PIS - Post Implementation Support-ERP Helpdesk

Slides:



Advertisements
Similar presentations
Publication Module using back end interface. Institution Data Entry Add Documents. Edit/Delete Documents that are added but not yet sent to Institution.
Advertisements

Using the Remedy Requester Console
Using the Self Service BMC Helpdesk
Help File For User Creation Click the “Course” button for Creating/Add User.
HEAT Web User Interface
101 Complete Moodle Tutorial. Logging In Navigate to Your login name will.
HP Service Manager.
Welcome to OpenHouse  The OpenHouse website is located at  It is recommended that this site is viewed at a.
Smart Connect – Supplier Portal Training Module 2 – Creation of Service Confirmation.
07/16/2007Dean User Guide for eCAFSlide 1 Dean’s User Guide for eCAF.
Procedure to raise a PIS docket/ticket in ERP
HP Asset Hub Support through Service Central
Self-paced study guide for Online Performance Evaluations – Detailed steps for Employee Self-evaluation.
© Tech Mahindra & Mahindra Satyam Folder access SSA Phase II.
Online Performance Appraisals. Online Performance Appraisal Online Performance Appraisal will help the employees to fill their appraisals online. There.
Complaint Management System. Process Description Complaints are received from customer via telephone/mail by Call centre agents. Call centre agents log.
Oracle Method | Group Delivery Together. Free your energies New Supplier Registration.
Shipping Bill Demo 1.Role of Unit Maker/CHA user 1.Preparation of a Shipping BillPreparation of a Shipping Bill 2.Submission of Shipping Bill to Unit ApproverSubmission.
Comprehensive Training for Distributor on Help Desk Application
Employee Self Service (ESS) Version Employee Self Service  access from any computer  view their elected withholding, earnings summary, check.
Recruitment Office Procedures Job Posting Requests Creating a Search Committee –Adding Search Committee MembersAdding Search Committee Members –Designating.
PRIOS ARA Limited Agent User Instructions PRIOS ARA Limited Agent User Instructions Professional Repossessors Interactive Operating System.
Register Online Helpdesk By: Linda Leow. Axis Home Page Click on the Support link Go to Axis Home Page.
Online Reporting Guide
ENTERING ELIGIBLE ENERGY RESOURCE APPLICATIONS IN DELAFILE Version 2.0 August 25, 2015.
Click on “SUPERUSER” Please Enter Superuser Login Details and click on Login button.
Technical Support and RMA Tutorial Customer Interaction Center - CIC.
Steps for Registration of an Existing SEZ Developer 1.For Submission of Developer Registration request 1.Creation of a User IDCreation of a User ID 2.Filling.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Free Powerpoint Templates Page 1 Free Powerpoint Templates Ray Payroll Management.
Welcome to IRBManager! To access IRBManager, type the following address in your web browser:
State of Kansas Travel Authorizations Statewide Management, Accounting and Reporting Tool Entering a Travel Authorization Navigation: Employee Self Service.
Click on this. “For Online resume entry” Click on this.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
© ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011.
Department of Tourism Computerization Project Phase I Accreditation JULY 2009.
Knowledge Management Platform Communities of Practice User Guide for CoP users Copyright © 2010 Group Technology Solutions. All Rights Reserved.
Once employee clicks on Query Management System Hyperlink on the Essjay Web Portal Main page, he/she would be prompted for the login details. )Login credentials.
BTSP User Guide (Partners) - Log-In & Ticket Creation -
LOGIN PAGE Login Page Support CRM:
Self Service Student - Parent. Admin Student - Parent Employee.
Login Screen Step 1: Please Enter your individual Login Id and Password Step 2: Click on Submit Button.
Introduction to eCTRC for PIs & Study Staff v
Introduction to Bugzilla. May 12, 2011 What is Bugzilla? Bugzilla is a defect- or issue-tracking system Allows individual or groups of developers effectively.
OBSERVER PORTAL  Accessible from “ObserversPortal”
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved INTERNAL iSupport platform operation guide ISSUE 1.0.
Process of Professional Tax Registration
1 ERP Support Portal ERP Department 25 th November 2015 User Guide.
Government of Bihar Building Construction Department (Bihar State Building Construction Corporation Limited.) Presentation of Online Monitoring of different.
From the home page of mykg2pg
Attachments from Templates in PD2
To the ETS – Crown Mineral Activity Overhole/Coring
To the ETS – Crown Mineral Activity Undisposed Crown Rights
BiMS (Bill Information And Management System)
How to complete a Referral Form via “Student” tab
ePAR - End of Assignment
To the ETS – Crown Mineral Activity Online Training Course
Process of cst-registration
To the ETS – Encumbrance Online Training Course
To the ETS – Crown Mineral Activity Online Training Course
Help file of PG/VIP Reference
Smart Connect – Supplier Portal Training
Welcome! Crown Mineral Activity To the ETS – Crown Mineral Activity
III. Responsibilities of Admin Login – Master Creation
To the ETS – Encumbrance Online Training Course
Introduction to One View Service Center (OVSC)
III. Responsibilities of Admin Login – Master Creation
ENTER THE LICENSE NUMBER
ALC LOGIN_SOLAR SUPPORT
Presentation transcript:

