PEDESTRIANS Osama Tabash Khaled El-Yazory Dr. Essam Almasri

Slides:



Advertisements
Similar presentations
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Advertisements

Capacity, Level of Service, Intersection Design (1)
Fixed Time Signal Coordination
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as collector roads and.
Transportation Engineering
INTRODUCTION TO TRANSPORT Lecture 3 Introduction to Transport Lecture 4: Traffic Signal.
Advance Preemption Costs More than Simultaneous Preemption: Fact or Fiction?
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
At-Grade Intersection
Chapter 221 Chapter 22: Fundamentals of Signal Timing: Actuated Signals Explain terms related to actuated signals Explain why and where actuated signals.
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
CTC-340 Signals - Basics. Terms & Definitions (review) Cycle - Cycle Length - Interval -. change interval - clearance interval- change + clearance = Yi.
CE 4640: Transportation Design Prof. Tapan Datta, Ph.D., P.E. Fall 2002.
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
Chapter 5: Traffic Stream Characteristics
Unsignalized Intersections CTC-340. Hmwk At end of powerpoint.
Lec13, Ch.6, pp : Gap acceptance and Queuing Theory (Objectives)
Introduction to Transport
Lec 25, Ch.7, pp : Intersection types and design principles (Objectives) Become familiar with the typical intersection types (See figures 7-1 thorugh.
Signals. Laneage Coding Examples.
Highway Capacity Software (HCS) – Part II
Highway Capacity Software Based on the Highway Capacity Manual (HCM) Special Report 209 Transportation Research Board (TRB), National Research Council.
Lec 14, Ch.8, pp : Intersection control and warrants (objectives) Know the purpose of traffic control Know what MUTCD is and what’s in it Know what.
1 Channelization and Turn Bays CE 453 Lecture 31.
Chapter 17: Basic principles of intersection signalization (objectives) Chapter objectives: By the end of this chapter the student will be able to: Explain.
Lecture #11 Signal Coordination: Chapter 22. Objectives Factors affecting coordination Basic theory of signal coordination Application to arterial progression.
Signalized Intersections
Transportation Engineering
2015 Traffic Signals 101 Topic 7 Field Operations.
Transportation Engineering
CEE 320 Fall 2008 Course Logistics HW7 due today (9 total) Midterm next Friday (Wednesday review) Signalized Intersections (Chapter 7 of text) Last material.
1 Development of countermeasures Hossein Naraghi CE 590 Special Topics Safety March 2003 Time Spent: 6 hrs.
Terminal Design Passenger Processing. errata  Consider TSA impacts.
Intersection Design Spring 2015.
INTRODUCTION An intersection is the general area where two or more highways join or cross, including the roadway and roadside facilities for traffic movements.
1 At-Grade Intersection Design. 2 Objectives Define general intersection design objectives Describe factors that influence curb return design For a nice.
Chapter 20: Actuated Signal Control and Detection
Chapter 5: Traffic Stream Characteristics
Introduction to Transport
1 Intersection Design. 2 Intersection Design – Operational Requirements Provide adequate sight distance – for approach and departure maneuvers Minimize.
Problem 4: Okeechobee Road Stopped Control Analysis.
Fundamental Principles of Traffic Flow
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Pedestrian Design at Intersections Lesson 11 Publication No.
Intersection Design Chapter 7 Dr. TALEB AL-ROUSAN.
Hcm 2010: BASIC CONCEPTS praveen edara, ph.d., p.e., PTOE
Chapter 9 Capacity and Level of Service for Highway Segments
Chapter 191 Chapter 19: Elements of Intersection Design and Layout Make an initial sizing of the intersection Make an initial sizing of the intersection.
HCM 2010: FREEWAY FACILITIES PRAVEEN EDARA, PH.D., P.E., PTOE UNIVERSITY OF MISSOURI - COLUMBIA
Intersection Control Chapter 8 Dr. TALEB AL-ROUSAN.
INTERSECTION MODEL COMPONENTS TTE 6815 K. Courage.
1 Intersection Design CE 453 Lecture Intersections More complicated area for drivers Main function is to provide for change of direction Source.
Signal timing CTC-340. Key Elements Development of safe and effective phase plan and sequence Determination of vehicle signal needs –Timing of yellow.
City of Portland - Isolated Timing Operations January 9, 2005 Isolated Timing Operations - Workshop on Best Practices for Signal Timing Bill Kloos Signals.
SEPARATED BIKE LANE PLANNING AND DESIGN GUIDE. Separated Bike Lane Planning and Design Guide Context Conforms to federal and state standards and guidelines:
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
9.6 Turning Roadways and Channelization, Types of Turning Roadways p.9-55 ~ 9-92 Lean how to determine minimum edge-of-traveled- way radii for the.
LOW COST SAFETY IMPROVEMENTS Practitioner Workshop The Tools – Identification of High Crash Locations – Session #2.
INTRODUCTION TO TRAFFIC ENGINEERING. of roads, streets and highways, their networks and terminals, abutting lands, and relationships with other modes.
Intersection Design Spring 2017.
Evaluation and Re-Design Haifa and Yafa Streets.
Drive Right Chapter 2 Unit 1
Traffic System Management for “Tulkarem”
* Topic 7 Field Operations
Signalized Intersections
Highway capacity and Level of Service Analysis
Transportation Engineering Basic Queuing Theory February 18, 2011
HIGHWAY CAPACITY & LEVEL OF SERVICE (LOS)
Presentation transcript:

