Negotiating a Good Permit (Or, all permits are not created equal) Katie Fendel, P.E. Leonard Rice Engineers, Inc. 303-455-9589.

Slides:



Advertisements
Similar presentations
LOCAL IPP REGULATIONS SEWER USE ORDINANCES Sandra Diorka Director of Public Services Delhi Charter Township.
Advertisements

1 Stormwater Program Videoconference April 23, 2013 Bill Cole, Water Quality Standards Unit.
Whole Effluent Toxicity NPDES Program
Indiana Department of Environmental Management
Whole Effluent Toxicity (WET) Testing Water Quality Standards Workgroup Meeting June 26, 2007.
Clean Water Act SAFE 210. History/Amendments Recent major amendments were enacted in 1972, 1977, and – Established the National Pollutant Discharge.
The WQCD Permitting Perspective Janet Kieler Permits Section Manager.
Flood Hazard Areas & the NJPDES Rule s © 2009 Fox Rothschild Land Use and Environmental Regulation in New Jersey October 14, 2009 Flood Hazard Areas &
Approach for Including Nutrient Limitations within NDPDES Permits Dallas Grossman Division of Water Quality
©Lloyd Gosselink Rochelle & Townsend, P.C. Presented by: LAUREN KALISEK (512) Congress Avenue Suite 1900 Austin, Texas.
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
Storm Water Regulation: What’s Next? Presented to: September 30, 2014.
Water Quality Trading Claire Schary Water Quality Trading Coordinator U.S. Environmental Protection Agency, Region 10, Seattle, WA Region 10, Seattle,
Bureau of Water Overview Wastewater issues Drinking water issues Wrap up topics.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
State Water Resources Control Board and Regional Water Quality Control Boards Regulatory Authority Review and Concepts for a Statewide Order for Composting.
May 2005 Petition for Rulemaking for Regulation of CBM Development Bob Bukantis Water Quality Standards DEQ Planning Division.
National Pollutant Discharge Elimination System -NPDES Permit Process-
Bureau of Water Program Overview Local Government Interest.
Water Treatment Plant General Discharge Permit
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
Inspection Records and Reports NC DWR, Raleigh Regional Office 3800 Barrett Drive Raleigh NC (919)
Concentrated Animal Feeding Operation (CAFO) Regulations - Update Meg Collins Colorado Livestock Association & Landon Gates Colorado Farm Bureau Water.
WQBELs Karen Holligan May 6, WQBELs – A Four-Piece Puzzle Numerical criteria (toxic pollutants) Water body quality Effluent fraction Bioavailable.
Implementation of Antidegradation Policies for Indiana Waters.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Lake Erie HABs Workshop Bill Fischbein Supervising Attorney Water Programs March 16, 2012 – Toledo March 30, Columbus.
Georgia Tech What is Dilution?? Ocean Plan (2001) p. 15: INITIAL DILUTION is the process which results in the rapid and irreversible turbulent mixing of.
Clean Water Act Section 316(b) Proposal Regulations for Cooling Water Intake Structures at Existing Facilities April 6, 2011.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
Hydrostatic Testing Draft General Permit Draft Permit Stakeholder Outreach Meeting April 23, 2015 Moderated by: Lillian Gonzalez, Unit Manager, Permits.
Regulations that Protect Clean Water Jocelyn Mullen, P.E. PART 2 OF PRESENTATION Presented at The Water Course January 27, 2010 Mesa County Water Association.
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
