WELCOME TSG-S Hosted 3GPP2 Femto Cell Workshop 15-16 OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA 02128 Sponsored.

Slides:



Advertisements
Similar presentations
IEEE MEDIA INDEPENDENT HANDOVER Title: Multi-Radio Power Management Date Submitted: September, 2007 Presented at IEEE 802 September.
Advertisements

Introduction to the Online System for Reflections National PTA Reflections Winner Conrad Channell.
Fostering worldwide interoperabilityGeneva, July 2009 Use of cdma2000 ® Femto Cells for Home Network Applications Home Networking Global Standards.
Easy Application System (EASY) In an effort to streamline and expedite applications for the incentive programs offered by the Arizona Commerce Authority,
Page 1 Norikazu - Nick Yamasaki KDDI Corporation Chair, TSG-S Upcoming Services and Systems Aspects for 3GPP2: 3GPP2 Future Directions and IMT-Advanced.
PWCS WINOCULAR WORKSPACE
HELP GUIDE NEW USER REGISTRATION (SLIDE 2) TAKING A QUIZ (SLIDE 8) REVIEWING A QUIZ (SLIDE 17) GROUP MEMBERSHIP (SLIDE 26) CREATING QUIZZES (SLIDE 31)
1 Technology Readiness Maryland /2015 Admin Schedule 2 AssessmentOnline/CBT Testing Dates PARCC - PBAMarch 2 – May 8 MSA ScienceApril 13.
UConn ECE is your opportunity to take UConn courses while still in high school. The UConn ECE courses you will take are equivalent to the same course at.
WELCOME TSG-S Hosted 3GPP2 Femto Cell Workshop OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA Sponsored.
Effective Date: March 16, 2012 Representatives must submit the following electronically: Request for appeal forms i561 and i501 The Disability Report-Appeal.
Lawson System Foundation 9.0
Introduction to PDE Webinars July Prepare for Your First Webinar Note: You may need help from technical support and/or your network guru. 1. Connect.
Presented by : Uttam Sharma Organization :IIT Kharagpur.
SOURCE:Chair, Editor CONTACT: Alex Gogic – TSG-S WG1 Mike Dolan – ABSTRACT: This contribution.
Welcome to the Second Tutorial Welcome to the second part of this communication system website tutorial! This tutorial is for church planters. When you.
SUMMARY TSG-S Hosted 3GPP2 Femto Cell Workshop OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA Sponsored.
April 1, Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. –Event number: –Event password: 2015B13 To hear.
Seta Management System. Introduction 1.Offline Versions 2.Capturing of Learners and Agreements 3.Capturing of Achievements.
1 Nick Yamasaki Chair, TSG-S 04 December 2008 Review of TSG-S Activities in 2008.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Broadband Wireless Access, RLANs, and Ad-Hoc Networking Jane Brownley Chair TR-45 Document No: GSC16-GRSC9-12.
Parent Middle School Technology Meeting WEDNESDAY, 9/9/2015.
Fostering worldwide interoperabilityGeneva, July 2009 cdma2000 ® Femto Activities Wireless access including RLANs and ad-hoc Networking Global Standards.
SUMMARY TSG-S Hosted 3GPP2 Femto Cell Workshop OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA Sponsored.
How to use Oracle Grid OEM to deploy J2EE applications By: Charles Li Date: 5/2/2005 Updated: 10/12/2005.
1 Summary of TSG-S Femto Related Activities Nick Yamasaki (KDDI) - Chair New Orleans, LA, USA March 31, 2009.
Candidate Time Portal Quick Reference Guide. Welcome to the Time Portal Access your Time Portal through Top Tip – Save the link.
1 17 February 2009 Subject:Draft Presentation for Femto Conference, March 2009 Date: 17 February 2009 Source: Airvana Contact: Doug Knisely
3GPP2 Organization Structure and Roles in Femtocell-Related Work
Cdma2000 Femto Standardization Activities in 3GPP2 Presenter: Douglas Knisely Airvana, Inc. Femtocell World Congress June 2009 Heathrow, UK.
5 November Overview of Proposed Femtocell Architecture Alternatives presented at the 3GPP2 Femto Workshop Airvana 5 November 2007 cdma2000® is the.
Electronic Tools for TIA Standards Development David Thompson Member of the Technical Staff GCS/EWG Meeting Sapporo, Hokkaido, JAPAN August 2000 TC
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
Cdma2000 Femto Standardization Activities in 3GPP2 … Femtocell World Summit June 21 st -23 rd, 2011 London, UK.
3GPP2 Femto Cell Workshop: System Selection, Interference Management, Handoffs and Mobility Ed Tiedemann 15 October 2007.
Introduction to 3GPP2 cdma2000 Technology Workshop Ms. Jane Brownley Chair, 3GPP2 Steering Committee
Doc.: IEEE /044r6 Submission January 2004 Al Petrick, IceFyre, Tim Godfrey, Intersil, Doug Hock Slide 1 Electronic Attendance and Server Update.
In addition to our other quality services, we now offer a Web Accessible Database to view, print, or download your Calibration and Gas Analysis reports.
3GPP2 Specification Development David Crowe cdma2000 Technology Workshop June 14, 2012 – Guangzhou, China Draft Version 0.1.
MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) DATA MANAGEMENT SYSTEM COMPLETING THE COMPLIANCE CERTIFICATION MassDEP, Bureau of Air and Waste.
How to Register on the Nebraska Statewide Telehealth Network Schedule Website?
Adviser Panel. Go to All DD Track Advisers: Click “Advisor Login”
The 3GPP2 Vision Jane Brownley ALU Nick Yamasaki KDDI
Subject:Proposed Liaison from TSG-X to BBF Date: 21 August 2009 Source: Chair, FMOAHG Airvana Contact: Doug Knisely cdma2000® is the.
Submission doc.: IEEE /1214r0 November 2015 Jon Rosdahl, CSR-QualcommSlide 1 1st Vice Chair Report November Dallas Date: Authors:
C Title: Next Steps for Femtocells Date: 03 December 2007 Source: Airvana, Alcatel-Lucent, Nortel Abstract:The contribution addresses.
3GPP2 TSG-SX Structure & Working Procedure Source: TSG-SX Chairman: Xiaowu(Frankle) Zhao TSG-SX Vice-Chair: Yuezhen Wang/Mike Dolan, Copyright Notice 3GPP2.
Submit a Response - Non Construction (First Time - No Addenda)
TestNav: Pearson’s Online Testing Engine Training and Practice Item Review Colorado Summative Science and Social Studies Field Test Spring 2013 Call in:
WELCOME BACK SENIORS!! AUGUST 27,
How to Complete B-13 Checklists in CIMS How to Complete B-13 Checklists in CIMS A Presentation for Transition Coordinators (TCs) and Transition Coordinator.
Ajay Rajkumar, Chair WG Joint Opening Plenary IEEE Session #10 M edia Independent Handover Services Garden Grove, CA Ajay Rajkumar
3GPP2 Special Workshop on 3GPP2 Future Directions and IMT-Advanced Initial Workshop Report Ed Tiedemann (Qualcomm)Chair Clif Barber (KDDI)Secretary
1 Notice Contributors grant a free, irrevocable license to 3GPP2 and its Organization Partners to incorporate text or other copyrightable material contained.
ICT Services and Blended Learning Student Orientation
Overview of TSG-X Femto Standardization Activities
Customer Online Ordering
Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. Event number: Event password: 2015B13 To hear the presentation.
IT for Students Need IT Help? Visit
E Team Registration.
New Client Guide.
Getting Started.
Wireless Access including RLANS & ad-hoc Networking
ELC Blackboard Orientation
How to plan deliverables
Iso Leso - Visionstryt Online CPD Platform – Help File
Wireless Access including RLANs and Ad-Hoc Networking
1st Vice Chair Report November Dallas
Presentation transcript:

