Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.

Slides:



Advertisements
Similar presentations
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
Advertisements

Micro MEsh GASeous Detectors (MicroMegas)
sTGC for ATLAS Small Wheel upgrade
Status of the ATLAS MM project
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
D. Peterson, “The Cornell/Purdue TPC”, ALCPG, Snowmass, 23-August The Cornell/Purdue TPC Information available at the web site:
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
F. Murtas LNF/INFN 9 July 2002 GEM Chamber 20x24 cm 2 Status Report F.Murtas for the GEM group  20x24 Prototype  PSI Test Beam  Module 0 Progress 
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
O Ring Groove (1) Bolt holes for fastening strongback to TPC wheel (26) SHV feedthroughs to feed HV wires to ABDB on side ports, all connectors are vacuum.
Large-size micromegas for ATLAS (MAMMA) Status and prospects RD51 mini week, 17/01/2011Joerg Wotschack (CERN)1.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Setting up the Ricoh C305 Press F5 to start the Presentation
Part II: Using PCB Layout Software – Custom Component Libraries
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
T.Schneider/LHCb Muon EDR
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Muon EDR material specification 16/04/20031T.Schneider/LHCb Muon EDR O-ring choice: In the inner part of the Muon system (M2/3 R1/2) we have introduced.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Construction of Prototype B for the COMPASS-II Polarized Drell-Yan Experiment James Mallon of Abilene Christian University for the UIUC COMPASS Collaboration.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
30 October 2003V.Souvorov / B.Schmidt - MWPC PRR CERN site1 MWPC Aging Studies Outline: Overview of aging tests done Results in terms of gain variations.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
The Simulation of the HEC What is presently in the description in GeoModel as presented by Joe Boudreau versus What should be in…
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
LHCb Muon System TDR Outline: Introduction –Physics requirements –Background conditions Overview of the Muon System Physics Performance –L0 muon trigger.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
1 Fulvio TESSAROTTO CERN, 13/11/ COMPASS THGEM meeting Construction of the large size Hybrid Prototype The bulk Micromegas technology Examples of.
Engineering: MWPC design configuration schemas. Wire Pad Chamber (WPC), one gap Avalanche Cdet in parallel to current source (not shown) will reduce current.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
Baby-MIND Modules & Services
P. S. Friedman Integrated Sensors, LLC
Some proposals on HV circuits realization for segmented straw detector
First of all we will remind some numbers:
WARNINGS Side Description COMPONENTS SIDE (TOP) EXPRESSIONS BOARD 1/2
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
SALTRO16 activities in Lund
Presentation transcript:

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details about the PCBs for the pad read out 3.Details about the AW bars 4.Special solutions different to the other designs -Chamber closing (O-Ring + 2.5mm spacer) -HV interface 5. Remaining open issues before mass production -Component choice for capacitors and resistors =>components inside or outside the gas volume -Single/double cathode read out -Test foam panel production for inner regions 6. Time schedule

Muon EDR: Chamber design M2/3 R1/2 16/04/20032T.Schneider/LHCb Muon EDR 1. General description: - 5 panel sandwich construction -4 gas gaps of 5mm each -Combined anode wire/ cathode pad read out

Muon EDR: Chamber design M2/3 R1/2 16/04/20033T.Schneider/LHCb Muon EDR 1. General description: -Wire read out on top -Cathode read out on the sides -HV bus on the bottom

Muon EDR: Chamber design M2/3 R1/2 16/04/20034T.Schneider/LHCb Muon EDR 1. General description: AW read out Signal (black connector) is brought via the Anode wire bars to the HV cards Detector ground (white connectors) is picked up from the opposite cathode planes

Muon EDR: Chamber design M2/3 R1/2 16/04/20035T.Schneider/LHCb Muon EDR 1. General description: Cathode pad read out: Signal and ground (grid of cathode pad structure) is going to the spark protection board (SPB) Additional ground from the other 4 cathodes is connected via soldered copper strips (CMS/EMU solution)

Muon EDR: Chamber design M2/3 R1/2 16/04/20036T.Schneider/LHCb Muon EDR 1. General description HV Supply: HV bus included on the anode wire bar Loading resistors soldered on the out sticking part of the anode wire bar

Muon EDR: Chamber design M2/3 R1/2 16/04/20037T.Schneider/LHCb Muon EDR 2.Details about the PCBs for the pad read out (quarter of PCB) Double sided PCB with 1.6mm thickness 8*8 pad structure (top) Ground grid with ring around (top) Read out traces separated with ground traces (bottom)

Muon EDR: Chamber design M2/3 R1/2 16/04/20038T.Schneider/LHCb Muon EDR 3. Details about the AW bars Kapton layer glued with epoxy on the anode wire bars in PCB production to protect and isolate the HV traces. Smoothes the steps of the HV traces to avoid micro leaks where the O-ring crosses.

Muon EDR: Chamber design M2/3 R1/2 16/04/20039T.Schneider/LHCb Muon EDR 4. Special solutions different to the other designs Chamber closing: O-ring +2.5mm spacer To close and seal the chambers for the inner part of the Muon system a standard Ø 3mm O-ring is used. This solution allows us to test the chambers in the final conditions. In case of problems we can at any time intervene and correct the error with little effort.

Muon EDR: Chamber design M2/3 R1/2 16/04/200310T.Schneider/LHCb Muon EDR 4. Special solutions different to the other designs Chamber closing: O-ring +2.5mm spacer

Muon EDR: Chamber design M2/3 R1/2 16/04/200311T.Schneider/LHCb Muon EDR 4. Special solutions different to the other designs Chamber closing: O-ring +2.5mm spacer Precise bar gluing (2.5mm) and 2.5mm brass spacers guarantee the 5mm gap size Screws close the chamber at the spacer place. A controlled torque of 1Nm is applied to the M5 screws with a dynamometric screwdriver.

Muon EDR: Chamber design M2/3 R1/2 16/04/200312T.Schneider/LHCb Muon EDR 4. Special solutions different to the other designs HV interface: - Because of high density of capacitors special solutions are required: In present design standard components are mounted on external PCB’s -Open HV lines are covered with special varnish -Ground is brought on the side to the PCB (3 pins)

Muon EDR: Chamber design M2/3 R1/2 16/04/200313T.Schneider/LHCb Muon EDR 5. Remaining open issues before mass production Alternative solution for HV interface: The use of SMD components would allow us to mount them on the chamber /in the gas volume. Advantages: -no HV cards/connectors -HV components in the gas volume not exposed to external humidity changes =>better dark current behavior

Muon EDR: Chamber design M2/3 R1/2 16/04/200314T.Schneider/LHCb Muon EDR 5. Remaining open issues before mass production Single/double cathode read out:pad wire plane  wire plane full groundpad Advantage of double cathode read out is the double signal pulse height on the pads For cathode readout only: =>Tested successfully on M1R1 prototype. For combined readout: =>Will be tested in the June test beam

Muon EDR: Chamber design M2/3 R1/2 16/04/200315T.Schneider/LHCb Muon EDR 6. Time schedule June test beam: Single/double sided cathode read out test on combined read our Proto-type (M2R2) July: Aging test in Casaccia (test of SMD components inside the gas volume) August test beam: Module 0 M3R1 (foam panels) test September: PRR for CERN production site