At a watewater Treatment plant near you Clean Water Act  Goal –Fishable –Swimmable  Classifications –Aquatic life –Recreation –Water Supply –Agriculture.
Surface Water Standards Triennial Review and Implementation Connie Brower Nikki Remington-Julie Grzyb-Sandra Moore NC Division of Water Quality.
Calculating Numerical Local Limits Texas Commission on Environmental Quality Texas Pollutant Discharge Elimination System Pretreatment Program.
Antidegradation Standards and Implementation Procedures Overview of Third Notice Comments and Responses March 14,
EPA REGION VI MINIMUM QUANTIFICATION LEVELS (MQLs) WHAT THE “L” IS GOING ON? 25 th EPA Annual Pretreatment Workshop Addison, TX 8/5/09 Allen Gilliam ADEQ.
Overview of Pretreatment Program Regulations 40 CFR Part 403 Pretreatment 101 Short Course 8/3/09 Addison, Texas David Hardgrave ODEQ State Pretreatment.
Designing De Minimis Indiana Antidegradation Workshop April 29, 2008 Brad Klein -- Environmental Law & Policy Center.
ISAT 422: Environmental Management Water Regulations n "Clean Water Act (CWA)" = Water Pollution Control Act of 1972 n Amended by Clean Water Act of 1977.
Procedures to Implement the Texas Surface Water Quality Standards
1 Industrial Waste Data Tracking: Surveys & Other Information Collection Presented by: Melissa Reboul LDEQ Pretreatment MODULE 3.
Antidegradation and Alternatives Analysis Mary E. Gardner Regulatory Programs Administrator Littleton/Englewood WWTP Colorado.
ANTIDEGRADATION and THE BENEFITS OF PUMP LOGS FOR BATCH DISCHARGES Given by: Dan Murray, Terrell Hendren and Josh Frazier.
Overview of the Total Maximum Daily Load Program.
STREAM MONITORING CASE STUDY. Agenda  Monitoring Requirements  TMDL Requirements  OCEA Initial Monitoring Program  Selection of Parameters  Data.
Water Resources Workshop Standards, Use Attainability, Impairments and TMDLS Richard Eskin Maryland Department of the Environment February 20, 2004.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
Streamlining Rules for Pretreatment Regulation Requested changes to Chapters 922 & 923 of the City of Zanesville Codified Ordinances Presentation to City.
PUBLIC HEARING September 15, Draft NPDES Permits for ArcelorMittal Facilities Indiana Harbor West, Central Wastewater Treatment Plant, Indiana.
Connie Brower NC DENR Division of Water Resources.
WQBELs Karen Holligan September 23, WQBELs – A Four-Piece Puzzle Numerical criteria (toxic pollutants) Water body quality Effluent fraction Bioavailable.
Slide 1 California Implementation Water Board Policies.
FUTURE REQUIREMENTS AND GOALS
Framework for CSO Control Planning
Department of Environmental Quality
Submittal And Review Of New And Revised Water Quality Standards
Water Quality Standards Submittal & Review Process
Julie Woosley, Division of Waste Management
John Tinger U.S. EPA Region IX
Spencer Bohaboy Policy Development Specialist Water Quality Policy
Overview of US EPA & State Manure Management Regulations
EPA Region IV and ADEM NPDES Permit Coordination
Julie Woosley, Division of Waste Management
` Permitting Workshop Water Quality Control Division cdphe.state.co.us/wq Pueblo, Colorado May 18, 2005.
Water Quality-Based Effluent Limits
TCEQ Environmental Trade Fair Water Quality Division
EPA’S ROLE IN APPROVING BASIN PLAN AMENDMENTS
Procedures to Implement the Texas Surface Water Quality Standards
Presentation transcript:

