Major Functions Added Scheduled Maintenance Tasks QTT at LOM1 and OnPE SRSF Months Per Year hierarchy XML Data Files Single Item Spares – Multi-Item Extended “Cost Per” Report Initial Buy Report OUGM Graham BrumSlide2
Scheduled Maintenance Add task details for Calendar based tasks Operational Unit based tasks Operational demands for Scheduled spares replacement OUGM Graham BrumSlide3
SM R&O can be done at any LOM On-PE tasks are used to “Inspect” the PE - CBM Scheduled (Calendar) Scheduled (Operational) The LRU is R/R at On-PE when condition is met The removed LRU can be sent to any LOM for repair, R&O OUGM Graham BrumSlide4
Model for SM Total SM Mean Hours per Month = MHRSM(Op) + MHRSM(Cal) MHRSM(Op) = Tasks per Month * Mean Task Time ((TOHM(PE)/MTBSM(Op)) * DC * QinPE) * MTSM(Op) MHRSM(Cal) = Monthly Hours PE * QPE (MTSM * PETPM* QinPE) * QPE PETPM based on MTBSM MB (e.g. Weeks = 4) OUGM Graham BrumSlide5
OUGM Graham BrumSlide6
Quantity of Techs Trained assigned to: LOM1, or On PE at First Line sites Uses Labour Rates as defined for each level OUGM Graham BrumSlide7
SRSF Site Reliability Stress Factor Released in R4.3.2 Allows for Reliability (MTBF) adjustment for: a Part at a Site Multiplier adjustment to MTBF when demands are generated a that specified site for the associated part OUGM Graham BrumSlide8
OUGM Graham BrumSlide9 Select SRSF button Opens form Set SRSF to adjust MTBR for an item at a site
Months Per Year Hierarchy Months per year operating for PE is limited to only operating sites Can be assigned at three levels: Operating months for the PE Operating months for the Site Default value for all PE/Sites Model uses the ‘best’ value from Default, Site, PE OUGM Graham BrumSlide10
XML Transfer Files Data Files: costs; echelon; structure; stock; STE Result Files: results; labour; spares; log Project Transfer File: Every data element in the project Used for transfers between Analyzer and OSAM models. OUGM Graham BrumSlide11
Example Results.xml Results.xml viewed using XML Notepad 2007 from Microsoft OUGM Graham BrumSlide12
Multi selection of Single Item Sparing runs OUGM Graham BrumSlide13 Select one or many items to include Sort by clicking column headers Select method for Target Availability. Manual displays graph for each item
Extended “cost-per” LCC reports A cost breakdown report by Part in the configuration Can select the ‘denominator’ LCC Per PE Per Operating Unit Per Failure Others can be added in the future Suggestions……? OUGM Graham BrumSlide14
Initial Buy Sparing report OUGM Graham BrumSlide15
Future Development ASOAR -> APAU -> DATM Design Availability Target Model MHLH -> ADES -> TLAS Through Life Availability Simulation LORA2 Linear Programming research Extended Task Modelling Business Case Analysis LCC/TLC Cost Breakdown Structures OUGM Graham BrumSlide16