LBT Q1 2009 Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.

Slides:



Advertisements
Similar presentations
Billing and Electronic Health Record Upgrade Project October 23, 2013 Implementation Phase Presenters: Terry Reusser, Michael Snouffer.
Advertisements

LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
Annie Griffith Infrastructure Programme Manager 12 th July 07 Gemini Oracle Software Upgrade (OSU) Project.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
LBT Q Software Review GCS – Guiding and Active Optics.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
©2012 Microsoft Corporation. All rights reserved. Content based on SharePoint 15 Technical Preview and published July 2012.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
Plan of work is the general scheduling of program according to major activities (or phases) such as planning, implementation and evaluation.
LBT Q Engineering Review SAB Static Balancing.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
1 LBT Q Eng/SW Review PWR: Site electrical power.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
LBT Q Engineering Review ENGG – Engineering General.
Transmission Service Requests Overview
347th Maintenance Squadron
سياحة 449 (إدارة وتنظيم المنشآت السياحية)
Safety Group Program Timeline
ARENA Tutorial - Requirements Engineering
Thing / Person:____________________ Dates:_________________
Safety Group Program Timeline
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline
IT Managed Services Transition Weekly Activity Report: May 21st, 2019
2013 Safety Group Advantage Program Timeline
Cell Culture Engineering XI
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
PLAN OF WORK Plan of work is the general scheduling of program according to major activities (or phases) such as planning, implementation and evaluation.
Presentation transcript:

LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting

6-Apr-2009LBT Q Engineering Review Highlights (Q1/2009) Aluminization dates set for July Aluminization dates set for July

6-Apr-2009LBT Q Engineering Review Progress (Q1/2009) Planning From Q1 Review Planning From Q1 Review Next Aluminization Aug 09 on DX Next Aluminization Aug 09 on DX Late July Late July

7-Apr-2009LBT Q Engineering Review Open Issues Technical Technical Documentation for Aluminization System from OSU improved but needs more work Documentation for Aluminization System from OSU improved but needs more work Continuous Upgrade of Aluminization System Continuous Upgrade of Aluminization System Meisner trap for mirror cell Meisner trap for mirror cell Schedule Schedule Find James time to implement a Meisner trap for mirror cell Find James time to implement a Meisner trap for mirror cell Financial Financial None None Resources Resources None None

7-Apr-2009LBT Q Engineering Review Planning (Q2/2009) Buy stuff for the next Aluminization Buy stuff for the next Aluminization