Negotiating a Good Permit (Or, all permits are not created equal) Katie Fendel, P.E. Leonard Rice Engineers, Inc

Basic Components of an NPDES Permit  Terms and Conditions  Monitoring Requirements  Additional Monitoring Requirements  Reporting  Management Requirements/Responsibilities  Additional Conditions  Part III (Appendices)

Terms & Conditions Service Area Design Capacity Expansion Requirements Facilities Operation Effluent Limitations Percentage Removal Requirements Compliance Schedules Industrial Waste Management Biosolids Limitations & Management Reqmts.

Regulatory Requirements in Permits  Owner/operator contact info  Location, quantity, quality of discharge  Effluent limitations, standards, & conditions  Monitoring, record-keeping, & reporting requirements  Notification requirements  Compliance schedule if applicable  Submission of pertinent plans & specs in accordance w/ CS  Emergency powers  Inspection & entry  Transfer of permits  Planned alterations/additions  Duty to properly operate & maintain at all times/take steps to minimize violations  Domestic WWTP requirements (80/95%, pretreatment, flow measuring, contracts)  Bypass provisions  Upset provisions  Need to halt not a defense  Sludge disposal requirements  307 toxic effluent standards  Compliance schedule (if applies)  Duty to reapply  Extension if timely reapply  Information requests  BMP requirements  Signatory requirements  Requirement to keep records 3 yrs  Other conditions Division requires  5 year maximum duration (10 years if not subject to federal requirements)  Permit modification, suspension, revocation, reissuance, termination  Stormwater, as applicable

How Effluent Limits Are Calculated  Technology-Based Limits Reg. No. 62, Regulations for Effluent Limitations Reg. No. 62, Regulations for Effluent Limitations  Water Quality-Based Limits (WQBELs) Mass balance equation Mass balance equation February 2003 “Determination of the Requirement to Include Water Quality Standards-Based Limits in CDPS Permits Based on Reasonable Potential” February 2003 “Determination of the Requirement to Include Water Quality Standards-Based Limits in CDPS Permits Based on Reasonable Potential”  Antidegradation-Based Limits (ADBELs) Reg. 31, Basic Standards and Methodologies (Section 31.8) Reg. 31, Basic Standards and Methodologies (Section 31.8) Antidegradation Significance Determination for New or Increased Water Quality Impacts Procedural Guidance, December 2001, updated April 2002 Antidegradation Significance Determination for New or Increased Water Quality Impacts Procedural Guidance, December 2001, updated April 2002

Technology-Based Limits  “Level the playing field”  From Effluent Limitations Regulation BOD BOD TSS TSS BOD & TSS Removal Percentages BOD & TSS Removal Percentages Oil & Grease Oil & Grease pH pH Total Residual Chlorine Total Residual Chlorine  Only use if the most stringent

Water Quality-Based Effluent Limits  Where needed to meet water quality standards  Based on mass balance equation: M2 = [(M3)(Q3) – (M1)(Q1)] / Q2 Q1 = Upstream low flow (1E3 or 30E3) Q2 = Average daily effluent flow (design capacity) Q3 = Downstream flow (Q1 + Q2) M1 = In-stream background pollutant concentrations at the existing quality M2 = Calculated maximum allowable effluent pollutant concentration M3 = Maximum allowable in-stream pollutant concentration (water quality standards)

WQBELs  Upstream background (M1) will vary based on regulatory definition of existing ambient water quality. 85th percentile for most pollutants 85th percentile for most pollutants 50th percentile for metals in total recoverable form 50th percentile for metals in total recoverable form Geometric mean for pathogens such as fecal coliform Geometric mean for pathogens such as fecal coliform  Mass balance equation not applicable for nonconservative pollutants, including ammonia  Do use for fecal coliform/e. coli, chlorine, nitrate, TIN  For ammonia, use new AMTOX model  Calculations incorporate nearby facilities & sources (dirty or clean)  Data needs and how to handle if inadequate data

Antidegradation-Based Effluent Limits  Why do we do this?  3 parts to WQS: Beneficial uses Beneficial uses Criteria to protect BUs Criteria to protect BUs Antidegradation (3 categories) Antidegradation (3 categories)  Subject to antidegradation requirements if: Designated “outstanding waters” or Designated “outstanding waters” or Undesignated Undesignated  Don’t need to do antidegradation review if: Designated “use-protected” Designated “use-protected”  If undesignated, antidegradation review required if new or increased impacts are found to occur

Calculating ADBELs  1 st establish baseline water quality (BWQ) BWQ = water quality as of 09/30/2000 BWQ = water quality as of 09/30/2000 At fully-mixed site downstream of discharge At fully-mixed site downstream of discharge  2 nd calculate Significant Concentration Threshold (SCT) SCT = additional amount of pollutant that will not cause “significant” degradation SCT = additional amount of pollutant that will not cause “significant” degradation SCT = 0.15 × (WQS-BWQ) + BWQ SCT = 0.15 × (WQS-BWQ) + BWQ  Insignificant impacts include: New loads that use < 15% of remaining assimilative capacity (10% for bioaccumulative pollutants) New loads that use < 15% of remaining assimilative capacity (10% for bioaccumulative pollutants) When > 100:1 dilution at low flow (not applicable for bioaccumulative pollutants) When > 100:1 dilution at low flow (not applicable for bioaccumulative pollutants) Temporary impacts (not applicable for bioaccumulative pollutants) Temporary impacts (not applicable for bioaccumulative pollutants)