PEDESTRIANS Osama Tabash Khaled El-Yazory Dr. Essam Almasri Prepared by Osama Tabash Khaled El-Yazory Supervised by Dr. Essam Almasri

Presentation Outlines: Introduction Pedestrian Capacity Terminology Principles of Pedestrian Flow Pedestrian Walking Speed Performance Measures Level of service Determining Effective Walkway Width Interrupted-Flow Pedestrian Facilities signalized Intersections Unsignalized Intersections Case study

Introduction: The qualitative measures of pedestrian flow are similar to those used for vehicular, such as the freedom to choose desired speeds and to bypass others. Other measures flow related specifically to pedestrian flow include : the ability to cross a pedestrian traffic stream, to maneuver generally without conflicts and changes in walking speed. the delay experienced by pedestrians at signalized and unsignalized intersections. Safety is provided by the separation of pedestrians from vehicular traffic on the same horizontal and vertical plane. Traffic control devices can provide time separation between pedestrian and vehicular traffic.

Pedestrian Capacity Terminology The following are important terms used for pedestrian facility capacity and LOS: Pedestrian speed is the average pedestrian walking speed, generally expressed in units of meters per second. Pedestrian flow rate is the number of pedestrians passing a point per unit of time, expressed as pedestrians per 15 min or pedestrians per minute. Pedestrian flow per unit of width is the average flow of pedestrians per unit of effective walkway width, expressed as pedestrians per minute per meter (p/min/m). Pedestrian density is the average number of pedestrians per unit of area within a walkway or queuing area, expressed as pedestrians per square meter (p/m2). Pedestrian space is the average area provided for each pedestrian in a walkway or queuing area, expressed in terms of( m2/P). Platoon refers to a number of pedestrians walking together in a group, usually involuntarily, as a result of signal control and other factors.

Principles of Pedestrian Flow Pedestrian Speed-Density Relationships The fundamental relationship between speed, density, and volume for pedestrian flow is analogous to vehicular flow. As volume and density increase, pedestrian speed declines.

v ped = Sped *Dped Flow-Density Relationships The relationship among density, speed, and flow for pedestrians is similar to that for vehicular traffic streams, and is expressed in this Equation v ped = Sped *Dped where vped = unit flow rate (p/min/m), Sped = pedestrian speed (m/min), and Dped = pedestrian density (p/m2). or space, as follows: where M = pedestrian space (m2/p).

PEDESTRIAN SPACE REQUIREMENTS A simplified body ellipse of 0.50 m x 0.60 m, with total area of 0.30 m2 is used as the basic space for a single pedestrian. This represents the practical minimum for standing pedestrians. In evaluating a pedestrian facility, an area of 0.75 m2 is used as the buffer zone for each pedestrian. PEDESTRIAN WALKING SPEED Pedestrians exhibit a wide range of walking speeds, varying from 0.8 m/s to 1.8 m/s. If 0 to 20 percent of pedestrians are elderly, the average walking speed is 1.2 m/s on walkways. If elderly people constitute more than 20 percent of the total pedestrians, the average walking speed decreases to 1.0 m/s. On sidewalks, the free-flow speed of pedestrians is approximately 1.5 m/s . Design pedestrian speed = 1.22 m/s ( speed = distance/ Time = 2.43/2 = 1.2 2m/s.)

PERFORMANCE MEASURES CROSS-FLOW TRAFFIC: PROBABILITY OF CONFLICT

Level of service :PEDESTRIAN WALKWAY LOS LOS A: Pedestrian Space > 5.6 m2/p Flow Rate ≤ 16 p/min/m LOS B: Pedestrian Space > 3.7–5.6 m2/p Flow Rate > 16–23 p/min/m LOS C: Pedestrian Space > 2.2–3.7 m2/p Flow Rate > 23–33 p/min/m

Level of service PEDESTRIAN WALKWAY LOS: LOS D: Pedestrian Space > 1.4–2.2 m2/p Flow Rate > 33–49 p/min/m LOS E: Pedestrian Space > 0.75–1.4 m2/p Flow Rate > 49–75 p/min/m LOS F: Pedestrian Space ≤ 0.75 m2/p Flow Rate varies p/min/m

