Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa 1 STATUS REPORT.

Slides:



Advertisements
Similar presentations
Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 Franck SENÉE1 LP-TPC: Micromegas Panel and Cosmic Muon Trigger.
Advertisements

C T A Camera Mechanics Rich Northrop University of Chicago 1 Design Review Argonne May 9, 2014 Final.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
Status of UCSB LT Testing All 10 slots are equipped with UTRI, PAACB and adapter boards. All 10 UTRI connected to multiplexer. All 10 slots have HV connections.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.

RINDEL Emmanuel – IPNO – Detector Dpt. – 19/10/2011APRIME HPS collaboration meeting 1/9 Ecal and vacuum chamber design Unité mixte de recherche CNRS-IN2P3.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
PAX DETECTOR THERMAL SIMULATION 1Vittore Carassiti - INFN FEFz-Juelich, 27/10/2008.
15. CBM Collaboration Meeting, GSI, Darmstadt, April 12–16, 2010 Status of Front End Electronics N-XYTER PCBs & Power Supply Volker Kleipa, GSI Darmstadt.
SCANNER THOUGHTS AND DESIGNS NN Group Dmitriy Beznosko| Stony Brook.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
GigaTracker Working Group meeting Status of the GTK_carrier /03/2015.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Tbilisi, 10/07/2014V. Carassiti, P. Lenisa 1. Tbilisi, 10/07/2014V. Carassiti, P. Lenisa2.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
TCSP Presentation #3 Team 14 SPOT DASH. Schematics 3 Pages 3 Pages Page 1: Buttons, LEDs, sensors related circuits Page 1: Buttons, LEDs, sensors related.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Humidity Sensors Tests for F-Pixel
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
Layout for Fixel Readout Board fiber Holder The FRBH module will provide structure to the fiber assembly in the Fixel Readout system. header Pots, two.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
BGV 03-nov-2015CERNMassimiliano Ferro-Luzzi 1 BGV cooling : status and TS3 installation plans Valdir & Massi.
Dec
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
US stavelet update 12th April PPB2s on serial power side 12 Apr SAMTEC connector (floating) Bond pad (connected to EoS through WB + bus tape.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
The 96 Chann FED Tester: Greg Iles2 September Channel FED Tester Status –Prototype now fully populated with AOHs. –Forced to borrow seven 2-channel.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
KHARKOV TEAM ACTIVITIES FOR CBM WITHIN THE STCU PROJECT P602 1 Representatives: Prof. Slava Borshchov.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
13 May 2011 Eddy Jans 0 Plans for the VELOpix-module LHCb-Nikhef discussion some specifications some requirements some ideas about the VELOpix-module some.
S A Griffiths CM42 June 2015 Electrical & Control.
Rosier Ph. – IPNO – Detector Dpt. – 30/10/2012GASPARD Padova meeting 1/13 Mechanical engineering for GASPARD Unité mixte de recherche CNRS-IN2P3 Université.
Test beam straw prototype production status
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Status of GASPARD mechanics
Calorimeter Mu2e Development electronics Front-end Review
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
CALICE: Thermal, Mechanical and Assembly issues
cooling and supports of the forward endcap EMC
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
Work packages status in Torino and perspectives
LST Module Installation
HERD Tracker Layout Considerations
EVLA MONITOR & CONTROL CDR
Limited Streamer Tube Project Summary
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Door Heat Exchanger: Specification
Presentation transcript:

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa 1 STATUS REPORT

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa2

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa3 COOLING FEED-THROUGH QUADRANT SUPPORT TARGET CELL

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa4 READOUT ELECTRONICS 3 READOUT PLANS ( 4 PCB + 2 COUPLING BOARDS EACH LAYER 2 DISTRIBUTOR BOARDS SENSORS COOLING BOX INCLUDING 3 LAYERS ( 2 SENSORS EACH LAYER )

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa5 DISTRIBUTOR BOARDS SENSORS LAYER 1 : HERMES SENSORS LAYER 3 : PAX SENSORS LAYER 2 : PAX READ-OUT LAYER 3 READ-OUT LAYER 2 READ-OUT LAYER 1

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa6 READ-OUT BOARDS HERMES SENSORS COUPLING BOARDS TO DISTRIBUTOR BOARDS

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa7 READ-OUT BOARDS PAX SENSORS COUPLING BOARDS TO L3 READ-OUT BOARDS

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa8 READ-OUT BOARDS PAX SENSORS COUPLING BOARDS TO DISTRIBUTOR BOARDS ALL THE CONNECTORS MOVED FROM THE BOTTOM TO THE TOP VIEW

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa9 DISTRIBUTOR BOARDS TO FEED THROUGHS

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa10

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa11

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa12 L2 READOUT - BOTTOM L3 READOUT - TOP L2 –L3 COLD PLATE

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa13 L2 READOUT - BOTTOM L3 READOUT - TOP L2 –L3 COLD PLATE

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa14 CONNECTING L2-L3 READOUT BOARDS

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa15 L3 COUPLING BOARDS COUPLING SUPPORT FRAME

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa16 L3 COUPLING BOARD L3 COUPLING SUPPORT FRAME

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa17 CONNECTING THE L3 CABLES

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa18 L2 COUPLING BOARDS COUPLING SUPPORT FRAME

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa19 L2 COUPLING BOARDS COUPLING SUPPORT FRAME

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa20 CONNECTING THE L2 CABLES

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa21 L1 COUPLING- BOTTOM L1 COUPLING- TOP L1 COLD PLATE COUPLING & READOUT FRAME L1 READOUT- TOP L1 READOUT- BOTTOM FC5-L1 CABLES FC4-L1 CABLES FC3-L1 CABLES

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa22 FC1-L1 & FC2-L1 CABLES

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa23 CONNECTING FC1-L1 & FC2-L1

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa24 DISTRIBUTOR FRAME DISTRIBUTOR BOARDS (ONLY ON THE TOP)

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa25

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa26 CONNECTING THE FC4-L1 & FC5-L1 CABLES CONNECTING THE FC3-L3 CABLES

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa27 CONNECTING THE FEED-THROUGH CABLES

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa28  MODULE COMMISSIONING (FERRARA)  COOLING TEST (COLD PLATES AND COOLING BOX PROTOTYPE)  FATIGUE TEST CHECKING THE ABSENCE OF LEAKS COMING FROM THE TEMPERATURE CYCLES  TEST CHECKING THE STABILITY AGAINST THE VIBRATIONS WITHIN THE RANGE OF THE COOLING FLOW RATE