ADBELs  3 rd, calculate ADBAC (antidegradation-based average concentration)  ADBAC = [(SCT)(Q3) – (M1)(Q1)] / Q2  This is just the mass balance equation using the SCT in place of the water quality standard (M3)…allows you to “use up” the 15% allowable increment (with no “significant degradation”)  ADBELs are applied as a 2-year running average limit

Calculating Reasonable Potential  Only get a limit if there is “reasonable potential” to violate  First determine Multiplier Multiplier based on coefficient of variation and number of samples (table) Multiplier based on coefficient of variation and number of samples (table) Need minimum of 10 data points over 1 year Need minimum of 10 data points over 1 year  Calculate “Maximum Expected Pollutant Concentration” (multiply highest concentration in data by the Multiplier) For acute, use daily maximum data set For acute, use daily maximum data set For chronic, use monthly average data set For chronic, use monthly average data set  Compare MEPC to Maximum Allowable Pollutant Concentration (MAPC) MAPC equals WQBEL MAPC equals WQBEL

Monitoring or Permit Limits?  If MEPC > MAPC (or actual data value(s) > MAPC): Permit limit needed  If 50% MAPC < MEPC < MAPC: Only monitoring needed (no permit limit)  If MEPC < 50% MAPC (and all data values < 50% MAPC): No permit limit or monitoring needed

So which limit do I get?  Technology-based limit is highest limit you can get  If WQBELs apply, must take WQBEL if it is lower than current permitted load  When WQBEL is greater than current permitted load*: 1. If antidegradation review was not required, can have WQBEL 2. If antidegradation applies, then may have either: 1.ADBEL (2-year running average limit), along with WQBEL (as maximum limit), or 2.NIL (non-impact limit), which is a limit based on current permitted load and proposed design flow (NIL = current limit if no change in design flow) * For those pollutants for which permit limits have not yet been established, an implicit load allocation is determined and an implicit permit limit is established.

So which limit do I get?  Can avoid ADBELs by accepting NILs (non-impact limits), which are limits based on current permitted load and proposed design flow. (If accept NILs, facility is not subject to antidegradation review: there is no new or increased load.)  Can also avoid ADBELs by conducting an alternatives analysis per Section 31.8(3)(d), which could result in alternative antidegradation-based limits  No limit if no reasonable potential  However, always get fecal coliform, total residual chlorine limits (& TIN & ammonia if needed for WQS) May currently be meeting these limits, based on treatment processes; absent limits, use of treatment may be discontinued May currently be meeting these limits, based on treatment processes; absent limits, use of treatment may be discontinued State finds this is “reasonable potential” State finds this is “reasonable potential”

Limits Selection Example Pollutant Current Permit Limit (= NIL) (ug/l) (ug/l) Current Permitted Load (lb/day) New WQBEL (ug/l) New WQBEL Load (lb/day)ADBEL(ug/l) As, TR Cu, diss NH3, tot (March) CN, free

WET Requirements  Colorado WQCD Biomonitoring Guidance Document, July 1, 1993 (revised 06/01/02, 09/27/04, 05/01/06)  At application, must submit acute WET test results if: ≥ 1 MGD design flow ≥ 1 MGD design flow Have/required to have approved pretreatment program Have/required to have approved pretreatment program Industrial majors Industrial majors Other considerations (certain effluent characteristics, TMDLs, facility history/compliance record) Other considerations (certain effluent characteristics, TMDLs, facility history/compliance record)  Must submit chronic WET results if: If stream low flow : effluent design flow < 10:1 and receiving stream is Class 1 aquatic life or Class 2 aquatic life with all appropriate aquatic life numeric standards If stream low flow : effluent design flow < 10:1 and receiving stream is Class 1 aquatic life or Class 2 aquatic life with all appropriate aquatic life numeric standards

