Pardubice, Czech Republic - 25 Oct 2004

Slides:



Advertisements
Similar presentations
Positive Train Control Benefits
Advertisements

Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST.
Ivan Tuháček UIC ERTMS World Conference, Istanbul 2014
Marmaray A Solution for a High-speed, Cross-urban Application
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
GSM-R Applications in Turkey's High Speed Train Lines Nuri Hakan Ekmekci TCDD, Etude, Project and Investment Department Electrification and Signalization.
Quality of Service in a GSM-R PPP Jean CELLMER UIC ERTMS 2014.
L’Infra, une activité au cœur de la SNCF INFRASTRUCTURE French Highspeed on South East TGV line: 25 years of evolution Jean-Paul BALENSI Vice-president.
ERTMS deployment in Europe and beyond: the global perspective
IRSC DUBLIN OCTOBER 2006 vue n°1 INTERNATIONAL RAILWAY SAFETY CONFERENCE Dublin 23 – 25 october 2006 CIRCULATION OF TRAM-TRAINS ON THE FRENCH NATIONAL.
Thales Axle Counter The Challenges for a modern Train Detection System
© Invensys 00/00/00Invensys proprietary & confidentialSlide 1.
Implementing ERTMS in the UK: Human Factors Implications for Train Drivers Derek Porter Human Factors Skill Leader AEA Technology Rail.
Express Rail Link The First Operational TETRA System for Rail in the World Dr. Aminuddin Adnan CEO Express Rail Link Sdn Bhd 18 May st Malaysian.
SATLOC – state of the art George Barbu – Union Internationale des Chemins de Fer Satellite based operation and management of local low traffic lines.
Complex interlaced infrastructure - onboard testing: how much real scale testing should be needed? 11th UIC ERTMS Conference, Istanbula 1-3 April 2014.
Transport presentation October An integrated railway solutions provider Sales 4.9 B Euros Orders received 4.7 B Euros Employees Market Share.
New Satellite-based Solutions for Train Control Systems
Overview System modelling and holistic simulation :
Ansaldo STS ERTMS: From Standard to Applications Bucharest, 29 th September 2011 Sales & Business Development Signalling Business Unit.
A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based.
ANSALDO: BACKGROUND experience in dependable Signalling Automation Systems experience in dependable Management Automation Systems experience in installation,
ERTMS state of the art and evolution of the applications considering customer’s orientations.
18 September Licensing for Next Generation Signalling Buddhadev Dutta Chowdhury 27 th April 2012.
Peter Gurník, Oldřich Trégl Satellite based train location.
UIC ERTMS World Conference
Flexible, Modular Interlocking Systems for a modern railway network
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
Presentation to Working Group ERTMS on DB SNCF RFF 1 ERTMS PILOT PROJECT Paris - Frankfurt corridor & ICE3 and POS trainsets DB/RFF/SNCF common.
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
EURAILSPEED - Milano – November 8th, 2005 MGV SNCF Train Set for on-board Measurement at Great Velocity Eric REBEYROTTE– Technical Manager of SNCF Engineering.
Signalling: Convergence of needs
Right on Track towards a safe and interoperable Europe? 2 April 2014 Luc Lallemand Vice President EIM CEO Infrabel Belgium Rail Infrastructure Manager.