WELCOME TSG-S Hosted 3GPP2 Femto Cell Workshop OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA Sponsored by Airvana Wireless SID: FEMTOCELL

15 October 2007 DRAFT 1 Online Access to Registration and Contributions Workshop website: Click “Meeting Electronic Sign In”

15 October 2007 DRAFT 2 Online Registration (1) Enter username/Password: femto/femto

15 October 2007 DRAFT 3 Online Registration (2) Enter address Click “Submit Form”

15 October 2007 DRAFT 4 Online Registration (3) Enter registration data and answer hotel questions Click “Update/Accept”

15 October 2007 DRAFT 5 Online Registration (4) Click “Back to FEMTO Home Page”

15 October 2007 DRAFT 6 Download Contributions (1) Click “Meeting Contributions”

15 October 2007 DRAFT 7 Download Contributions (2)

15 October 2007 DRAFT 8 Introductions Workshop Planning Team TSG-S Chair – Nick Yamasaki TSG-S WG1 Chair – Alex Gogic Airvana Coordinator – Doug Knisely Workshop Coordinator – Clif Barber (KDDI) Additional Planning Support –TSG-A ChairWasuke Sato (KDDI) –TSG-C ChairDennis Gentzler (Alltel) –TSG-X ChairBetsy Covell (Alcatel-Lucent)

15 October 2007 DRAFT 9 Agenda Overview S00-FEMTO GPP2 Femto Cell Workshop Agenda

15 October 2007 DRAFT 10 Note to Presenters In order to get through on time on Tuesday, time limitations will be strictly enforced. –For presentations longer than xx minutes, I will provide a 10 minute warning. –For all presentations, I will provide a 5 minutes warning. Please be prepared to start your presentation ON TIME. The clock starts running as soon as the previous presentation is complete.