Level of service QUEUING AREA LOS(with standing pedestrians) LOS A Average Pedestrian Space > 1.2 m2/p LOS B Average Pedestrian Space > 0.9–1.2 m2/ p LOS C Average Pedestrian Space > 0.6–0.9 m2/p

Level of service QUEUING AREA LOS(with standing pedestrians) LOS D Average Pedestrian Space > 0.3–0.6 m2/p LOS E Average Pedestrian Space > 0.2–0.3 m2/p LOS F Average Pedestrian Space ≤ 0.2 m2/p

REQUIRED INPUT DATA AND ESTIMATED VALUES Length of Sidewalk: The length of a sidewalk can be approximately equal to the length of an urban street. Effective Width

Street Corner Radius The street corner radius depends on several factors, including: the speed of vehicles, the angle of the intersection, the types of vehicles in the turning volume, and right-of-way limitations on the connecting sidewalks.

DETERMINING EFFECTIVE WALKWAY WIDTH Effective walkway width is the portion of a walkway that can be used effectively by pedestrians. WE = WT – Wo where WE = effective walkway width (m), WT = total walkway width (m), and Wo = sum of widths and shy distances from obstructions on the walkway (m).

INTERRUPTED-FLOW PEDESTRIAN FACILITIES 1) Signalized Intersections The signalized intersection crossing is more complicated to analyze than a midblock crossing, because : it involves intersecting sidewalk flows, pedestrians crossing the street, and others queued waiting for the signal to change.

average pedestrian delay when pedestrian flow rates reach 5,000 p/h . The average delay per pedestrian for a crosswalk is given by this Equation where dp = average pedestrian delay (s), g = effective green time (for pedestrians) (s), and C = cycle length (s).

Pedestrian Area Requirements at Street Corners There are two types of pedestrian area requirements at street corners a) circulation area: is needed to accommodate pedestrians crossing during the green signal phase, those moving to join the red-phase queue, and those moving between the adjoining sidewalks but not crossing the street. b) hold area: is needed to accommodate pedestrians waiting during the red signal phase.

The following Exhibits shows the signal phase conditions analyzed in corner and crosswalk computations. Condition 1: is the minor-street crossing phase during the major-street green, with pedestrians queuing on the major-street side during the minor-street red phase.

Condition 2: is the major-street crossing phase, with pedestrians crossing during the minor-street green, and queuing on the minor-street side during the major-street red phase.

Determining Street Corner Time-Space Available Time-Space The total time-space available for circulation and queuing in the intersection corner during an analysis period is the product of the net corner area and the length of the analysis period (one signal cycle). TS = C(WaWb − 0.215R2) where TS = available time-space (m2-s), Wa = effective width of Sidewalk a (m), Wb = effective width of Sidewalk b (m), R = radius of corner curb (m), and C = cycle length (s).

Holding-Area Waiting Times For Condition 1(major street), the following equation is used to compute holding-area waiting time. where Qtdo = total time spent by pedestrians waiting to cross the major street during one cycle (p-s); Vdo = the number of pedestrians waiting to cross the major street during one cycle, Rmi= the minor-street red phase, or the Don't Walk phase if there are pedestrian signals (s); C = cycle length (s). Note: For condition 2 we can use the same equation by replaced symbols in this equation by the symbols related to minor street

Determining Circulation Time-Space The net corner time-space available for circulating pedestrians is the total available time-space minus the time-space occupied by the pedestrians waiting to cross. TSc = TS − 0.5(Qtdo + Qtco ) where TSc = total time-space available for circulating pedestrians (m2-s), TS = total time-space available (m2-s), Qtdo = total time spent by pedestrians waiting to cross the major street during one cycle (p-s), Qtco = total time spent by pedestrians waiting to cross the minor street during one cycle (p-s).

Determining Crosswalk Time-Space Time-space of a crosswalk at a street corner is computed according to this Equation where TS = time-space (m2-s); L = crosswalk length (m); WE = effective crosswalk width (m); WALK + FDW = effective pedestrian green time on crosswalk (s); Sp = average speed of pedestrians (m/s); and G = green time for phase, if WALK + FDW is not installed (s).

Total crossing time or effective green time required to clear an intersection crossing is computed according to this Equation: where t = total crossing time (s), L = crosswalk length (m), Sp = average speed of pedestrians (m/s), Nped = number of pedestrians crossing during an interval (p), W = crosswalk width (m), and 3.2 = pedestrian start-up time (s).

2) Unsignalized Intersections critical gap : is the time in seconds below which a pedestrian will not attempt to begin crossing the street. For a single pedestrian, critical gap is computed according to this Equation tc: critical gap for a single pedestrian (s), Sp : average pedestrian walking speed (m/s), L = crosswalk length (m), and ts= pedestrian start-up time and end clearance time (s).