UIC ERTMS World Conference ERTMS Baselines Pio GUIDO, Head of ERTMS Unit Istanbul, 2 April 2014.
Railway Demonstration. 2 Low-Density Traffic Lines * n Single track, few trains/day –High safety requirements –High installation and maintenance costs.
1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011.
INTERFACING ETCS WITH LEGACY CC-SYSTEMS TRACK - SIDE.
UIC ERTMS Conference - Budapest 4 th -6 th April 2006 STRATEGY AND EXPERIENCES OF THE ERTMS DEPLOYMENT IN SPAIN Antonio Domínguez Chala ADIF.
1 Signal to the future UIC ERTMS Conference Budapest ETCS in Switzerland Views and Learning from an early Investor.
1 ERTMS Applications in India UIC ERTMS Conference 2006 Towards a Masterplan for Deployment Budapest 4 th to 6 th April 2006 Presenters: Howard Revell.
Achievements and lessons learnt by early implementers
CERTIFER 1 J.P PRONOSTP.OZELLO UCI ERTMS CONFERENCE BUDAPEST.
To Create a Better Life through Green Network ERTMS Application in Korean Railroad
Application Analysis on TD-LTE Train-to-ground Wireless Telecommunications Zhengzhou Metro Co., Ltd. Zhengzhou Rail Transit Design and Research Institute.
ERTMS Strategy Group Agenda Item 3 – Key Strategic Issues 11 th April th April 2006.
© SBB I ETCS The Concept of the SWISS ETCS Safety Case The safety case as a basis for achieving the ETCS operating approval in Switzerland.
ALCATEL * ALSTOM * ANSALDO SIGNAL * BOMBARDIER * INVENSYS RAIL * SIEMENS 1 High performance Train Control and Communication System Benefits of ETCS control/command.
ETCS Level 1 Deployment in Luxembourg UIC ERTMS CONFERENCE 2006 BUDAPEST François JAEGER Director CFL Member of the CFL board of.
17 November 2003 This document is confidential and is intended solely for the use and information of the Australian Rail Track Corporation. PRESENTATION.
Olivier Pignal –ERTMS manager -SNCF Engineering
ERTMS/ETCS BENEFITS FOR RAILWAYS WORLD WIDE Norwin Vögeli
UIC ERTMS CONFERENCE 2006 – BUDAPEST 5 th April 2006 Operational Interoperability through ERTMS.
// Eating the Elephant ETCS Requirements for GB railway.
Infrastructure Part 3. Signalling 2 What the TSIs mean…  The on-board system is tightly defined – it has to be able to go anywhere,  The trackside.
FRMCS Traffic Analysis Summary
Positive Train Control
ATMS Overview Australian Rail Track Corporation
Cambrian Lessons Learnt
AusRAIL 2005 M. Pottendorfer / H. Boyer - Alcatel TSD Austria
5/16/2018 ERTMS/ETCS - the European Rail Traffic Management System David Gillan Chairman, UNISIG Director, Business Development, Invensys Rail Systems.
Communications in Railway Centralized Traffic Control Systems
ERTMS Application on Tests and Maintenance
Session II: System authority for ERTMS 4RP Trackside approval
Innovation solution for a decommissioning strategy of the class B:
PROPOSALS ON ETCS COMPATIBILITY TESTING & RE-AUTHORIZATION
Danish Onboard ERTMS Implementation
ATO over ETCS Benoît BIENFAIT 10/2/2016.
INFRASTRUCTURE SOLUTIONS
Panel 1: “ERTMS, deployment, results, advantages, “game changers”
Changes compared to last version
Presentation transcript:

