Frédérick BORDRY – LHCMAC 22- 6th December 2007 Review of the experience of LHC powering: short-circuit tests and sector 7-8 and start of powering sector.

Slides:



Advertisements
Similar presentations
6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
Advertisements

MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.
New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
LARP Collaboration April 26 th 2006 The Commissioning of the Technical Systems of LHC 1.The final validation that all the collider components/systems.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Powering of the Superconducting Circuits: Procedures and Strategies for Circuit Validation Antonio Vergara on behalf of the Hardware Commissioning Coordination.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
R.Schmidt, HC 28/5/ Access to underground areas during powering Risk: accidental massive helium release (as on 19 September) when superconducting.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
For more info:
HC Review F. Rodriguez-Mateos Powering tests The outcome of the work conducted within HCWG and many discussions among colleagues.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
MP3 List of main Issues during March 2010 MP3 - Team.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
July 11, 2007 HC WorkshopG.J. COELINGH - AT / MEL 1 Energy Extraction.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
The prototype test String 2 May 13, 20082Roberto Saban – Academic Training Lecture 1 – Why LHC Hardware Commissioning?
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Powering LHC magnets version 30/3/2007.
Minimum Hardware Commissioning – Disclaimer
The HL-LHC Circuits: Global View and Open Questions
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
The LHC - Status Is COLD Is almost fully commissioned
(tracking between sectors)
Powering the LHC Magnets
MPE main activities planned for LS2
Powering from short circuit tests up to nominal
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Rüdiger Schmidt and Karl Hubert Mess
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
Machine Protection Xu Hongliang.
+ many slides from various colleagues (KH, Rudiger, Paul, …)
Brief report of the hardware commissioning activities
Commissioning of the LHC superconducting magnets systems: Why an LHC Hardware Commissioning? Specificity and complexity of this machine Roberto Saban.
Hardware Commissioning
Review of hardware commissioning
Presentation transcript:

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Review of the experience of LHC powering: short-circuit tests and sector 7-8 and start of powering sector 4-5 Frédérick Bordry Review of the experience of LHC powering: short-circuit tests and sector 7-8 and start of powering sector 4-5 Frédérick Bordry 1.Short-circuit test review 2.Sector 7-8: what was done? Some highlights 3. Sector 7-8: what was not done? 4. What can we do faster when powering for the next sectors ? 5. What can we not do faster when powering for the next sectors ? 1.Short-circuit test review 2.Sector 7-8: what was done? Some highlights 3. Sector 7-8: what was not done? 4. What can we do faster when powering for the next sectors ? 5. What can we not do faster when powering for the next sectors ?

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Short-circuit tests are not only power converter tests: energy extraction tests, DC cables tests, AC network conditions, cooling and ventilation, interlocks, control,… Short-circuit tests (SCT)

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Short-circuit tests

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Circuit Type Sector LHC kA Independently Powered Dipoles Independently Powered Quadrupoles A with Energy Extraction A Energy Extraction in Converter A no Energy Extraction A Correctors TOTAL Circuit Type Sector LHC A Closed Orbit Correctors Short-circuit tests

Frédérick BORDRY – LHCMAC 22- 6th December 2007 From October 2005 to September 2007 Short-circuit tests All tests were successfully concluded by a 24h endurance test (16h at ultimate and 8h nominal)

Frédérick BORDRY – LHCMAC 22- 6th December 2007 General Services: AC Distribution (P,Q, THD) WorldFip fielbus/ WiFI Cooling for Power Converters, Power Cables and Energy Extraction Ventilation (air temperature variation) UPS System Equipment directly linked to the SC circuits: Power Converters 13kA and 600 A EE Systems (+Endurance Tests) Power Cables Control system from equipment to the CCC (Platform to test the software tools) Example: RR77 tests Short-circuit tests

Frédérick BORDRY – LHCMAC 22- 6th December °C FLIR Systems An Infra Red analysis to see what a hand cannot feel at less than 20cm !!! Loose connection Systematic Infra Red (IR) survey 600A cables

Frédérick BORDRY – LHCMAC 22- 6th December 2007 An Infra Red analysis to check everything is OK Systematic Infra Red (IR) survey Y. Thurel 4 racks with 8 * [±600A;±10V] in UA 67

Frédérick BORDRY – LHCMAC 22- 6th December 2007 What did we learn ? Power converters are fulfilling specification but important tests to solve interface problems and coupling problem between circuits (e.g. MB and MQ, 600A circuits, EMC,…) Continuous improvement of PC control and regulation software (FGC : V.99 to V.237) The short circuit tests were essential to validate the power converters in their environment (AC, harmonics, cooling & ventilation, …) Several 24h tests were done twice to confirm DC cabling modification, cooling & ventilations, bad connections, leaks,… Measurement and Validation of the active and reactive power (P,Q) and THD (pt 4 not tested with RF; available P and Q should be confirmed by TS/EL) Control and diagnostics of power elements from the CCC To solve a lot of early failure (“défaut de jeunesse”), especially with the heat runs TO BE READY FOR THE HARDWARE COMMISSIONNING Short-circuit tests A lot of groups worked together in the tunnel

