nd PERIOD) 1.
Lecture II Objective: Representation of sequence components
Shore Power System General Location. Shore Power Power comes on to the vessel in the form of 480 Volt, Three Phase, 60 Hz Alternating Current (A/C) electricity.
ELECTRICITY SYMBOLS We have looked at several different symbols We will be using many of them from now on so get used to them.
Exam Review Electricity. Electric Charges An electric charge is a negative or a positive amount of electricity that builds up in an object. Electrons.
Electrical Safety "Shocking Statistics“  There are approximately 290 accidental electrocutions each year.  An additional 800 people die in fires caused.
Residential Wiring Unit 3 – Installation and Planning.
SeaPerch Electrical System. Electrical System Overview Assemble the control box. Make the Cat5 connector. Wire the motors to the tether. Wire the control.
Every electrical system must have three parts, a source, a load, and a circuit.  Source - the origin of electrical potential, such as a battery or 120.
Residential Wiring Unit 3 – Installation and Planning Chaps 9-12.
To install the four wires from the back of the coil machine, loosen the four knobs. Keep each wire in center under each knob, off to the side will allow.
ET 332b Ac Motors, Generators and Power Systems 1 Lesson 11_et332b.pptx.
ELECTRICAL CIRCUITS Multimeter.
Quick Installation – 1/4 Pressure Sensor
Electricity Symbols.
SeaPerch Electrical System
POLYPHASE CIRCUITS Three Phase Circuits
Static Eliminator Maintenance.
Static Eliminator Maintenance.
POLYPHASE CIRCUITS Three Phase Circuits
Principles & Applications Residential Wiring Concepts
Beckwith Tap changer with TapTalk
The D.C. Scout Battery Distribution System Ground Locator
USING A DIGITAL VOLT- OHM - METER
Associated Hazards and Safety Practices
Lesson 11: Transformer Name Plate Data and Connections
To install the four wires from the back of the coil machine, loosen the four knobs. Insert each of the four wires from the side under the knobs. Keep each.
Wiring the Light and Relay
ST800 Service Tester, 800 Amps.
USING A DIGITAL VOLT- OHM - METER
Solar cell setup.
SeaPerch Electrical System
Presented by: HJ Arnett Industries, LLC
Presentation transcript:

Super Beast- Three-Phase WYE Application Presented by: HJ Arnett Industries, LLC Chris Shipley Portland, OR 1-800-684-9844

Super Beast- Guide The Super Beast Imposes an artificial unbalanced load on 120/240 volt VAC service at the meter. This load, or “burden,” shows instantly whether the service problem is on the utility or customer side of the meter by showing a voltage drop on a conductor. Note: Most utilities use a 5-7 volt drop as an indication of trouble. Each utility should set its own standards.

Three-Phase WYE Application The Super Beast can be used on 120/208 volt, 3-phase WYE systems using the portable meter base adapter. When using the portable meter base adapter (HJA-469-500), clipping on to a permanent mete base will give a better reading. The Super Beast is not designed for use on 120/240 volt 3-phase Delta, because 208 volts are present between ground and “high phase” of a standard 3-phase Delta system.

Connecting the Meter Base Adapter If you are using the meter base adaptor here are the proper steps. Hook up the neutral clip to the metal strip through the hole at the bottom of the adaptor

Connecting the Meter Base Adapter Attach the Super Beast into the base adaptor with the green clip located at the bottom of the Super Beast. Hook the alligator clips to the meter socket

Connect to WYE Meter Connect clips of the adapter to neutral, Line 1 and Line 2. Take readings on Line 1 and Line 2. Refer to volt drop guide for possible problems. Note: Black represents the Left Meter on Beast. Red represents the Right Meter on the Beast. Green Black Red

Connect to WYE Meter Move one clip lead from either Line 1 or Line 2 to Line 3 The bottom setup will now test L1-L3. Take readings again by flipping switch to both Left and Right Meters on Super Beast. L2 Green Black Red L3 Green Black Red

Connect to WYE Meter A final test will determine the L2-L3 power quality by moving the black cable from Line 1 to Line 2. ] The following meter examples may occur when testing from line to line. Note: the best method for keeping the Meter order is to keep the black cable on the left and red cable on the right. L1 L2 Black Left Red Right

Applying Load to the Right (Red) Conductor With the toggle switch moved to the right you are applying 20 Amps to the right conductor. One of the following examples will occur. As you will see in this simulated model, the reading is 111V. At most utilities the meters will read 120V +/- 5%. This photo shows no problem on the utility side of the meter. A load is being applied to the right conductor and the right meter only drops 1 volt and the left stays the same.

Applying load to the Red conductor Here we have a partially open Red conductor. The load is applied to the Red Cable side and the right meter drops but the left stays the same.

Applying load to the Red conductor This picture represents a fully open Red conductor with the right meter going blank and the left meter staying at the original 111V.

Applying load to the Red conductor Here we see that there is a partially open neutral due to the decrease in the right meter and an increase on the left meter. Once again if you toggle to the left, you will see the same voltages reversed.

Full Open Neutral You may move the toggle switch to either the left or right and one meter will rise to approximately 240 V and the other will go blank.