Pardubice, Czech Republic - 25 Oct 2004 Sous-titre (Arial 22 à 24) Experience in ERTMS level 2 Pardubice, Czech Republic - 25 Oct 2004 Dr G. de Tilière - Insérer le texte à mettre en valeur -

ALSTOM Solutions & Products Projects: Example of Switzerland (SBB-SA NBS) and Italy (IHSL) ALSTOM Return of experience Conclusion 2

ATLAS™ 200 solution ERTMS Level 2 Control Centre track-side signals no longer required Movement authority by radio: Euroradio / GSM-R, ... Train position via Eurobalise Train Integrity via RBC “Radio-Based Centre” ATS GSM-R local radio equipment RBC Radio Block Centre Local IXL Local IXL ERTMS on-board + cab-signaling Signal Point Machine Train detection Fixed Beacon relocalisation

ERTMS Product Experience On-board equipment: ALSTOM’s EVC platform>1000 in service (Belgium, Hong-Kong, Netherlands, UK) >2300 EVC to be delivered (including 194 computers for TASS, « Tilt Autorisation and Supervision System », for UK) ALSTOM ’s ETCS MMI (>200 in service) > 4000 to be delivered ALSTOM ’s ETCS antenna similar to that of KVB, the ATC for SNCF (> 7000 in service) > 2500 to be delivered Odometers > 2500 to be delivered 4

ETCS Doppler radar has been tested on all Alstom Test Tracks > 2000 to be delivered Juridical Recorder Unit Cabradio datarack & MMI > 1000 sets GSM-R (Cab-Radio + 2 antennas +MMI) are to be delivered 5

Trackside Products Class B Class A (Start March 2005) ERTMS level 2 ERTMS level 1 Class B Class A (Start March 2005) EUROBALISES: ALSTOM’s experience comes from over 200,000 balises in service (with SNCF KVB), that are similar to Eurobalise. > 19’000 balises to be delivered LEU: Line-side Electronic Unit ALSTOM’s experience comes from 20,000 KVB encoders in service at SNCF/RFF. > 2000 encoders, « LEU », are to be delivered 6

RBC, main feature (ERTMS-L2) Fulfills the latest standards EN50126/8/9, SIL 4 Interoperability: UNISIG spec 2.2.2 Euroradio FFFIS for GSM-R interface RBC Architecture A 2oo3 safe computer system Redundant safe I/O system Industrial workstation for Maintenance and recording. ALSTOM tested the features of on-line RBC, on the 4 Test Tracks (France, Italy, Netherlands, UK) > 24 RBC are to be delivered

ERTMS ALSTOM Solutions & Products ALSTOM Projects; Example of Switzerland and Italy ALSTOM Return of experience Conclusion 8

ERTMS/ETCS trackside Level 1 current commercial projects CFL: ground board May 2005 TASS: board & ground 2003-04 SCMT: board & ground 2004 Zaragoza-Huesca ground 2004 Athens suburban: ground 2004 most projects: SRS 2.2.2

ERTMS/ETCS trackside Level 2 current commercial projects Betuwe Route : Level 2 (ground) June 2005 Belgium L3/L4: Level 1 & 2 (ground) 2006 SBB (Mattstetten-Rothrist) Levels 1 & 2 ~500 cabs 2004..2006 Rome – Naples Bologna – Florence Bologna –Milano Torino Novara (Milano) Level 2 (ground) 2004.. most projects: SRS 2.2.2

ERTMS/ETCS carborne current commercial projects SNCB-M6: 32 cabs 2004-2007 CFL: 146 cabs May 2005.. France bi-std KVB STM: 2006..07 Czech Pendolinos 15 cabs May 2005 EuroAVE Lanzaderas (1 & 2) 118 cabs 2004.. ATB / ATB-NG SBB (Mattstetten-Rothrist) Level 2 ~500 cabs 2004..2005 Cisalpino ETR500 New Pendolino 106 cabs 2004 Athens 16 cabs 2004

ERTMS/ETCS SBB Project Switzerland: SBB - Mattstetten-Rothrist ERTMS/ETCS SBB Project 10 km single track 45 km double track ETCS Level 2 area

Switzerland Mattstetten-Rothrist Maximal speed: 200 km/h Mixed traffic on Level 1 line (Step 1): - ERTMS equipped rolling stock and - ZUB as fallback ( = reversed STM ) equipped rolling stock Mixed traffic on Level 2 line (Step 2) Operational headway: 2 minutes Pure Class 1 specifications (SRS version 2.2.2) 13

ALSTOM Scope : Switzerland Mattstetten-Rothrist Trainborne: > 500 cabs, including: ETCS (EVC, MMI, JRU...), GSM-R data, GSM-R voice, analogue radio Trackside: 1 RBC and local peripherals - LCS for local train supervision, including implementation of TSR, (Temporary Speed Restrictions) - LMS, Local Maintenance Station System Integration: 1 electronic IXL + train detection products (Alcatel) Balises (Siemens) Interface with GSM-R network Installation, Maintenance, After-sales support