WET Limits: Acute or Chronic?  Acute conditions apply if: Chronic IWC ≥ 9.1* OR Chronic IWC ≥ 9.1* OR Stream segment is not classified as Class 1 Aquatic Life or Class 2 Aquatic Life use with all of the appropriate aquatic life numeric standards Stream segment is not classified as Class 1 Aquatic Life or Class 2 Aquatic Life use with all of the appropriate aquatic life numeric standards *(same as stream chronic low flow : facility flow ≥ 10:1)  Chronic conditions apply if: Chronic IWC ≤ 9.1** AND Chronic IWC ≤ 9.1** AND Stream segment is classified as Class 1 Aquatic Life or Class 2 Aquatic Life use with all of the appropriate aquatic life numeric standards Stream segment is classified as Class 1 Aquatic Life or Class 2 Aquatic Life use with all of the appropriate aquatic life numeric standards **(same as stream chronic low flow : facility flow ≤ 10:1) Chronic Instream Waste Concentration (IWC) = [Facility Flow (FF)/(Stream Chronic Low Flow (annual) + FF)] X 100%

Monitoring or WET Limits?  No monitoring/no limit if no demonstrated WET and no known pollutants of significance  Monitoring if no demonstrated WET, but are some pollutants of significance (or variable effluent quality)  WET monitoring and limits if WET demonstrated or factors that show “reasonable potential” for WET  Limits effective ≤ 3 years for existing facilities; ≤ 90 days for new facilities

Acute Conditions  Shall be no LC50 at effluent concentrations ≤ 100% effluent (if no instantaneous mixing is provided)

Chronic Conditions  2 Chronic Lethality WET Limits: 1. Shall not be any statistically significant difference in toxicity between control & any effluent concentrations ≤ IWC 2. IC25 (inhibition concentration) shall be ≤ IWC Both look at full range of toxicity (lethality, growth and reproduction)Both look at full range of toxicity (lethality, growth and reproduction)  If statistically significant difference in lethality (95% confidence) between the control and any effluent conc. ≤ IWC and if lethality IC25 < the IWC, permittee required to follow automatic compliance schedule if the observed toxicity is due to organism lethality  If toxicity due to differences in growth of the fathead minnows or the reproduction of the Ceriodaphnia, no immediate action required  May form the basis for reopening permit and including additional chronic toxicity WET limits or other requirements

WET Testing Relief  After 1 year of testing during which no toxicity demonstrated, permittee may request relief on future monitoring Division’s call Division’s call Requires permit modification Requires permit modification  For acute testing, may request use of 6 organisms allowed by EPA  For chronic testing, only allowable species are Ceriodaphnia dubia and fathead minnows

Basic Pretreatment Requirements  Minor POTWs Responsibility to protect POTW Responsibility to protect POTW General discharge prohibitions General discharge prohibitions Industrial categorical limitations Industrial categorical limitations Notification requirements (new introductions) Notification requirements (new introductions) Reopener Reopener State/EPA direct enforcement ability for IUs State/EPA direct enforcement ability for IUs  Majors Without Pretreatment Programs Same as above PLUS Same as above PLUS Annual sampling for metals/cyanide/phenols Annual sampling for metals/cyanide/phenols

Basic Pretreatment Requirements  DWTWs With Approved Pretreatment Programs Pretreatment influent/effluent monitoring (including toxics screen & biosolids screen) Pretreatment influent/effluent monitoring (including toxics screen & biosolids screen) Operate full pretreatment program (including legal authorities, general prohibitions/local/categorical limits, IU permits/control mechanisms, sampling, inspections, enforcement program, ERP, staffing/financial support, SIU violators annual publication, IU updates, spill/slug control evaluations, RCRA notification responsibilities, and others identified on last slide) Operate full pretreatment program (including legal authorities, general prohibitions/local/categorical limits, IU permits/control mechanisms, sampling, inspections, enforcement program, ERP, staffing/financial support, SIU violators annual publication, IU updates, spill/slug control evaluations, RCRA notification responsibilities, and others identified on last slide)