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Hardware commissioning: Sector 7-8 Powering

Frédérick BORDRY – LHCMAC 22- 6th December PIC2 (Power Interlock test with PC connected to the magnets) -Transfer Function Analysis -Power converter and Circuit set-up (Setting of the current loop parameters) (PCC) -Start-up procedure compatible with QPS -Verification of the superconducting splices (PCS) -Powering to Nominal of every circuit with intermediate level ( PLI1… PLI4 => PNO) - Check of the machine squeeze functions (PSQ) - 24-hour run with all the circuits at nominal (PAC) -General emergency stop test (AUG) Powering tests Converters connected to the magnets

Frédérick BORDRY – LHCMAC 22- 6th December Powering Procedures

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Circuit Type Sector LHC kA Independently Powered Dipoles Independently Powered Quadrupoles A with Energy Extraction A Energy Extraction in Converter A no Energy Extraction A Correctors TOTAL Sector 7-8 HW commissioning: released circuits Circuit Type Sector LHC A Closed Orbit Correctors Circuits powered from the arc Limited Current: RB (2 kA), RQD (6.5 kA), RQF (6.5 kA) 3 Only RD2, Inner triplet dipole not available 1 Only RQ4 and RQ Line-N Circuits, 3 spool piece correctors & 2 MQTLH 19 Three Line-N Circuits 3 RCO and inner triplet correctors not available 0 Q4 and Q5 available correctors 7 Total of released circuit 35 Released: 78 R. Saban

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Powering Tests – > History History Sector 78 Dashboard (108/199 circuits in Total)Sector 78 Dashboard ( –Fully Commissioned: 44 circuits 1 x [8kA,8V] converter (RD2) 2 x MQM [6kA, 8V] converters (Matching Q4 & Q5 Quadrupoles) 1 x [±600A,±10V] converter (RQS.L8B1) 8 x [±120A,±10V] converters (Orbit Correctors + RCO.A78B1) 32 x [±60A,±8V] converters (Orbit Correctors) –Partially commissioned: 64 circuits 1 x [13kA, ±180V] converter (Main Dipole) up to 2kA 2 x [13kA,18V] converter (Main Quadrupole) up to 6.5kA 15 x [±600A,±10V] converters up to 200A 46 x [±60A,±8V] converters (Orbit Correctors) Sector 78 – What did we test?

Frédérick BORDRY – LHCMAC 22- 6th December K 4.5K Main dipole circuit powering

Frédérick BORDRY – LHCMAC 22- 6th December 2007

RB successfully started with START_DIDT = 10A/s The FGC regulates dI/dt by controlling dV/dt with a proportional controller New open loop voltage ramp included until I > 1% of I_MIN Blocking voltage during Pre-Mag Main dipole Power Converter Start Up [New algorithm] Start up must avoid rapid voltage changes that can trigger the QPS If current is less than 1% of I_MIN then a blocking voltage must be applied during the pre-mag phase – this winds up the voltage loop integrators This could result in an aggressive start up that could trip the RB QPS so ~6s open loop voltage ramp is now included to make the start up smoother: Q. King

Frédérick BORDRY – LHCMAC 22- 6th December H 7 ppm (100 mA) 2 ppm (20mA) 3 A/s 350 A 45 V

Frédérick BORDRY – LHCMAC 22- 6th December 2007 First current cycle (main dipole) 27th June h27 CET Injection current Imin Fast discharge with switch opened (L/r  100 s)

Frédérick BORDRY – LHCMAC 22- 6th December 2007

Tracking between the three main circuits of sector 78 2ppm Free-wheeling : L/r  23’000 s

Frédérick BORDRY – LHCMAC 22- 6th December 2007 RB decay from 350A takes more than 1 hour with the discharge switch closed New Switch Off algorithm will ramp down the current to 1% of I_MIN (< 4 A) before switching off (<40s) The algorithm will also be used for SLOW ABORT Converter is switched off with V_REF = 2% of V_NEG Voltage is reduced in proportion to the current to smoothly end the ramp to 1% of I_MIN End of a Switch Off ramp on RB dI/dt of ramp down is regulated to be - LIMITS.DIDT by controlling dV/dt with a proportional controller Main dipole Power Converter: Power Off [New algorithm] Q. King

Frédérick BORDRY – LHCMAC 22- 6th December Current loop robustness: L/2r to L/r - Always: static and dynamic I 1 /2 < I 2 < 2xI 1 and I 2 /2 < I 1 < 2xI 2