PIS - Post Implementation Support-ERP Helpdesk Power users have been given “Issue reporting rights” on erphelpdesk for their respective Circles/SSAs/Area. Power Users (L1, L2, L3) are executives having good knowledge of ERP processes. L1- SSA/Area/Region/Unit based module SPOC as nominated by the SSA. L2- Circle based module SPOC as nominated by Circle L3- ERP Centre based module core team member.

L1 for a particular module must resolve by corresponding with the necessary units and other module’s L1 and revert to End user with solution. L1 has to report unresolved issue to L2 level of that module through PIS link. L1/L2 must update the status of the issues in the PIS-Mantis. L2 may send back the issue to L1 for getting the required data/processes to resolve the issue. Nomenclature of user ids TN_coimbatore_FICO_L1, TN_Coonoor_FICO_L1, TN_CO_HCMpayroll_L1, TN_CO_MM_L1. Password is erphelp123.

Issue Reporting Ex: Report issue in MM Module, L1 MM must choose location as L2 MM. In the Blank Report page, fill the following details as mandatory and submit the report Select the process from the dropdown menu.(mandatory) Select Assign to from dropdown menu.(mandatory) Write issue summary in short.(mandatory) Write issue description in detail.(mandatory) Select Circle name from dropdown.(mandatory) Provide attachments if required. Issue Reported by Power User may be seen under ‘Reported by Me’ tab in My View.

Issue Resolving L2 Power User can resolve at his/her level: L2 Power User at Circle should click on issue id and then 1) Move the issue to L1 level 2) update status to ‘Resolved’ 3)write the solution under ‘Add Note’ field, 4) Assigned To Reporter. L2 Power user requires feedback from lower level Power User. : L2 Power user should click on issue id and then 1) Move the issue to L1 level 2)update status to ‘Feedback’, 3)Add Note of information required, and then 4)Assign it back to the reporter of that issue. L2 Power user is incapable of resolving hence forward to L3 level for resolution.: L2 Power user should click on issue id and then 1) Move the issue to L3 level 2) update status to ‘Assigned’ and assign to concerned L3.

Important Steps: Whenever Issue is to be send to Higher level for resolving/Lower level for feedback, Issue is to be Moved to appropriate Location by clicking “Move” Button. Then “Status” to be changed and “Assigned To” is to be changed. After completing all the above steps, Pl Confirm whether the issue is assigned to the appropriate person, by clicking the “My View” button or else by typing the issue number and clicking Jump button as done while template uploading. For better Results, Please share the L1/L2 PIS password with all the other L1/L2 PIS users of the SSA/Circle so as to raise the issues for resolving as being followed in KTK.

Issue Closing Issue resolved at any level must be traced back to L1 for closure. L1 must confirm the solution provided, if found OK, he/she should close the issue reported by him. To close an issue, L1 must login by his Id. Select My View, click on issue id of resolved issue and change the status to ‘Closed’.

New User Creation and R&A requirements Required template format is available for new user creation in erphelpdesk (10.197.216.213) under Basis Module link. The sheet is to be filled and attached in the PIS issue. R&A Requirements should also be raised through PIS only. Format is available in the above link. Head of SSA approval copy is also required