Recent/Upcoming Changes & Potential Effects on Permits  Basic Standards Changes Ammonia Ammonia Temperature criteria Temperature criteria Metals criteria Metals criteria New effluent-dependent/effluent-dominated definitions New effluent-dependent/effluent-dominated definitions Decoupling & antidegradation requirements Decoupling & antidegradation requirements  Others Nutrient standards Nutrient standards Growth related sub-lethal WET Growth related sub-lethal WET

Ammonia Criteria  Adopted EPA’s 1999 Ammonia Update  For cold water (salmonids present, ELSP all year), generally relaxed standards  For warm water (salmonids absent, ELSP April 1 – August 31), generally more stringent standards  Hearing 03/07 to consider changing standards for all basins  SOBP also discusses adoption of temporary modifications to provide reasonable & adequate time for municipalities to address planning, financing, & construction

Temperature Criteria  WQCC adopted new temperature criteria in 2005, effective 12/31/07  Rulemaking hearing scheduled for 01/08/07 to reconsider temperature criteria based on input from panel of experts

Metals Criteria  Metals criteria (table value standards) changed for: Aluminum Aluminum Antimony Antimony Arsenic Arsenic Cadmium Cadmium Uranium Uranium Zinc Zinc  On a site-specific basis, could significantly affect future permit limits for: Arsenic Arsenic Cadmium Cadmium Uranium Uranium Zinc Zinc

New Definitions  Effluent-dependent stream: would be ephemeral without the presence of wastewater effluent, but has continuous or periodic flows for all or a portion of its reach as the result of the discharge  Effluent-dominated stream: would be intermittent or perennial without the presence of wastewater effluent whose flow for the majority of the time is primarily attributable to the discharge of treated water (i.e., > 50% of the flow consists of treated wastewater for at least 183 days annually, for 8 out of 10 years)

Decoupling  Automatic decoupling of Cold Water Aquatic Life Class 2 and Use Protected  Opportunity to decouple Warm Water Aquatic Life Class 2 and Use Protected  Couples Effluent-Dominated and Effluent- Dependent with Use Protected

Permitting Process (What do I get to see when?)  May request pre-application conference/ site inspection  60 days to apply once notified  45 days for completeness determination  Pre-public notice draft review (WQA, Rationale)  Public notice of draft permit  30 day comment period (unless public meeting)

Basics  Permit required for any point source discharge of pollutants to a water of the State (or U.S.)  “State waters” = any and all surface and subsurface waters which are contained in or flow through this State; does not include waters in sewage systems, waters in treatment works of disposal systems, waters in potable water distribution systems, and all water withdrawn for use until use and treatment have been completed

State Exemptions  “Activities such as diversion, carriage, and exchange of water from or into streams, lakes, reservoirs, or conveyance structures or storage of water in or release of water from lakes, reservoirs, or conveyance structures, in the exercise of water rights shall not be considered to be point source discharges of pollution”  Nothing, however, exempts any point source discharger which generates wastewater effluent from the requirement of obtaining a permit.  Cannot require permit for flow or return flow of irrigation water (except as required by Federal or State Acts)

Discharges to Ditches/Other Man-Made Conveyance Structures  Permit for discharge to ditch shall include provisions to: Protect beneficial uses made of water (decreed or in existence prior to inception) Protect beneficial uses made of water (decreed or in existence prior to inception) Comply with any applicable WQS that may be affected by discharge (including downstream) Comply with any applicable WQS that may be affected by discharge (including downstream)

Recent Court Decisions/Rules  South Florida Water Management District v. Miccosukee Tribe of Indians et al. (March 23, 2004 U.S. Supreme Court Decision)  Agency Interpretation on Applicability of Section 402 to Water Transfers (August 5, 2005 EPA memorandum)  National Pollutant Discharge Elimination System (NPDES) Water Transfers Proposed Rule (June 7, 2005 Federal Register Notice)

Thank You! Katie Fendel, P.E. Project Manager Leonard Rice Engineers, Inc.