If platooning is observed in the field, then the spatial distribution of pedestrians should be computed using below Equation, to determine group critical gap, If no platooning is observed, spatial distribution of pedestrians is assumed to be 1. Where Np = spatial distribution of pedestrians (p), Nc = total number of pedestrians in the crossing platoon (p), WE = = effective crosswalk width (m), and 0.75 = default clear effective width used by a single pedestrian to avoid interference when passing other pedestrians.

Nc = size of a typical pedestrian crossing platoon (p), To compute spatial distribution, the analyst must observe in the field or estimate the platoon size using the following Equation Where Nc = size of a typical pedestrian crossing platoon (p), Vp = pedestrian flow rate (p/s), V = vehicular flow rate (veh/s), and ts = single pedestrian critical gap (s).

Group critical gap is determined using the following Equation where tG = group critical gap (s), tc = critical gap for a single pedestrian (s), and Np = spatial distribution of pedestrians (p). The average delay per pedestrian for a crosswalk is given by this Equation where dp = average pedestrian delay (s), v = vehicular flow rate (veh/s), and tG = group critical gap

Case study This study was done in 2011, where we get this information from graduation Project entitled "Evaluation and design of pedestrian facilities of traffic and engineering in the universities area and the intersection of the Saraya", including this study, process evaluation and design of sidewalks and crosswalk in this areas.

The following graph illustrates the behavior and the movement of pedestrians in Al-Azhar intersection.

pedestrians on the sidewalk+ pedestrians on the street 1)Sidewalks   pedestrians on the sidewalk+ pedestrians on the street sw1+sw1- sw2+sw2- sw3+sw3- sw4+sw4- sw5+sw5- sw6+sw6- sw7+sw7- sw8+sw8- 12:00-12:15 103 59 526 154 74 978 40 163 12:15-12:30 114 632 157 91 555 189 12:30-12:45 146 105 413 200 111 720 51 172 12:45-01:00 118 62 291 156 53 363 44 145 01:00-01:15 207 255 223 98 347 54 185 01:15-01:30 126 35 266 244 80 43 120 01:30-01:45 115 38 213 229 77 337 37 113 01:45-02:00 178 198 86 371 117

Sidewalk (A): Total width = 5.7 m Width Preempted (There is unpaved portion = 2.70 m from the sidewalk display, panel guiding distance of 0.75 m from the edge of the pavement). Effective width = 5.7-2.7-0.75 = 2.25 Flow rate of pedestrians (sw5+sw5-) = 111 ped/15 min pedestrian unit flow rate = 111÷ (15 * 2.25) = 4 ped/min/m. LOS A

Passing on the crosswalk+ Passing outside of the crosswalk Pedestrians crosswalks Table below The sum of pedestrians who Passing crosswalk (R) and pedestrian Passing outside of the crosswalk (R-).   Passing on the crosswalk+ Passing outside of the crosswalk R1+R1- R2+R2- R3+R3- R4+R4- R5+R5- R6+R6- R7+R7- R8+R8- 12:00-12:15 40 36 153 169 130 115 54 65 12:15-12:30 47 38 159 179 109 132 58 67 12:30-12:45 46 37 222 249 123 103 77 81 12:45-01:00 35 27 150 165 75 76 68 50 01:00-01:15 33 25 192 209 89 79 96 01:15-01:30 29 22 217 69 64 70 01:30-01:45 48 204 229 61 82 91 01:45-02:00 51 42 212 237 78

Crosswalk (A-): Effective width = Total width = 4 m. Flow rate of pedestrians (R5+R5-) = 132 ped/15 min pedestrian unit flow rate= 132÷(15* 4) = 2 ped/min/m. < 16 LOS A Assume cycle time = 120 sec. Time permitted to enter the pedestrians = 120 ÷ 4 = 30 sec. Length of crosswalk = width of road = 21 m. Time = distance ÷ speed = 21 ÷ 1.22 = 17.2 seconds = 18 seconds

1st Group = 18 seconds. 2nd Group = 18 +2 = 20 seconds 1st Group = 18 seconds. 2nd Group = 18 +2 = 20 seconds. 3rd Group = 20 +2 = 22 seconds 4th Group = 22 +2 = 24 seconds 5th Group = 24 +2 = 26 seconds 6th Group = 26 +2 = 28 seconds 7th Group = 28 +2 = 30 seconds Flow rate / min = 132 ÷ 15 = 9 person / min. Flow rate / cycle = 9 × 2 = 18 person / cycle time. Each group = flow rate / cycle time ÷ number of groups = 18 ÷ 7 = 2.57 = 3 person / group. Effective width = number of persons / group × width of person = 3 × 0.95 = 2.85m Existing width = 4 m > Effective width Width is adequate

Thank You for attention