Frédérick BORDRY – LHCMAC 22- 6th December 2007 RQ4.L8B1 I_MEAS RQ4.L8B2 I_MEAS RQ5.L8B1 I_MEAS RQ5.L8B2 I_MEAS RQ4.L8B1 V_MEAS RQ4.L8B2 V_MEAS RQ5.L8B2 V_MEAS RQ5.L8B1 V_MEAS 0V Close to Limits Squeeze tests (PSQ) : Q4 and Q5 RQ4.L8B2 is close to limit New optic function much improved (15min squeeze) All systems performed as calculated With LHC Software Application LSA: generation of table (I,t) => dI/dt >> between points MQM control touchy during ramp down with 1- Quadrant converter => Good Performance even if the limits are closed D. Nisbet

Frédérick BORDRY – LHCMAC 22- 6th December 2007 I_MEAS = About 1-2ppm pk-pk 1 ms Vout 1300 A 1625 A 6500 A Converter Operation during a sub-converter failure [13kA,18V] converter : (4+1) x [3.25kA,18V] subconverters Tests during 7-8 hardware commissioning 13 kA, 18V 3.25 kA, 18 V At injection current : 860 A Restart of sub-converter 2 V. Montabonnet

Frédérick BORDRY – LHCMAC 22- 6th December 2007

Current Leads badly connected Resistive Current Lead Protection 54 samples V. Montabonnet

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Current Leads badly connected 2 Hours Trip Level Good Cooling Bad Cooling Resistive Current Lead Protection 54 samples V. Montabonnet

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Heat-Run with 44 circuits ( : :30) RB.A78 (2kA) RQF.A78 (6.5kA) RQD.A78 (6.5kA) RD2.L8 (6kA) RQ4.L8 (3.59kA) RQD.A78 (4.21kA) RQS.L8B1 (550A)RCBYH4.L8B2 (72A) RCBYV4.L8B1 (72A) RCBYHS4.L8B1 (72A) RCBYVS4.L8B (72A) RCBYVS4.L8B2 (72A) RCBCH5.L8B1 (80A) RCBCV5.L8B2 (80A) 30 Closed Orbit Correctors (55A) >16h without any fault

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Inner triplet powering (DFBX commissioning, nested converters: decoupling, loop robustness, protection with high time constant and no EE… ) Dipole powering up to 2kA : less than 3 % of the stored energy Quadrupole powering up to 6.5kA (30% of energy) Free-wheel system at high current with large time constant (MB, MQ, IT,…) Only one 600A circuit at nominal (RQS.A78 at 550A) ! High precision OK but low statistics Complete heat run at nominal current (1.1 GJ) Complete AUG test at nominal (partly done but no current in the main circuits) 8kA Q1Q2Q3 6kA I F = I 1 + I 2 I K = I 1 I2I2 V cv 1 V cv2 ±600A V cv3 I1I1 Q2 Sector 7-8: what was NOT done?

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Sector 7-8: what was not done? What can we do faster when powering for the next sectors ? No ELQA at 80 o K then no stop for the cool down Settings of the current loops (TFA done; to do again only if) and more generally automatic FGC configuration Start-up of the converters compatible with QPS 100mV threshold for QPS (nominal) instead of 20mV (MPP for sector 7-8) operating mode automated and parallel sequencing of tests diagnostic tools and Post-Mortem more stable test data recording tools quality assurance and progress follow up learning curve for event analysis above all, the team is built and is performing well Dixit HWC project leader

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Sector 7-8: what was not done? What can we not do faster the powering for the next sectors ? Qualification of the circuits at cold (ELQA) (ELQA per DFB and no more per circuit type. Will be faster) Sequence of qualification of the QPS (FastPa and quench). Quench recovery time at high current will be a key parameter Magnet training above 11kA 350A PIC2 Injection 760A EE SPA FPA Quench 2 kA Loss PP EE Quench 6 kA 8.5 kA 12 kA RB Circuit Quench PM Analysis for each steps “No shortcut or it’ll be the Mess”

Frédérick BORDRY – LHCMAC 22- 6th December /12/ /11/2007 A V 3610A Last news from the field : Q6.R4 (MQY) powering to nominal ( pm) 3610A Unbalanced Quench Nominal Unbalanced1 Unbalanced2 Quench Nominal

Frédérick BORDRY – LHCMAC 22- 6th December 2007

Synchronisation from the database to an FGC 1.When an FGC is power-cycled or reset it raises the SYNC_FGC flag to request to be synchronised 2.The FGC Config Manager sees the request and sends commands to the FGC to read the inventory of equipment in the converter 3.The Manager sends the inventory to the database and retrieves the related configuration 4.The Manager sends commands to the FGC to update its configuration 5.The Manager clears the FGC’s synchronisation request S. Page

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Synchronisation from an FGC to the database 1.A user updates the configuration in an FGC by sending the relevant commands, then sets the SYNC_DB flag 2.The FGC Config Manager sees the request and sends commands to the FGC to read the configuration 3.The Manager stores the configuration changes in the database 4.The Manager clears the FGC’s synchronisation request S. Page

Frédérick BORDRY – LHCMAC 22- 6th December 2007 RB, RQD, RQF synchronized ramp Tracking Tests RB-RQF-RQD D. Nisbet Test Method: I Channel A swapped Regulation with I Channel B