Switzerland Mattstetten-Rothrist Step 1: Service in Dec. 2004 with partial ERTMS ERTMS fallback:ERTMS L2 HW & SW but with specific dataprep for use of MMIs & interfaces 130 trains in service, 250 trains for Dec 2004. Target: 1 min delay per train per week for 12 Dec 2004 Step 2: Full ERTMS L2 functions V&T trainborne and trackside passed System FAT end of Nov 2004 Pre system test on site in June-July 2004 Full supervision Entry-exit scenarios Integration test IXL-RBC + Trackside-trainborne communication SAT System planned for mid 2005 Safety case “fit” for ERTMS L2 operation end 2005/2006

Real HW/SW data used for system FAT Switzerland Mattstetten-Rothrist Trackside Tests RBC IXL RIS Real HW/SW data used for system FAT 16

Switzerland Mattstetten-Rothrist Onboard Tests 17

IHSL Roma Napoli: ERTMS L2 Verone Moncenisio Milan Trieste Moncenisio Padova Venise Turin Genova Bologne Florence Rome Naples Lines to be implemented Battipaglia Lines for which the detail design has been drawn up Planned lines ERTMS Level 2 on high-speed network

Rome-Naples Line characteristics 216 km and 18 Stations Max speed 300 km/h Operational headway 5 min Typical block 1500 m ERTMS (3 RBCs & 15’000 Balises) complete system test in 2004 Trains runs at 300 km/h with overlap of 2 RBC/IXL achieved in May 2004 August 27/04 system test in Tunnel provisional acceptance expected Jan 05, in revenue service in Dec 2005 Scope includes 27 trains ETR500 + 26 Pendolinos

ERTMS ALSTOM Solutions & Products ALSTOM Projects; Example of Switzerland and Italy ALSTOM Return of experience Conclusion 20

ERTMS: ALSTOM Experience Advance position in ERTMS contracts, strong return of experience on: Trackside - Trainborne - System Integration System integration & validation: on-board, trackside & system First experience on 4 test tracks Most advanced ERTMS L2 projects Interfaces RBC: - Interface developed with ALCATEL IXL (SA-NBS / SBB) ANSALDO IXL (IHSL / RFI) Siemens TCCS (SBB) - Euroradio + standard protocol Safety case ALSTOM has a generic safety case being assessed by ISA (Trackside/Trainboard) 21

ERTMS: ALSTOM Experience (2) ERTMS L2 Norms & operational rules: Strong experience in the process of implementation of rules and operational scenarios (critical point for operators). Strong Return of experience on Products : ERTMS L1: Athens (Operation for Olympic Games) ERTMS L2: IHSL & SBB => Product improvement, including Ergonomic SBB: Return on experience based on 130 trains in operation Generic on-board solutions: - Implemented on various types of trains - Interfaces developed with - GSM-R networks - Onboard central units ALSTOM has now an advanced return of experience in ERTMS as: - Product provider - System integrator 22

Experience in ERTMS Test Scheme - RBC interface tests - Complete subsystem integration tests - Integration test of indoor equipment before site delivery - Integrated tests to secure delivery of reliable equipment Test phase is critical for successful implementation of projects

ERTMS Test Bench Train-borne Network Transmission Gateway Experience : - Thousands of tests for RBC and EVC - Used by SBB and RFI/FS for validation - Recognized by ISA for Acceptance Train-borne Network Transmission Gateway

ERTMS ALSTOM Solutions & Products ALSTOM Projects; example of SA-NBS and IHSL ALSTOM Return of experience Conclusion 25

ALSTOM reference solution is in operation CONCLUSION With around 15 ERTMS projects in parallel, among which 5 major ones, ALSTOM has a leading position in ERTMS: ALSTOM Baseline SRS 2.2.2 already in hands:  Strong return of experience through full-scale tests and operation Improved Engineering Processes based on current advanced and challenging projects ALSTOM reference solution is in operation with stabilised generic platforms

April 2002 Thanks www.alstom.com www.ertms.com 27