15 October 2007 DRAFT 11 Agenda 1: Overview/Tutorial on Femto Cell Technology and High Level Architecture Monday 8:15 AM-12:30 PM Moderator: Clif Barber 009Overview of Femto CellsSAMSUNG15 8:15-8:30 016Tutorial on Femto Cell Technology and SIP/IMS-based Femto Network Architectures AIRVANA90 8:30-10:00 BREAK30 10: Huawei’s view on FemtoHUAWEI20 10:30-10:50 023Network Architecture - Alternatives and Tradeoffs for 3GPP2 Femto Cells QUALCOMM30 10:50-11:20 002SIP Based Architecture for Integration of 1xRTT Femto CellsTATARA SYSTEMS 30 11:20-11:50 005Standard Interfaces for FemtocellALCATEL- LUCENT 15 11:50-12:05 DISCUSSION25 12:05-12:30

15 October 2007 DRAFT 12 Agenda 2: High Level Requirements Monday 1:30-3:10 PM Moderator: Alex Gogic 003Status of 3GPP2 Femto Cell Requirements Work 3GPP2 TSG-S20 1:30-1:50 004Femto Cell Service Requirements and Issues KDDI20 1:50-2:10 DISCUSSION30 2:10-2:40 BREAK30 2:40-3:10

15 October 2007 DRAFT 13 Agenda 3: Radio Interface Issues with Femto Cells Monday 3:10-6:45 PM Moderator: Ed Tiedemann SYSTEM SELECTION 008CDMA System Selection for Mobiles to Find/Use Femtocells ALCATEL- LUCENT 20 3:10-3:30 019Femto Access Control Provisioning and Enhanced System Selection AIRVANA30 3:30-4:00 024Femto Cells –Search and System SelectionQUALCOMM30 4:00-4:30 HANDOFFS AND MOBILITY 020Femto Air Interface Enhancements for Future Mobile Devices AIRVANA30 4:30-5:00 INTERFERENCE MANAGEMENT 021Femto Air Interface Deployment Modeling, Simulation, and Performance AIRVANA20 5:00-5:20 025Interference Management in Femto-Cell DeploymentQUALCOMM60 5:20-6:20 DISCUSSION25 6:20-6:45

15 October 2007 DRAFT 14 Agenda 4: Architecture Decision Points Tuesday 8:00 AM-12:10 Moderator: Betsy Covell 017Femto Network Gateway Architecture and Stage 2 DescriptionAIRVANA60 8:00-9:00 026Femto Network Architecture ConsiderationsNORTEL20 9:00-9:20 018Femto SIP/IMS and Convergence Server (CSRV) Architecture and Stage 2 Description AIRVANA45 9:20-10:05 BREAK30 10:05-10:35 006IMS Services for Femto CellALCATEL- LUCENT 20 10:35-10:55 007Femto Cell Active Hand-offs with Macro CellALCATEL- LUCENT 30 10:55-11:25 015Mobility for FemtoHUAWEI20 11:25-11:45 DISCUSSION25 11:45-12:10 LUNCH65 12:10-1:15

15 October 2007 DRAFT 15 Agenda 5: Femto Cell Standardization Work Plan Tuesday 1:15-2:30 PM Moderator: Eileen McGrath 003Status of 3GPP2 Femto Cell Requirements Work (slide 2) 3GPP2 TSG-S 022Femto Standards Schedule, Work Plan, & Way Forward AIRVANA15 1:15-1:30 DISCUSSION30 1:30-2:00 BREAK30 2:00-2:30

15 October 2007 DRAFT 16 Agenda 6: Summary of Workshop Outputs Tuesday 2:30-5:00 PM Moderator: Clif Barber Review of Workshop Summary DISCUSSION ADJOURNMENT

15 October 2007 DRAFT 17 Download Workshop Participants List (1) Workshop website: Click “Meeting Electronic Sign In”

15 October 2007 DRAFT 18 Download Workshop Participants List (2) Enter username/Password: femto/femto

15 October 2007 DRAFT 19 Download Workshop Participants List (3) Select “Click here to view attendance for a meeting”

15 October 2007 DRAFT 20 Download Workshop Participants List (4) Select “Detailed Version”

15 October 2007 DRAFT 21 Download Workshop Participants List (5) Save as html file or print as an Adobe file

15 October 2007 DRAFT 22 Thank You! For more information, please visit Thank You to Airvana for their sponsorship of this workshop!